Traffic

Hanoi Highway 16 years not completed, Ho Chi Minh City sets land handover deadline

|

Ho Chi Minh City - Prolonged for 16 years due to site clearance problems, the Hanoi Highway expansion project has just been set a deadline by Ho Chi Minh City to complete compensation and hand over the remaining land.

Saigon Hot News: Operating time of Long Thanh airport passenger terminal

|

Saigon Hot News on June 17: Operating time of Long Thanh airport passenger terminal; Investigating a group of subjects carrying weapons to people's houses to cause trouble;...

Accelerate construction, determined to put Lien Khuong airport into operation on August 19

|

Lam Dong - Provincial leaders requested ACV and construction units to accelerate the repair project, ensuring Lien Khuong airport resumes operation from August 19.

Phan Thiet airport completes geological drilling, preparing to accelerate construction

|

Lam Dong - Phan Thiet Airport Project - Civil aviation item has completed geological drilling and is preparing to accelerate construction according to schedule.

Dong Nai proposes to expand 2 expressways with a scale of 6 lanes

|

Dong Nai - The city proposes to expand 2 expressways Dau Giay - Long Thanh and Long Thanh - Ben Luc into the pre-feasibility study report dossier.

Identities of 6 young men who died in 2 traffic accidents in Hoa Binh

|

Hoa Binh - Authorities have identified the six young men who died in two consecutive traffic accidents on National Highway 12B and National Highway 6.

Investing 45 billion VND to repair National Highway 12B through Hoa Binh

|

Hoa Binh - National Highway 12B section through Lac Son and Tan Lac districts has just received an investment of 45 billion VND for repair.

5-seat technology car crashes into house wall in HCMC

|

HCMC - A 5-seat technology car driven by a male driver suddenly lost control and crashed into a house wall in Hoc Mon town (HCMC).

Two consecutive traffic accidents killed 6 people in Hoa Binh

|

Hoa Binh - Two consecutive traffic accidents occurred on National Highway 12B and National Highway 6, passing through Tan Lac district, causing 6 deaths.

Multiple accidents on Highway 6, many vehicles damaged

|

Hoa Binh - Authorities are investigating the cause of a series of traffic accidents on National Highway 6 that damaged many vehicles.

How to manage a team of motorbike taxi drivers at a bus station in Hanoi

|

Hanoi - Good management of the motorbike taxi team at bus stations helps passengers feel secure using the service, reducing solicitation and chaos...

Panorama of the 800 billion VND underpass that will open to traffic at the end of December

|

HCMC - The HC1 tunnel branch of the Nguyen Van Linh - Nguyen Huu Tho intersection underpass project has reached 85% progress and is expected to be completed and open to traffic on December 31.

First girder of 8,000 billion VND bridge installed in the West

|

Soc Trang - On the afternoon of December 1, the first girder span of Dai Ngai 2 bridge was installed.

The first steel arch bridge in Quang Ngai is under construction

|

Tra Khuc 3 Bridge with the first steel arch design in Quang Ngai is accelerating construction, ready for technical traffic opening by the end of this year.

In 2025, an important road connecting two districts in Hanoi will open to traffic

|

Hanoi - The extended Le Quang Dao road connecting Nam Tu Liem district with Ha Dong has reached 85% of its volume after 22 months of construction, expected to be completed in May 2025.

Dong Nai is about to adjust the planning of the 8,000 billion VND route

|

Dong Nai - Road DT 770B, invested with more than 8,000 billion VND, has 4-8 lanes, from Dinh Quan district to Long Thanh district, and is about to have its land use planning adjusted.

Binh Duong to carry out 5 transport projects with investment of 3.6 billion USD by 2025

|

In 2025, Binh Duong province will continue to start and accelerate construction of 5 key transport projects with a total investment of about 3.6 billion USD.

Ho Chi Minh City is about to reclaim land from 1,166 Thu Duc households to open a 6-lane road

|

HCMC - Thu Duc City will reclaim land from 1,166 households to build Ring Road 2, and is expected to approve the compensation plan and make payments in December 2024.

8pm News: Hanoi reclaims nearly 100,000m2 of land to expand roads

|

News at 8pm on November 30: Murder due to conflict on social networks; Hanoi reclaims nearly 100,000m2 of land to expand roads;...

Traffic violation fines increased 25 times, people still support

|

The proposal to increase fines for traffic violations by 7-25 times by the Ministry of Public Security is currently receiving much attention from the public.