A series of exercise equipment in Hue is not properly exploited, causing waste

PHÚC ĐẠT - NGUYỄN LUÂN |

HUE - Without use, without preservation, a series of sports equipment in Hue are being "abandoned", degraded, and wasted.

O TP Hue, nhu cau tap luyen the duc, the thao cua nguoi dan la rat lon. Vi the, viec dau tu xay dung co so ha tang, lap dat dung cu phuc vu ren luyen suc khoe la viec can thiet. Tuy nhien, thuc te trien khai van chua thuc su hop li o nhieu noi, gay ra su lang phi khong nho.
In Hue City, the need for physical exercise and sports of the people is very large. Therefore, investing in building infrastructure and installing health training equipment is necessary. However, the implementation is still not really reasonable in many places, causing a lot of waste.
Ghi nhan cua PV Bao Lao Dong tai xa Thuy Thanh, thi xa Huong Thuy cho thay, mot khu dat rong nam khuat sau buc binh phong cua nha tho o thon Lang Xa Con da duoc dau tu bai ban thanh san tap the duc cong dong, voi khoang 10 thiet bi the thao gom: dung cu lac eo, tap tay, tap chan chan, vai…
According to the reporter of Lao Dong Newspaper in Thanh Thuy Ward (Thuy Thanh Commune, the old Huong Thuy Town), a large area of land hidden behind the wall of a church in Lang Xa Con Village has been systematically invested in to become a community exercise ground, with about 10 sports equipment including: waist shaking tools, hand-works, leg training, shoulders...
 Hau het cac thiet bi deu rat moi. San nen duoc lat da sach dep, nhung toan bo khu vuc gan nhu bi “nuot chung” boi co dai um tum, ke ca loi ra vao.
Most of the equipment is very new. The ground is paved with beautiful clean stone, but the entire area is almost "swallowed" by overgrown weeds, including the entrance.
 Theo nguoi dan, co dai moc len nhieu thang nay, do do ai cung so ran, cay coi chan duong nen du rat muon tap luyen cung danh “bo cuoc”.
According to the people, weeds have been growing for many months, so everyone is afraid of snakehead fish and trees blocking the road, so even if they really want to practice, they have to " give up".
“Sang som, ho khong dam den tap, ban dem thi khong co den, cay co lai ram rap, so ran. Toi la nguoi lon tuoi, cung rat muon di tap the duc nhung cho tap phai sach se, sang sua” - ba Truong Thi Thu, mot nguoi dan chia se.
"Early in the morning, they don't dare to come to practice, at night there are no lights, the plants are overgrown with forest and are afraid of snake. I am an older person, I also want to go exercise, but the place to practice must be clean and bright" - Ms. Truong Thi Thu, a resident shared.
Tro treu hon, vao buoi sang la thoi diem ly tuong de van dong cung khong mot bong nguoi xuat hien. Mot san tap hien dai tro thanh vung dat hoang, lanh leo, phoi mua nang vo ich.
Even more ironically, in the morning is the ideal time to exercise, even a single person does not appear. A modern training ground has become a deserted, cold land, exposed to the useless rain and sun.
Tinh trang tuong tu xay ra doc tuyen duong To Huu. Hang loat thiet bi the duc ngoai troi da duoc lap dat nhung lai nam ngay tai khu vuc thuong xuyen thi cong cong trinh, xa khu dan cu. Ket qua la khong ai su dung.
Similar situations occurred along To Huu Street. A series of outdoor exercise equipment has been installed but is located right in the area where construction is often carried out, away from residential areas. As a result, no one used it.
Theo thoi gian, cac thiet bi nay ri set, hu hong, tro thanh “do trang tri” khong ai doai hoai.
Over time, these devices have leaked and damaged, becoming "decoration items" that no one cares about.
Tai khu vuc du an Trung tam Van hoa – The thao Thuan An, loat dung cu the thao cung chung so phan. Du an dung thi cong tu lau, co so ha tang chua hoan thien nhung thiet bi tap luyen da lap dat xong. Hau qua la dung cu van hang ngay phoi mua dam suong, hoen gi, hu hong nang khi chua mot lan phuc vu nguoi dan.
In the Thuan An Cultural - Sports Center project area, a series of sports equipment also suffered the same fate. The project has been suspended for a long time, the infrastructure is not yet complete but the training equipment has been installed. As a result, the tools are still exposed to the rain and thunderstorms every day, rusted and damaged when they have not served the people once.
Trao doi voi PV bao Lao Dong, ong Duong Anh Tuan - Chu tich UBND xa Thuy Thanh (thi xa Huong Thuy) cho biet, khu vuc tap luyen o thon Lang Xa Con, xa Thuy Thanh dang duoc Ban Quan ly du an Dau tu xay dung va Phat trien do thi Hue dau tu thuc hien, chua hoan thien va chua ban giao cho dia phuong (hinh anh nguoi dan tiec nuoi khi san tap va cac dung cu ngap trong cay co, lang phi).
Talking to Lao Dong newspaper reporters, the leader of the old Thuy Thanh commune (now Thanh Thuy ward) said that the training area in Lang Xa Con village, Thuy Thanh commune is being invested by the Hue Urban Development and Investment Project Management Board, has not been completed and has not been handed over to the locality (images of people feeling regretful when the practice yard and tools are flooded in the grass, waste).
PHÚC ĐẠT - NGUYỄN LUÂN
TIN LIÊN QUAN

