Traffic
Ho Chi Minh City invites investment in 9 metro lines worth nearly 1 million billion VND
|
Ho Chi Minh City calls for investment in 9 metro lines with a total capital of more than 981,000 billion VND, more than 374 km long in the period 2026 - 2030.
Ho Chi Minh City urgently repairs 2 heavily damaged roads, causing congestion in the South
|
Ho Chi Minh City - Two Ben Nghe and Luu Trong Lu roads are seriously degraded, causing prolonged traffic jams, Ho Chi Minh City requests urgent repairs to remove traffic bottlenecks in the Southern area.
Ho Chi Minh City assigns research to expand Rung Sac road to 10 lanes
|
Ho Chi Minh City assigned research to expand Rung Sac road to 10 lanes to meet traffic demand and anticipate the development wave in Can Gio.
Ho Chi Minh City builds Kenh Ngang bridge No. 2, people escape the scene of going around
|
Ho Chi Minh City is implementing the Kenh Ngang No. 2 bridge project, increasing traffic connectivity, reducing round trips, contributing to completing infrastructure in the South.
The Viet Tri - Hoa Binh route will be commented on by ministries before April 20
|
The Government has just issued directives on the proposal to build the Viet Tri - Hoa Binh road of Phu Tho Provincial People's Committee.
Northwest end of day: Landslide on national highway connecting Cao Bang and Ha Giang
|
Landslide on the main national highway connecting Cao Bang and Ha Giang; Drilling and destroying the road surface on the remaining section of Phong Chau bridge; Bustling in the excavation capital in Yen Bai are some of the prominent news.
Motorcycles banned from Hoan Kiem and Ba Dinh from 2025
|
Hanoi - From 2025, motorbikes that do not meet level 2 emission standards will be banned or restricted from entering low emission zones. So how is this standard regulated?
Banning a series of vehicles on many routes in Dong Da and Hai Ba Trung
|
Hanoi - An Trach Street (Dong Da) and Minh Khai Street (Hai Ba Trung) have been adjusted to reorganize traffic and flow.
Official ban on cars with more than 29 seats from entering Nha Trang center
|
Khanh Hoa - The locality officially banned passenger cars with more than 29 seats from entering Nha Trang city center from December 20.
Kien Giang operates traffic violation camera system
|
Kien Giang - Starting from 0:00 on January 1, 2025, penalties for violations of road traffic safety order will be implemented through the camera surveillance system.
Another fishing boat ran aground and was sunk by waves at La Gi estuary
|
Binh Thuan - A fishing boat ran aground at La Gi port and sank after being hit by a big wave. The three workers on board managed to swim to shore.
Teenager riding a motorcycle without a license plate crashes head-on into a car in Hoa Binh
|
Hoa Binh - Authorities are investigating a traffic accident on National Highway 12B through Lac Son district that injured two people.
Hanoi adjusts traffic organization on An Trach street
|
Hanoi - The Department of Transport has just announced the adjustment of traffic organization on An Trach Street (Dong Da District).
Danger lurks on degraded highway in Binh Dinh
|
Over the past month, after many heavy rains, the main national highways through Binh Dinh province have fallen into a state of serious degradation. The damaged and eroded road surfaces have caused frustration for residents and drivers.
Start drilling and breaking the road surface on the remaining Phong Chau bridge section
|
Phu Tho - Truong Son Construction Corporation is drilling and breaking the road surface on the remaining Phong Chau bridge section in Phung Nguyen commune, Lam Thao district.
191 streets in Hanoi are eligible for vehicle parking
|
Hanoi - The Hanoi People's Committee has just approved 191 roads and streets that are eligible for parking on part of the roadway.
Overloaded driver delayed for more than 2 hours, not cooperating with traffic police
|
Hanoi - Overloaded by more than 30% but the driver refused to cooperate with the Traffic Police, delaying for more than 2 hours.
Current status of the 20-year-old bridge across the Da River after repair
|
After a period of suspension for repairs, Trung Ha bridge connecting Phu Tho province and Hanoi capital has returned to normal operation.
Accelerating construction of strategic roads through 3 northern provinces
|
The parallel project of Beltway 4 in the Capital region is being focused on by localities, striving to complete the route in 2025.
Relocating a series of trees to open a 5 times wider road in Hanoi
|
Hanoi - Many trees with a trunk diameter of 15-40 cm will be moved and cut down to widen the 7 km long road from 8-10 m to 50 m, with an investment capital of 5,484 billion VND.