Traffic

Sa Pa "transforms" after 100 days and nights of traffic embellishment campaign

|

Lao Cai - From muddy dirt paths in villages, after the "100 Days - Nights" campaign, dozens of roads in Sa Pa ward have been concreted.

Asphalt carpet section continuously causing accidents Lao Dong Newspaper once reflected

|

Ha Tinh - Immediately after Lao Dong Newspaper reflected on Nguyen Hoanh Tu street section, many potholes continuously caused accidents, functional units asphalted the road surface.

Bridges connecting Thu Thiem with the center of Ho Chi Minh City

|

Ho Chi Minh City - In addition to Thu Thiem 1 bridge, Ba Son has been put into use, the remaining 3 bridges connecting Thu Thiem New Urban Area with the center of Ho Chi Minh City are still being implemented.

Accident with truck, husband and wife in Gia Lai die

|

Gia Lai - An accident with a truck carrying goods caused a tragic death of a couple on National Highway 19.

Stopping renting, sidewalks in the center of Ho Chi Minh City are again encroached upon

|

Ho Chi Minh City - Sidewalk rental stopped not long ago, many central roads are again occupied, sidewalks are messy, pedestrians have difficulty moving.

Starting construction of nearly 6,000 billion VND expressway running through Bac Kan

|

Bac Kan - On March 15, the Cho Moi - Bac Kan expressway project, nearly 29km long with a total investment of VND5,750 billion, was officially started.

Scene of a container truck hitting a median strip, causing prolonged traffic jams

|

Binh Duong - The container truck crashed into the median strip, causing other cars to crash into each other, on March 15 on My Phuoc Tan Van Street, Thuan An City.

Opening a 4-8 lane road connecting 5 districts and cities of Dong Nai province

|

Dong Nai - DT 770B road passing through 5 districts and cities is more than 42km long, with 4-8 lanes expected to approve the feasibility study report in the third quarter of 2025.

HCMC builds 2 canals along the canal, 30km long, connecting 7 districts

|

HCMC - 2 routes along the Tham Luong - Ben Cat canal, 30km long, passing through 7 districts, will open to traffic in some sections on April 30, completing the entire route by the end of 2025.

Striving to complete the 960 billion VND Hai Phong traffic project soon

|

The road project connecting the coastal road to Van Bun intersection (Do Son district, Hai Phong) is being accelerated, striving to finish in May 2025.

People live with danger waiting for a road opening project in Hanoi

|

Hanoi - People have been crowded with heavy trucks on Provincial Road 70 for many years, while the project was opened in 2020 but has not been completed yet.

Billion-dollar road in mountainous district of Thai Nguyen completed

|

Thai Nguyen - After more than 1 year of implementation, the project to expand the Tien Hoi - Hoang Nong inter-commune road in the mountainous district of Dai Tu has been completed.

Ho Chi Minh City residents hope for reasonable motorbike emission inspection fees

|

HCMC - The acceleration of the application of emission standards for motorbikes in Hanoi and HCMC is attracting the attention of people, with the expectation that the fee will be reasonable.

Road worth over VND50 billion/km in Tuyen Quang after 3 years of construction

|

Tuyen Quang - The route connecting Tuyen Quang - Phu Tho Expressway with National Highway.2D is expected to promote economic and social development, synchronizing traffic infrastructure.

Hanoi pilots new traffic in Ba Dinh

|

Hanoi The Department of Construction will pilot traffic organization adjustment on some routes in Ba Dinh District.

HCMC builds a road along the Saigon River more than 30m wide through the center

|

Ho Chi Minh City will build a 78km long Saigon River road, with a scale of 4-8 lanes, connecting from Cu Chi to Can Gio. In the immediate future, invest in the section from Ba Son Bridge to Saigon Bridge.

The billion-dollar intersection in the East of Ho Chi Minh City is expected to be completed in 2026

|

HCMC - After 9 years of construction, the My Thuy intersection project - a project expected to "rescue" traffic congestion in the East of HCMC continues to start construction in phase 3.

Electric vehicles break out, old car calling platform gradually loses its position

|

For the past half year, Ms. Hoang Lan (name changed) in Tay Mo ward, Nam Tu Liem district, Hanoi and her whole family have changed the habit of calling a technology car every time they move. If before, the family chose Be or Grab, now they have switched to calling SM Green electric cars.

Mother and child died after colliding with a truck

|

Ha Tinh - A motorbike was traveling on the road when it collided with a truck, causing the tragic death of a mother and child.

Tightening 4-wheeled motor vehicles for passenger vehicles in Khanh Hoa

|

Khanh Hoa - The locality will organize the placement of signs of maximum operating speed, signs prohibiting or restricting the operation of 4-wheeled vehicles with engines.