Traffic

Many self-made three-wheeled vehicle drivers labeled "injured soldiers, disabled" are handled

|

Hanoi - Many self-made three-wheeled vehicle drivers, with logos labeled "injured soldiers, disabled" were fined by traffic police forces.

Man dies after motorbike crashes into truck in Lam Dong

|

Lam Dong - A man died after driving a motorbike into the rear of a truck traveling in the same direction through Thuan Hanh commune.

Boat not yet operating, students still cross the Cau River to school by canoe

|

Thai Nguyen - While the ferry terminal is completing procedures to resume operation, students are still moving to school by specialized canoe.

The largest barge stuck at My Chanh bridge has been relocated

|

Quang Tri - The largest barge trapped at My Chanh bridge and the railway bridge has been successfully moved and towed to a safe location by rescue forces.

Rushing to construct a nearly VND 2,970 billion intersection connecting the Ben Luc - Long Thanh expressway

|

Ho Chi Minh City - After more than two months of construction, the Rung Sac road intersection project connecting the Ben Luc - Long Thanh expressway is being urgently constructed.

Some buses in Ho Chi Minh City do not stop completely when picking up passengers, the risk of traffic accidents

|

Ho Chi Minh City - Some buses do not stop when they pick up passengers, urge passengers to get up and down the bus, potentially at risk of accidents for passengers and pedestrians.

Lao Cai Sports Center officers violate the frame alcohol content

|

Lao Cai - Violation of frame alcohol content, 1 officer of the Provincial Sports Training and Sports Competition Center was fined 35 million VND

Metro tunnel excavators - Hanoi Railway Station is about to advance through the residential area

|

Hanoi - Metro tunnel dug machine - Hanoi "speedy" station is moving in the S10 station area, preparing to enter the residential area.

The road connecting Nam Tu Liem - Ha Dong touches the finish line, is expected to open the car before 30.4

|

Hanoi - Project on construction of Le Quang Dao street has basically completed the main items, proposed to clear the whole route in April 2025.

Planning for sea encroachment to build Ly Son airport

|

Quang Ngai - The planning of the sea encroachment to create a new land fund, expand the space to invest in building Ly Son airport is necessary, because the area of ​​the island is not large and the population density is high.

Land acquisition nearly 110 households built overpasses, saved black spots in Hanoi

|

Hanoi - Nearly 110 households will be recovered with land and ground clearance to build overpasses at black congestion in Ha Dong and Thanh Tri districts.

The conversion car operates on Hanoi street, potentially dangerous traffic

|

Hanoi - UAZ, Jeep cars ... converted, carrying tourists operating on the streets, there are many risks of traffic safety.

The concrete bridge for more than 50 years is at risk of subsidence

|

Thanh Hoa - For many years, people in a ward in Thanh Hoa City have to go through a bridge with a hammock, seriously degraded and at risk of subsidence at any time.

The path for the visually impaired in Can Tho leads to the stump, electric pole

|

Can Tho - Instead of facilitating, making floating roads (for visually impaired people) led people to pedestrians on a towering tree on the sidewalk.

Applying for a license to relocate and cut nearly 100 trees to open the center of Hanoi wide 50m

|

Hanoi - Functional branches are applying for compassion and moving nearly 100 trees to implement the project of Ring Road 1 section of Hoang Cau - Voi Phuc.

Details of the parade and parade routes will pass on April 30

|

Ho Chi Minh City - Below is the expected roadmap for the parade and parade delegations that will move through on April 30, so that people can take the initiative in moving and monitoring.

Ho Chi Minh City announced a new traffic plan around Tan Son Nhat station

|

Ho Chi Minh City has officially announced the plan to organize the traffic organization connecting Tran Quoc Hoan - Cong Hoa, serving to connect to T3 station of Tan Son Nhat Airport.

On the occasion of 30.4-1.5, Hanoi increased more than 600 vehicles to serve passengers

|

Hanoi - Hanoi Bus Station Joint Stock Company plans to increase more than 600 vehicles to serve the travel needs of people during the holiday on April 30 - 1.5.

North - South highway in Ha Tinh basically completed, about to connect routes

|

Ha Tinh - representative of the investor of 2 projects of the North - South highway through Ha Tinh affirmed that it would be constructed to ensure the progress to clear the main route on April 28.

The 1.4km road causes hardship for people and workers

|

Vinh Long - The project to upgrade 1.4km of roads in Long Ho construction for many months is still unfinished, making people and workers face many difficulties.