HCMC Traffic
Drivers excited to travel through the 830 billion VND underpass in the South of Ho Chi Minh City
|
HCMC - After 2 days of opening the HC2 Nguyen Van Linh tunnel branch (District 7), drivers are excited because traffic is more convenient and traffic congestion is reduced as before.
3 key highways connecting Ho Chi Minh City are about to be doubled in width
|
The three expressways Ho Chi Minh City - Long Thanh - Dau Giay, Ho Chi Minh City - Trung Luong and Trung Luong - My Thuan will be expanded from 4 to 8-10 lanes, helping to reduce traffic jams and accidents.
Ho Chi Minh City will change the design of the 2km long bridge connecting Thu Duc and District 7
|
Ho Chi Minh City is adjusting the plan to build Thu Thiem 4 bridge connecting Thu Duc and District 7, more than 2km long, after Nha Rong - Khanh Hoi Port built an international passenger ship port.
Metro Line 1 in Ho Chi Minh City is running a trial run with 47 different scenarios
|
HCMC - Metro Line 1 (Ben Thanh - Suoi Tien) has begun its trial operation phase with 47 different scenarios, preparing for the upcoming commercial operation.
Image of Nam Ly bridge preparing to open to traffic on the morning of September 30
|
HCMC - After 8 years of construction, Nam Ly Bridge on Do Xuan Hop Street (HCMC) has been completed and is ready to open to traffic tomorrow (September 30).
Revealing the 13km long elevated road in the East of Ho Chi Minh City
|
HCMC – The 13km-long, 4-lane elevated road section of Ring Road 3, running through Thu Duc City, is gradually taking shape after more than a year of construction.
Underpass branch at the southern gateway of Ho Chi Minh City before opening to traffic
|
HCMC - The HC2 underpass branch (from District 7 to Binh Chanh District) at the Nguyen Van Linh - Nguyen Huu Tho intersection will open to traffic on September 30.
Ho Chi Minh City - Long Thanh Expressway is about to escape traffic jams
|
Ho Chi Minh City spends nearly VND1,000 billion to expand the Ho Chi Minh City - Long Thanh - Dau Giay expressway from 4 to 8 lanes, with plans to start construction in 2025 and complete in 2026.
Completed removal of median strip on major road in Ho Chi Minh City
|
HCMC - After many months of construction, the median strip in the two-wheeled lane on Vo Van Kiet Street (from Km4 + 900 to Km12 + 900) has been removed.
3 trillion-dollar intersections connecting Ho Chi Minh City and Ben Luc - Long Thanh expressway
|
Ho Chi Minh City will invest thousands of billions of VND to build three intersections connecting to the Ben Luc - Long Thanh expressway, including the intersections of Rung Sac Road, National Highway 50 and Nguyen Van Tao Road.