HCMC Traffic
Ho Chi Minh City will build a coastal road connecting Dong Nai and the West
|
Ho Chi Minh City is researching the construction of a coastal route connecting Dong Nai and the western provinces, shortening travel time and increasing freight transport.
Ho Chi Minh City starts construction of 2 trillion-dong bridges across Saigon River in 2025
|
HCMC – The Thu Thiem 4 pedestrian bridge and bridge across the Saigon River will start construction in 2025, helping to increase connectivity between the Thu Thiem New Urban Area and the surrounding area.
Metro Line 2 project progress after 7 months of infrastructure relocation
|
HCMC - Metro Line 2 project (Ben Thanh - Tham Luong) is speeding up site clearance and infrastructure relocation to prepare for construction to start next year.
Ho Chi Minh City is about to open a 5.8 km long, 40 m wide national highway in the South
|
Ho Chi Minh City is preparing to implement a project to open a new National Highway 50B through Binh Chanh and Nha Be districts, about 5.8 km long and 40 m wide, to strengthen connectivity with the Western provinces.
76km route through Ho Chi Minh City and 3 provinces set opening time
|
The 76km-long Ring Road 3 passes through Ho Chi Minh City, Binh Duong, Long An and Dong Nai. Some sections are expected to open to traffic in 2025 and the entire route will be completed by the end of 2026.
4-level intersection to be built on Pham Van Dong Avenue in Thu Duc
|
HCMC - The Pham Van Dong intersection with Ring Road 2 in Thu Duc City will be designed with 4 floors, including an underpass and three overpasses.
Two iron bridges over 50 years old in the South of Ho Chi Minh City are seriously degraded
|
HCMC - Rach Tom and Rach Doi bridges are two iron bridges in Nha Be district built before 1975 and are deteriorating. The city is currently planning to build new bridges to replace them.
Viewing Ho Chi Minh City Ring Road 3 after more than 1 year of construction
|
HCMC - The Ho Chi Minh City Ring Road 3 project through Hoc Mon district has reached 15% progress after more than 1 year of construction.
Struggling to overcome the traffic jam "matrix" in Binh Thanh to enter Ho Chi Minh City's inner city
|
HCMC - Every morning, people from Thu Duc City, Binh Duong have to squeeze through the traffic jam on Dinh Bo Linh Street (Binh Thanh District) to get to the center of HCMC.
500 billion VND bridge connecting District 7 and Nha Be, open to traffic in December
|
HCMC - Rach Dia Bridge on Le Van Luong Street, connecting Nha Be District with District 7, has completed the connection and is expected to open to traffic in December this year.
Ho Chi Minh City will spend 560 billion VND to open a new 25m wide road in Binh Thanh
|
HCMC - The project to open a new Chu Van An street extending to Dai Liet Si intersection, 200m long and 25m wide, with a total investment of more than 560 billion VND, will help reduce traffic congestion in Binh Thanh district.
Ho Chi Minh City will build 2 elevated roads to relieve traffic jams in Binh Thanh
|
Ho Chi Minh City plans to expand Xo Viet Nghe Tinh and Dinh Bo Linh streets and build an elevated road to solve traffic congestion in Binh Thanh district and the Northeast gateway.
Drivers excited to travel through the 830 billion VND underpass in the South of Ho Chi Minh City
|
HCMC - After 2 days of opening the HC2 Nguyen Van Linh tunnel branch (District 7), drivers are excited because traffic is more convenient and traffic congestion is reduced as before.
3 key highways connecting Ho Chi Minh City are about to be doubled in width
|
The three expressways Ho Chi Minh City - Long Thanh - Dau Giay, Ho Chi Minh City - Trung Luong and Trung Luong - My Thuan will be expanded from 4 to 8-10 lanes, helping to reduce traffic jams and accidents.
Ho Chi Minh City will change the design of the 2km long bridge connecting Thu Duc and District 7
|
Ho Chi Minh City is adjusting the plan to build Thu Thiem 4 bridge connecting Thu Duc and District 7, more than 2km long, after Nha Rong - Khanh Hoi Port built an international passenger ship port.