HCMC Traffic

After 20 years of waiting, National Highway 13 in Ho Chi Minh City will be expanded in 2026

|

After more than 20 years of waiting, Ho Chi Minh City plans to start expanding National Highway 13 in the first quarter of 2026 and complete it in 2028.

The Eastern road of Ho Chi Minh City has been waiting for 9 years but still has not been widened

|

HCMC - The project to expand Luong Dinh Cua Street (Thu Duc City) with an investment capital of 826 billion VND has been implemented for 9 years, but the completion date has not yet been determined.

Current status of roundabout on Pham Van Dong street about to be dismantled

|

HCMC - The roundabout at the intersection of Pham Van Dong and Highway 20 is about to be dismantled because it is no longer suitable for the actual situation.

Metro Line 2 in Ho Chi Minh City faces major obstacles before construction begins

|

HCMC - Metro Line 2 has an investment of nearly 47,900 billion VND, expected to start construction in 2025, but faces many obstacles in capital, consulting, site clearance, and infrastructure relocation.

Revealing the pedestrian bridge connecting Metro Station No. 1, operational at the end of the year

|

HCMC - The bridges spanning Vo Nguyen Giap Avenue - Hanoi Highway connecting to Metro Station No. 1 have been completed for synchronous exploitation when the project is in commercial operation.

Ho Chi Minh City builds 11 compact urban areas along Metro Lines 1, 2 and Ring Road 3

|

Ho Chi Minh City has just issued a plan to develop 11 compact urban areas along Metro lines 1, 2 and Ring Road 3 according to the TOD model.

Metro line 1 will run commercially from December 22, what are the conditions?

|

Ho Chi Minh City aims to put Metro Line 1 (Ben Thanh - Suoi Tien) into commercial operation on December 22. So what is the current progress of Metro Line 1?

Current status of the road is 140% overloaded, the most congested in Ho Chi Minh City

|

Nguyen Tat Thanh Street currently has traffic volume exceeding its capacity by 140%, becoming the most seriously congested street in Ho Chi Minh City.

Ho Chi Minh City invests in 4 projects to help Binh Thanh escape chronic traffic jams

|

HCMC - Xo Viet Nghe Tinh and Dinh Bo Linh streets will be expanded, elevated roads, roads along the Saigon River, and Chu Van An extension will be built to help reduce traffic congestion in Binh Thanh.

Hundred billion bridge to relieve traffic jams in the West area speeds up progress

|

HCMC - After a period of restart, Tan Ky - Tan Quy Bridge (Binh Tan District, HCMC) is speeding up to meet the schedule of opening to traffic by the end of December this year.

The most congested route in Ho Chi Minh City is 140% overloaded

|

Nguyen Tat Thanh Street, connecting Districts 7, 4 and 1, is currently the most seriously congested spot in Ho Chi Minh City, with traffic volume exceeding capacity by 140%.

6-lane road to relieve traffic jam in Thu Duc "froze" for 4 years

|

HCMC - The 6-lane road of Ring Road 2 through Thu Duc City has been "frozen" for more than 4 years. Although the project was extended to 2026 for completion, it has not yet restarted.

Road along Truong Dai canal - Saigon river completed in 2025

|

HCMC - The canal-side road from Truong Dai Bridge to Saigon River, part of the Tham Luong - Ben Cat - Rach Nuoc Len Canal Project, strives to be completed before April 30, 2025.

Location of North-South high-speed railway station in Ho Chi Minh City

|

HCMC - Thu Thiem Station, covering 17.2 hectares, located in An Phu ward, Thu Duc city, will be the terminus for the North-South high-speed railway.

Ho Chi Minh City is about to expand the highway leading to the West to 8 lanes

|

Ho Chi Minh City plans to spend about VND2,350 billion to expand the 12.6km Ho Chi Minh City - Trung Luong expressway from 6 to 8 lanes.