According to information from the Lao Cai Department of Transport, from February 26, to ensure traffic safety during the inspection of the overpass at Km112+026 (Trung Chai commune, Sa Pa town) and Coc Leu bridge, the unit will deploy a temporary traffic organization plan.
Accordingly, the time for organizing traffic in the Trung Chai commune overpass area, Km112+026, National Highway 4D: Stop vehicles to conduct bridge load testing from 12:00 to 16:00 on February 26.
The time to stop vehicles moving across the bridge each time is from 20 minutes to 30 minutes, then open to traffic, until the load testing items are completed.
Time to organize traffic at Coc Leu bridge, Km140+500, National Highway 4D: Stop vehicles to conduct bridge load testing from 22:30 on February 26 to 2:00 on February 27.
The time to stop vehicles moving across the bridge each time is from 20 minutes to 30 minutes, then open to traffic, until the load testing items are completed.
The Traffic Police Department of the Provincial Police, Sa Pa Town Police, and Lao Cai City Police coordinated to ensure traffic order and safety during the time the traffic organization carried out the bridge inspection work.