Traffic
Hundreds of workers worked day and night to overcome landslides on the North-South railway after storms
|
Dak Lak - Storm No. 13 caused damage when the North-South railway section through Xuan Lanh commune was eroded, completely paralyzing the train operations in this area.
Close-up of the road in Can Tho devastated by high tides
|
Can Tho - Many sections of the road are cracked and peeling after high tides, causing danger to people when traveling.
Opening more than 5km of Dong Nai riverside road through a century-old villa
|
Dong Nai - The Dong Nai riverside road project in Tran Bien ward running from Hoa An bridge to the border of Vinh Cuu district (old) will be completed in 2025.
Scene of collision between truck and pedestrian in Ho Chi Minh City, killing 1 person
|
HCMC - On the morning of November 9, An Hoi Tay Ward Police are investigating and clarifying the traffic collision between a pedestrian and a truck that caused a pedestrian to die on the spot.
Searching for witnesses to the accident that killed one person
|
The Investigation Police Agency of Ha Tinh Police is looking for witnesses to the accident that killed one person on the Ho Chi Minh Highway through Phuc Trach Commune on the afternoon of November 3.
The 1,500 billion VND project to expand the gateway to Ho Chi Minh City is "stuck" because of 8 houses
|
HCMC - The 1,500 billion VND National Highway 50 expansion project has been stalled because 8 houses have not been cleared, causing the parallel road to be interrupted even though it is 75% complete.
Concerns over compensation level for Hanoi central road expansion project
|
Hanoi - Believing that the compensation level is not realistic, many households have not yet agreed to hand over the land to carry out the project of expanding lane 381 Nguyen Khang.
Consulting on motorbike emission testing, people wait for early implementation
|
The Ministry of Transport continues to seek comments on the draft Decision of the Prime Minister on the roadmap for applying motorcycle emission standards.
There was a license plate that exceeded 7 billion in the auction on November 19
|
License plate auction: On the morning of November 19, Vietnam Joint Stock Auction Company organized an auction of 5,000 license plates in 3 time frames.
Struggling to get through a potholed road in the East of Ho Chi Minh City
|
HCMC - Phuoc Thien Street (Thu Duc City) is degraded, dirty, and full of potholes, making it difficult for vehicles to move around.
Hanoi focuses on implementing project to expand roads to 8-10 lanes
|
Hanoi - In November 2024, Thanh Tri district will hand over 100% of the land to construct the expansion of National Highway 1A, Van Dien - Ngoc Hoi section.
Faded or damaged signs may result in temporary suspension of road toll collection
|
From January 1, 2025, signs on national highways and expressways that are blurred or damaged may have to temporarily stop collecting road tolls.
Traffic jam nearly 2km long due to multiple accidents in Binh Duong
|
Binh Duong - On November 19, Di An City Police are investigating a series of accidents involving 3 vehicles that caused prolonged traffic congestion.
Many drivers were encouraged by Ho Chi Minh City Traffic Police to install surveillance cameras
|
Many trucks traveling on National Highway 22 were encouraged by the Northwest Traffic Police Station under the Ho Chi Minh City Traffic Police Department to install surveillance cameras to reduce accidents.
Colliding with a truck parked on Highway 1, 1 person in Binh Dinh died on the spot
|
Binh Dinh - While driving a motorbike on National Highway 1, through Tuy Phuoc district, a man crashed into the back of a truck parked on the side of the road and died on the spot.
Identifying challenges as Hanoi implements unprecedented low emission zone
|
Hanoi is finalizing a draft resolution on low-emission zones in the city. There are many challenges as this is unprecedented.
Growing vegetables on a hundred billion VND road in Hanoi took 4 years to complete
|
Hanoi - The unfinished 6-lane road project in Nam Tu Liem for many years has become a place for people to grow vegetables.
5 BOT projects at Ho Chi Minh City's gateway are expected to collect tolls for 18 to 25 years
|
HCMC - 5 BOT projects to upgrade National Highways 1, 13, 22, the North-South axis road, and Binh Tien bridge and road are expected to recover capital within 18-25 years, with flexible toll collection by trip or km.
Cases where toll stations will be removed from 1.1.2025
|
According to the new Circular of the Ministry of Transport, many cases will be released from road toll stations from January 1, 2025.
Ho Chi Minh City is about to establish 2 more project management boards and land fund centers
|
The establishment of two additional project management boards and a land fund development center is expected to improve the efficiency of construction investment and land management in Ho Chi Minh City.