Hanoi will have 7 more bridges across the Red River

Minh Hạnh |

Hanoi - According to the plan, 7 Red River overpasses will be added, forming the central landscape axis of the capital, bringing the total number of Red River overpasses to 21 bridges.

According to the General Planning orientation of the Capital (adjusted), Hanoi City will build 7 more bridges over the Red River including: Lien Trung, Tam Xa, An Duong, Ngoc Thuy, Cu Khoi, Bat Trang and Khuyen Luong. Along with existing bridges and 4 bridges that have started construction in 2025 (Tran Hung Dao, Tu Lien, Ngoc Hoi, Thuong Cat), the total number of Red River overpasses through the central urban area will be increased to 21 bridges.

A representative of the Hanoi Department of Planning and Architecture said that the capital - the national political and administrative center, and also the locomotive of culture, economy and international integration - is entering a new stage of development, aiming to become a "Cultural City - Civilized - Modern". To realize this goal, Hanoi is implementing many breakthroughs in urban planning and infrastructure development, using a new planning map as a tool to create development momentum.

Accordingly, the planning of the new capital period inherits the strategic orientation from the General Planning in 2011, and is adjusted to suit the current context and overcome existing shortcomings. Key strategies are set out to promote green growth, digital transformation, climate change response and smart urban development.

Hanoi will develop according to a multi-center model, using traffic as a framework infrastructure, prioritizing the beltway system, highways and especially the Red River and Duong River overpasses to strengthen regional connectivity.

According to Mr. Dao Minh Tam - Deputy Director of the Hanoi Department of Planning and Architecture, the biggest breakthrough in the new planning is the location of the Red River as a green axis, a central landscape axis and a development symbol of the capital.
The Red River is not only a landscape axis but also a space for the development of modern services, culture, science and technology and urban architecture.

The space on both sides of the river is divided into three main sections: Central area (from Thang Long bridge to Thanh Tri bridge): Forming a cultural, entertainment, and service space; creating a landscape highlight. Western area (from Thang Long bridge and above): Development of ecological space, theme parks, urban agriculture and eco-tourism. Southern area (from Thanh Tri bridge down): Developing agricultural areas, traditional craft villages, aquaculture combined with trade - services.

A representative of the Department of Planning and Architecture said that the exploitation and development of the Red River space has been planned for a long time, but lacks resources for implementation. This adjustment of the planning is concretized by synchronous works and projects on both sides of the river, in which the strengthening of the bridge system is a key solution to ensure connection and balanced development between the two banks.

Hanoi also prioritizes investment in bridges located on beltways (2.5 and 4) to close the traffic system, reducing the load on the inner city. At the same time, areas on both sides of the river such as Long Bien, Gia Lam, Dong Anh will be planned to become new compact urban areas and service administrative areas of the capital.

Along with developing technical infrastructure, Hanoi focuses on urban beautification, heritage conservation and improving the living environment, towards a "green - clean - beautiful - safe" capital. The capital is changing strongly, making the Red River a central symbol, harmoniously connecting the thousand-year tradition of culture and the stature of a modern global city, said a representative of the Hanoi Department of Planning and Architecture.

Minh Hạnh
RELATED NEWS

Hanoi opens bus route connecting island communes in the middle of the Red River to the city center

|

Hanoi - Bus route No. 20, branch of route 20ATC from Nhon to Minh Chau island commune, will officially be put into operation from October 1, 2025.

Information on the construction of 2 bridges across the Red River on Ring Road 4

|

Hanoi - Hong Ha and Me So bridges across the Red River on Ring Road 4 will be built from now until 2027, helping to connect inter-regional areas, reducing traffic congestion.

Mr. Phan Thien Dinh was elected to hold the position of Chairman of the Hue City People's Committee

|

On the evening of October 17, the Hue City People's Council elected Mr. Phan Thien Dinh - Deputy Secretary of the City Party Committee, to hold the position of Chairman of the Hue City People's Committee.

Explaining why the National Assembly has not amended the Land Law at the 10th Session

|

The reason for not amending the Land Law immediately is the need for full and comprehensive assessments. The comprehensive amendment of the law will be studied in the coming time.

Do not relocate all universities out of Hanoi's inner city

|

The Standing Deputy Secretary of the Hanoi Party Committee said that it is necessary to clearly understand that it is not necessary to relocate all universities out of the inner city, but only relocate student training.

Secretary of the Hanoi Party Committee: "Must be determined to strictly implement the direction of General Secretary To Lam"

|

The Secretary of the Hanoi Party Committee said that the capital will be determined to solve and fundamentally overcome the situation of traffic congestion, air pollution, and pollution of rivers.

The National Assembly considers electing, approving, and dismissing a number of leadership positions

|

The Vice Chairman of the National Assembly's Delegation Affairs Committee informed about personnel issues that will be considered and decided at the 10th Session.

"Lanterns" move a house built by mistake on someone else's land back to the correct location

|

HCMC - In Chanh Hiep ward, the "genie" is moving a house that was mistakenly built on someone else's land back to the correct land location.

Hanoi opens bus route connecting island communes in the middle of the Red River to the city center

Anh Tuấn |

Hanoi - Bus route No. 20, branch of route 20ATC from Nhon to Minh Chau island commune, will officially be put into operation from October 1, 2025.

Loạt cầu qua sông Hồng khởi công năm 2025, sẽ hoàn thành 2-3 năm tới

SÓNG HỮU |

Loạt cầu qua sông Hồng hoàn thành trong giai đoạn 2027-2028 sẽ làm thay đổi diện mạo giao thông Hà Nội, tạo ra sự phát triển đồng đều giữa hai bờ Nam - Bắc.

Information on the construction of 2 bridges across the Red River on Ring Road 4

Sóng Hữu |

Hanoi - Hong Ha and Me So bridges across the Red River on Ring Road 4 will be built from now until 2027, helping to connect inter-regional areas, reducing traffic congestion.