Ha Nam warns of floods on Day River exceeding level III

Thu Giang |

Authorities of Ha Nam province have just issued a warning that the flood on the Day River is exceeding alert level III.

According to information from the Standing Office of the Steering Committee for Natural Disaster Prevention and Control and Search and Rescue (PCTT&TKCN) of Ha Nam province, the water level on the Day River in Phu Ly measured at 2:00 p.m. on September 23, 2024 was 4.12m, 0.12m above alert level III (based on Decision No. 05/2020/QD-TTg dated October 31, 2020 of the Prime Minister, the alert level III on the Day River at Phu Ly hydrological station is 4.00m).

The Steering Committee for Natural Disaster Prevention and Control of Ha Nam province informed that the impact of floods on the Day River caused flooding in low-lying areas, affecting waterway traffic activities, aquaculture projects on the river, and agricultural production along the Day River.

a
Floods on the Day River have caused flooding in low-lying areas in Ha Nam. Photo: VNA

The Standing Office of the Steering Committee for Disaster Prevention and Control of Ha Nam province issued a warning message III on the Day River. The Steering Committee for Disaster Prevention and Control of Kim Bang, Thanh Liem districts and Phu Ly city are requested to implement the following contents:

Strengthen patrolling and guarding to protect dikes in accordance with the guidance in Circular No. 01/2009 of the Ministry of Agriculture and Rural Development guiding patrolling and guarding to protect dikes during flood season. Strictly implement the directive documents of the Provincial People's Committee.

Organize inspection, review and be ready to deploy dike protection plans, protect key dike points and sluices under the dike.

Proactively implement plans to evacuate people living in riverbank areas, ensuring safety of people and property.

Organize a serious on-duty team, closely monitor the developments of rain and floods to be ready to handle situations from the first hour, promptly inform and report to the Standing Office of the Steering Committee for Disaster Prevention and Control and Search and Rescue of Ha Nam province.

Thu Giang
RELATED NEWS

Tim Cook will resign as Apple CEO

|

Apple announced on April 20 that Tim Cook will resign as CEO in September and hand over the highest position to veteran personnel John Ternus.

Ho Chi Minh City is about to build 3 large projects to help Can Gio escape the scene of crossing rivers and ferries

|

Ho Chi Minh City builds sea-crossing roads, expressway intersections, and expands Rung Sac road, helping to break the isolation and directly connect Can Gio with the city center and surrounding areas.

Enrollment 2026: List of schools considering exam scores for competency and thinking assessment

|

Many universities have begun to announce their expected enrollment plans for 2026. In which, many schools use competency and thinking assessment exam scores for admission consideration.

Iran reveals nuclear orientation amid international pressure over enriched uranium

|

Iran affirms nuclear development within the framework of the Treaty on the Non-Proliferation of Nuclear Weapons (NPT), and does not give up the right to enrich uranium.

Approving full-time National Assembly deputies of the 16th term of Lam Dong and Thanh Hoa provinces

|

Vice Chairman of the National Assembly Nguyen Thi Thanh signed and issued 2 Resolutions on approving full-time National Assembly deputies of the 16th term in Lam Dong and Thanh Hoa.

Expecting breakthroughs from high-speed railway projects

|

Many high-speed railway projects have been started, bringing expectations of breakthroughs.

Supercomputer predicts U17 Vietnam's win rate in Southeast Asian semi-finals

|

Supercomputer (AI system) predicts the winning rate of U17 Vietnam and U17 Australia in the semi-finals of U17 Southeast Asia 2026.

Need 743,907 billion VND to build 30 urban railway lines in Hanoi and Ho Chi Minh City

|

The Minister of Construction said that 30 urban railway lines in Hanoi and Ho Chi Minh City have a total length of about 2,224km, and the capital demand is about 743,907 billion VND.

Ha Nam issues second alert on Day River

Thu Giang |

On September 22, the authorities of Ha Nam province issued an urgent dispatch on issuing a second warning on the Day River and proactively responding to floods.

Ha Nam announced the dissolution of a branch

Thu Giang |

On September 20, the People's Committee of Ha Nam province announced the dissolution of the Ha Nam Provincial Construction Inspection Branch (under the Ha Nam Provincial Department of Construction).

Điều động, bổ nhiệm nhân sự mới ở Sơn La, Cà Mau, Hà Nam

PHẠM ĐÔNG |

Cà Mau, Thái Nguyên, Hà Nam, Bắc Ninh, Sơn La... vừa triển khai các quyết định điều động, chỉ định, bầu, bổ nhiệm nhân sự mới trong tuần (9.9 - 14.9).