Bach Dang Construction Corporation announces recruitment

Công ty CP Xây dựng 203 |

203 Construction Joint Stock Company, Bach Dang Construction Corporation announced the recruitment of bridge and road engineers and civil engineers.

THER RISE THER WITH THAT WORK

THER RISE THAT USE 203

No. 24 Tan Vien, Thuong Ly Ward, Hong Bang District, Hai Phong City

THONG THEN THER RISE

Recruitment position:

- Bridge and road engineer: 03 people

- Civil engineer: 03 people

Work location: Long Bien - Hanoi project and other projects of the company.

Requirements: Graduated from university with a major in Bridge and Road Engineering, Civil Construction (or related majors); Have 1 year or more experience in the field of recruitment; Use design software such as AutoCAD, Revit, SAP2000 or other technical software proficiently.

Priority: Having a practice certificate as a Bridge and Road Engineer, civil construction engineer.

Job description:

1- Bridge and road engineer:

- Inspect and supervise the construction of bridges and roads.

- Develop projects for bridges, roads, and traffic infrastructure.

- Calculating the structure of bridges, roads, drainage systems, and traffic safety systems.

- Organize the construction of the bridge and road, ensuring the progress and quality of the project.

- Check and assess the status of the bridge and road project after completion.

- Propose measures to renovate and upgrade bridge and road works when necessary.

- Ensure acceptance and labor safety requirements.

2- Civil engineer:

- Organize supervision of construction of civil works such as houses and public works.

- Calculating the structure of civil works, electromechanical systems, water supply and drainage, fire prevention and fighting.

- Check drawings, calculate structures and construction materials.

- Organize the construction of civil works, ensuring compliance with technical standards and construction procedures.

- Ensure progress and quality of the project throughout the construction process.

- Carry out work related to testing and checking construction materials at the construction site.

- Check and evaluate the quality of the project after completion.

General rights:

- Attractive salary from 15,000,000 - 20,000,000 VND/month depending on ability.

- Opportunities for promotion in the company.

- Receive professional training and improve skills.

- Full insurance regimes according to the provisions of law.

- Professional and friendly working environment.

Address for submitting documents: Company's TCHC Department - No. 24 Tan Vien, Thuong Ly Ward, Hong Bang District, Hai Phong City

Contact: Mr. Thai - TCHC City Phone: 0904 00 77 56.

Công ty CP Xây dựng 203
TIN LIÊN QUAN

Vietnamese leaders send congratulatory letters Laos and Cambodia

|

Vietnamese leaders send congratulatory letters on the occasion of Laos's traditional Tet Bun Pi and Traditional New Year Chol Chhnam Thmey of Cambodia.

The alternative roadmap when Le Duan Street in Ho Chi Minh City is limited from tonight

|

HCMC - Le Duan Street (from Pham Ngoc Thach to Nam Ky Khoi Nghia) will be restricted to traffic from 9:00 p.m. on April 14.

The Government discusses arrangement of cadres and civil servants when merging the administrative unit

|

The meeting focused on discussing the arrangement of cadres, civil servants and public employees; Handling properties and facilities in arranging and merging administrative units.

The artery more than 21km is being expanded in Hanoi

|

Hanoi - The project of expanding Highway 6 is being constructed in Chuong My district, while the section through Ha Dong is being implemented ground clearance.

Vinh City Nan Solving the problem of 61 teachers, contract staff

|

Nghe An - 61 teachers, long -term contract staff are in a precarious situation, when Vinh City has difficulty between legal regulations and historical reality.

Ho Chi Minh City merged 3 Departments of Construction

|

Ho Chi Minh City - Consolidation of the Department of Transport and Public Protection Department and the Department of Construction of Ho Chi Minh City Construction Department, not re -establishing the Department of Planning and Architecture of Ho Chi Minh City as previously proposed.

Arranging more than 11,500 billion dong to make 2 highways through Binh Phuoc

|

Binh Phuoc - two highways passing Binh Phuoc province will be arranged more than 11,500 billion VND to soon deploy construction.

Explaining the cause of forest fires in the first time in 2025

|

Since the beginning of 2025, there have been special forest fires in the Northern provinces, causing significant damage.