Truck overturned on Ham Nghi - Vung Ang Expressway

TRẦN TUẤN |

Ha Tinh - A truck traveling on the Ham Nghi - Vung Ang expressway, when arriving at Cam Lac commune, suddenly overturned in the middle of the road.

The accident occurred at 7.25 a.m. on December 4 when a truck with license plate 37K - 333.xx carrying livestock feed was traveling on the highway in the North - South direction when it suddenly lost control, hit a hard median strip and overturned, blocking 2 lanes, causing traffic congestion.

Upon receiving the report, the Highway Traffic Control Patrol Team No. 4 (Traffic Police Department) coordinated with the expressway management unit to be present at the scene to direct traffic and investigate and clarify.

By 8:20 a.m. the same day, vehicles were able to travel through the section where the traffic accident occurred.

Initial information is that the vehicle's tire exploded, causing it to lose control and overturn.

TRẦN TUẤN
RELATED NEWS

Construction in 3 shifts to open the billion-dollar expressway in Tuyen Quang on December 19

|

Tuyen Quang - Contractors are speeding up construction, striving to open the Tuyen Quang - Ha Giang expressway to traffic on December 19.

Proposal to spend VND23,940 billion to build Vinh - Thanh Thuy expressway, 60km long

|

The Government proposes three specific mechanisms to invest in the construction of the Vinh - Thanh Thuy expressway, 60km long, with a total investment of VND 23,940.34 billion, with a scale of 4 lanes.

Son Hai Group wins bid for Tan Phu - Bao Loc Expressway Project worth VND14,475 billion

|

Bao Loc - Son Hai Group Company Limited is the winning bidder for the Tan Phu (Dong Nai) - Bao Loc (Lam Dong) expressway construction project.

Dump truck carrying motorbikes and people through flooded areas of National Highway 1 in Lam Dong

|

Lam Dong - On the morning of December 4, floodwaters overflowed into Hong Son commune and flowed rapidly, turning National Highway 1, km1678, into a river, causing traffic disruption.

Khanh Hoa Trade Union represents lawsuit to collect unpaid wages and insurance for workers

|

Khanh Hoa - After a long period of being owed wages and social insurance by enterprises, many employees of Mai Linh Nha Trang Company Limited have authorized the Trade Union to file a lawsuit.

Ward in Hanoi requests apartment complex investor to remove ban on selling electric vehicles

|

Hanoi - Hoang Liet Ward has just issued a notice requesting the investor of HH Linh Dam apartment complex not to refuse to keep electric vehicles of residents.

Floodwaters rise 30 boats of Lam Dong fishermen sank and drifted into the sea

|

Lam Dong - About 30 fishing boats in Lien Huong commune sank and drifted into the sea due to complicated floods.

Many gateway crossings to Da Lat continue to collapse, first of all, Mimosa Pass is temporarily closed

|

Da Lat - Prolonged heavy rain caused landslides on many gateway crossings to Da Lat. In particular, Mimosa Pass was seriously eroded, and traffic was temporarily suspended.

Construction in 3 shifts to open the billion-dollar expressway in Tuyen Quang on December 19

Việt Bắc |

Tuyen Quang - Contractors are speeding up construction, striving to open the Tuyen Quang - Ha Giang expressway to traffic on December 19.

Proposal to spend VND23,940 billion to build Vinh - Thanh Thuy expressway, 60km long

PHẠM ĐÔNG |

The Government proposes three specific mechanisms to invest in the construction of the Vinh - Thanh Thuy expressway, 60km long, with a total investment of VND 23,940.34 billion, with a scale of 4 lanes.

Son Hai Group wins bid for Tan Phu - Bao Loc Expressway Project worth VND14,475 billion

Phúc Khánh - Phan Tuấn |

Bao Loc - Son Hai Group Company Limited is the winning bidder for the Tan Phu (Dong Nai) - Bao Loc (Lam Dong) expressway construction project.