This type of boarding house must stop operating after March 30

|

After March 30, 2025, boarding houses that do not complete the implementation of fire prevention and fighting safety (PCCC) solutions will have to stop operating.

According to Directive 19/CT-TTg of the Prime Minister on strengthening fire prevention and fighting for multi-storey houses, multi-apartment houses, individual houses combined with production and business: After March 30, 2025, boarding houses that do not complete the implementation of fire safety solutions will have to stop operations.

Fire safety conditions for boarding houses are stipulated in Article 5 of Decree 136/2020/ND-CP as follows:

* For boarding houses over 5 floors

Boarding houses with 5 floors or more or with a total volume of accommodation blocks of 2,500m3 or more must ensure the following fire prevention and fighting safety conditions:

- Having regulations, prohibition signs, signs, diagrams or signs guiding fire prevention, fire fighting, and escape in accordance with regulations and standards on fire prevention and fighting or according to regulations of the Ministry of Public Security.

- Have grassroots fire prevention and fighting forces, specialized according to the type of facility, trained in fire prevention and fighting and organize fire fighting readiness to meet on-site fire fighting requirements.

- Have a fire fighting plan approved by competent authorities.

- Electrical systems, lightning protection, static power, electrical equipment, generators, heat generators, the use of fire sources and heat sources must ensure fire safety and fighting in accordance with regulations and standards on fire prevention and fighting or according to regulations of the Ministry of Public Security.

- There is a transportation system, water supply, communication for fire fighting, fire alarm, fire prevention, fire prevention, smoke prevention, escape, other fire prevention and fighting vehicles, and rescue vehicles to ensure quantity and quality.

- Having a Certificate of design approval and a design approval document (if any) and a document approving the acceptance results for fire prevention and fighting from the Fire Prevention and Fighting Police Agency.

* For boarding houses under 5 floors

Boarding houses with less than 5 floors and a total volume of accommodation blocks under 2,500m3 must ensure the following fire prevention and fighting safety conditions:

- Having regulations, prohibition signs, signs, diagrams or signs guiding fire prevention, fire fighting, and escape in accordance with regulations and standards on fire prevention and fighting or according to regulations of the Ministry of Public Security.

- Have a fire fighting plan approved by competent authorities.

- Electrical systems, lightning protection, static power, electrical equipment, generators, heat generators, the use of fire sources and heat sources must ensure fire safety and fighting in accordance with regulations and standards on fire prevention and fighting or according to regulations of the Ministry of Public Security.

- Design approval certificate and design approval document (if any) and document approving acceptance results for fire prevention and fighting.

- Having a traffic system, water supply, communication for fire fighting, fire alarm, fire prevention, fire prevention, fire escape, other fire prevention and fighting means, rescue means that ensure quantity and quality in accordance with standards and technical regulations on fire prevention and fighting or according to regulations of the Ministry of Public Security.

TIN LIÊN QUAN

Accident between blue-plate car and tractor, 1 person died

|

Dak Lak - After a traffic accident between a blue-plate car and a tractor, 2 people were injured and died.

School speaks out about the 22 million VND tuition fee for National Defense Education

|

On March 27, Ho Chi Minh City University of Law officially announced the tuition fee for the National Defense Education section for students of course 49.

Dak Nong requests to review the Department of Construction on personnel work

|

Dak Nong - The Provincial People's Committee requested the Department of Construction to review the collectives and individuals involved and arrange the number of department heads in short supply in accordance with the direction of the Provincial Party Committee.

Overview of the process of rescuing a kidnapped child in Bac Ninh

|

Bac Ninh - After more than 4 hours of fighting, using professional measures, the Bac Ninh Provincial Police force successfully rescued the child kidnapped from the stone thieves.

Officially opening Quang Da bridge connecting Quang Nam - Da Nang

|

The bridge connecting Quang Nam - Da Nang officially opened to traffic, shortening travel time and promoting trade between the two localities.

Nha Trang people are surprised by the drug processing factory

|

Khanh Hoa - Many people in Nha Trang City were extremely surprised to learn that there was a huge drug processing factory located on the edge of a cemetery.

Son of the late architect Ta Xuan Van cried because of Ham Thang building

|

After more than 30 years, the Shark Ham building has become a memory of the family of the late architect Ta Xuan Van, who designed this project.

Many boarding houses are still negligent and do not ensure fire prevention and fighting conditions

CAO THƠM - HOÀNG XUYẾN |

In Hanoi, many boarding houses are still not eligible for fire prevention and fighting (PCCC).

Nữ sinh tố bị chủ nhà trọ ở Cầu Giấy đánh vì đòi tiền cọc

Anh Tuấn |

Lực lượng chức năng đang xác minh thông tin liên quan đến việc một nữ sinh bị đánh tại phường Mai Dịch (quận Cầu Giấy, Hà Nội).

Hai Phong directs to strengthen management of workers' dormitories

Mai Dung |

The People's Committee of Hai Phong City has just issued instructions to strengthen the management of boarding houses and rooms for workers to rent to live in the city.