Market in Quang Tri is abandoned after being built

|

Quang Tri - Hai Son market in Hai Lang district has been invested with 4 billion VND, completed for 2 years but has not yet opened for operation, and is now starting to deteriorate.

Commune-level civil servants who quit their vocational training and finish their studies must be able to do so as not to waste the budget

|

Commune-level civil servants under the age of 45 who wish to quit their jobs will enjoy the regimes according to the decree effective from June 16, 2025.

A series of projects are opened to the public, avoiding waste

|

Many bridge and road projects that have been "suspended" for many years in Ho Chi Minh City have been removed, completed and put into operation, contributing to reducing traffic congestion and avoiding wasting investment resources.

Cave of clouds floating like a fairyland on the Dong Van stone plateau

|

Tuyen Quang - Hang May Gate in Dong Van has a giant lotus bud shape, leading to a world of stone jars hidden in the magical mist of clouds.

More than 3 points/subject for admission to many public high schools in Hanoi

|

Many public high schools in Hanoi have very low benchmark scores, students only need to achieve an average of 3 points/subject that they have been admitted to.

GDP in the first 6 months of the year increased by 7.52%, highest in the period 2011-2025

|

GDP in the first 6 months of 2025 increased by 7.52% over the same period last year, the highest level in the first six months of the year in the period 2011-2025.

The career of Vietnamese actors owning National Treasures before retiring

|

Vietnamese actors own National Treasures with a huge film fortune.

Continue to reorganize and organize mass associations assigned by the Party and the State

|

The Party Committee of the Fatherland Front and Central organizations lead and direct the continued arrangement and reorganization of mass associations assigned by the Party and the State.

Market in Quang Tri is abandoned after being built

HƯNG THƠ |

Quang Tri - Hai Son market in Hai Lang district has been invested with 4 billion VND, completed for 2 years but has not yet opened for operation, and is now starting to deteriorate.

Commune-level civil servants who quit their vocational training and finish their studies must be able to do so as not to waste the budget

Lê Thanh phong |

Commune-level civil servants under the age of 45 who wish to quit their jobs will enjoy the regimes according to the decree effective from June 16, 2025.

A series of projects are opened to the public, avoiding waste

MINH QUÂN |

Many bridge and road projects that have been "suspended" for many years in Ho Chi Minh City have been removed, completed and put into operation, contributing to reducing traffic congestion and avoiding wasting investment resources.