Commune police rescue 6 surveyors of Ka Pet lake project trapped in the forest due to floodwaters

Duy Tuấn |

Lam Dong - Floodwaters caused 6 surveyors of the Ka Pet lake project to be isolated in the forest for an entire night before being rescued by the police.

On the morning of December 4, Ham Thanh Commune Police (Lam Dong Province) deployed forces into the forest to rescue 6 surveyors on duty in the Ka Pet Lake project area.

This group was stuck due to sudden floodwaters, causing the river through the project area to rise and flow rapidly.

Cong an xa Ham Thanh giai cuu cac nhan vien do dac bi co lap giua rung. Anh: Duy Tuan
Ham Thanh Commune Police rescue surveyors isolated in the forest. Photo: Duy Tuan

Previously, on December 3, 6 people went into the forest area of Ham Thanh commune to measure and serve the investment procedures of the Ka Pet lake project.

Du day de boi qua dong nuoc lu. Anh: Duy Tuan
Rope to swim through floodwaters. Photo: Duy Tuan
Rescue surveyors trapped in the forest due to rising floodwaters. Clip: Duy Tuan

By the afternoon of the same day, heavy rain combined with water from upstream caused the river to rise rapidly, blocking the road out of the forest.The group stayed overnight in isolation.

On the morning of December 4, Ham Thanh Commune Police brought a life jacket to the scene. The authorities tied ropes to trees on both banks, assisting each person in swinging a rope and swimming across the river in strong water conditions. All were brought out safely.

Vi tri cac nhan vien bi mac ket nam giua rung. Anh: Duy Tuan
The location of the employees was stuck in the middle of the forest. Photo: Duy Tuan

Also in Ham Thanh commune, on the evening of December 3, a man riding a motorbike fell and was swept away by the water and went missing.

The authorities are searching through the night. On the morning of December 4, the victim's body was found.

Duy Tuấn
RELATED NEWS

Floodwaters poured in, National Highway 1 through Lam Dong turned into a river

|

Lam Dong - After heavy rain, National Highway 1 seems to have turned into a river due to the noisy floodwaters flowing into Hong Son commune.

Soldiers of Military Region 5 wade in floodwaters, spending the night rescuing people

|

Continuously suffering from fierce storms and floods, people in the Central region always see the ghosts of the soldiers of Military Region 5 present in the most dangerous place, wade in floodwaters, spend the night rescuing people and staying until the end to help rebuild their lives after natural disasters.

VinFuture 2025: soft materials and physical intelligence pave the way for the safe robot era

|

The seminar "Robots and Smart Automation" within the framework of VinFuture Week 2025 was held on December 4.

Unexpected risks of holding many "winter- sleeping" accounts

|

The fee is from 5,000 VND - 22,000 VND/month if the account is only "opened".

VinFuture main prize is the project with a large-scale influence on the global population

|

On the evening of December 5, the VinFuture 2025 Award Ceremony - the focal event of VinFuture Science and Technology Week 2025, will take place.

Ho Chi Minh City plans to build Can Gio Bridge worth over VND13,200 billion, starting construction in 2027

|

HCMC - The Can Gio bridge project has a total length of 6.3 km, a total of more than 13,200 billion VND under the BT contract, expected to start construction in 2027, replacing Binh Khanh ferry.

Ambulances transferred to the hospital hit a passenger bus, the patient died on the way to Ho Chi Minh City

|

Lam Dong - An ambulance took a patient to Ho Chi Minh City when he had an accident on the highway. The patient was transferred to another hospital by another vehicle but died.

Khanh Hoa Trade Union represents lawsuit to collect unpaid wages and insurance for workers

|

Khanh Hoa - After a long period of being owed wages and social insurance by enterprises, many employees of Mai Linh Nha Trang Company Limited have authorized the Trade Union to file a lawsuit.

Floodwaters poured in, National Highway 1 through Lam Dong turned into a river

Duy Tuấn |

Lam Dong - After heavy rain, National Highway 1 seems to have turned into a river due to the noisy floodwaters flowing into Hong Son commune.

Soldiers of Military Region 5 wade in floodwaters, spending the night rescuing people

An Thượng |

Continuously suffering from fierce storms and floods, people in the Central region always see the ghosts of the soldiers of Military Region 5 present in the most dangerous place, wade in floodwaters, spend the night rescuing people and staying until the end to help rebuild their lives after natural disasters.

Hồ Ka Pét "lụt" tiến độ, Bình Thuận vẫn muốn có thêm hồ thủy lợi 10.000 tỉ đồng

Nhóm PV |

Ở thời điểm hiện tại, dự án hồ Ka Pét đang trong giai đoạn khoan thăm dò địa chất. Đây mới chỉ là những bước đầu tiên và cơ bản nhất trong quá trình triển khai dự án - dù theo Nghị quyết số 101/2023/QH15 ngày 24.6.2023 của Quốc hội, thời gian thực hiện là từ năm 2019 đến 2025.