According to the People's Committee of Binh Duong province, Thoi Hoa ward is the only administrative unit that will be kept intact when reorganizing communes and wards.
The ward has a total area of over 3,793 hectares and 83,221 people. The headquarters of the Ward People's Committee has an area of 240m2 built since 2011 on National Highway 13, Quarter 3A, Thoi Hoa Ward, Ben Cat City, Binh Duong. There is currently 1 headquarters and 8 offices. The mass organization block has 7 offices and 1 meeting room.

The Public Administration Service Center block consists of 2 floors. The second floor has a hall with 200 seats; the first floor is the Public Administration Service Center, which can arrange 15 reception and return of results to people (currently 8 counters).
The internet connection speed is 400 Mbps, expected to increase to 500Mbps. Regarding personnel, there are 5 official personnel, 1 reserve personnel, 4 volunteers. The digitalization and file editing work by June 10 had reached 80%.
The Ward People's Committee has assigned and directed sectors to prepare for the announcement ceremony of the resolution on the establishment of the new Thoi Hoa ward on July 1, 2025.
Ward has many workers
According to records, this is a ward with many large industrial parks such as: My Phuoc 2, My Phuoc 3, My Phuoc 4. The ward has many foreign enterprises investing in building factories and attracting a large number of workers to work. The need to carry out paperwork to register for permanent residence, temporary residence, and job application for workers is very high.

Urgently upgrade technical infrastructure
Binh Duong Provincial Electronic Information Portal said that Thoi Hoa ward needs to be more fully equipped with facilities. At the same time, based on the province's project, urgently select and arrange personnel for the right departments and offices with the right people and job positions to meet work needs.

Thoi Hoa Ward must urgently upgrade technical infrastructure, complete data digitalization, and avoid interruptions in work when put into operation. In particular, it is necessary to pay attention to regulations related to financial work and public assets to ensure timely implementation.