mimosa Pass
Construction of the overpass on Mimosa Pass - the gateway to Da Lat reaches 80% progress
|
Lam Dong - After the Binh Ngo Tet holiday, the overpass construction site on Mimosa Pass (National Highway 20, Xuan Huong ward - Da Lat) has resumed construction.
Many gateway crossings to Da Lat continue to collapse, first of all, Mimosa Pass is temporarily closed
|
Da Lat - Prolonged heavy rain caused landslides on many gateway crossings to Da Lat. In particular, Mimosa Pass was seriously eroded, and traffic was temporarily suspended.
Mimosa and D'ran Pass prepare to open the route, reconnecting traffic to Da Lat
|
Lam Dong - Units are focusing on human resources, vehicles... to reinforce and overcome landslides on Mimosa Pass and D'ran Pass to open to traffic as promised.
Chairman of Lam Dong province directs to open Mimosa Pass on November 30
|
Lam Dong - Mr. Ho Van Muoi, Chairman of the Provincial People's Committee, directed the investor and construction unit to speed up the progress to open Mimosa Pass on November 30.
The temporary road to avoid landslides on Mimosa Pass is about to open to traffic, relieving congestion to Da Lat
|
Da Lat - The temporary bypass road on Mimosa Pass is under construction with a scale of 2 lanes and is expected to open to traffic on November 28.
Lam Dong aims to open Mimosa Pass in the next 10 days
|
Lam Dong - With the support of the Ministry of Construction, Lam Dong province aims to open first-hand the first-hand traffic jam in Da Lat in the next 10 days.
Lam Dong declares emergency situation at Mimosa Pass and National Highway 20
|
Lam Dong - The Provincial People's Committee has declared a natural disaster emergency on Mimosa Pass and National Highway 20 to deploy measures to overcome the consequences of landslides.
Close-up of Mimosa Pass landslide, broken in half, traffic gate to Da Lat paralyzed
|
Da Lat - Prolonged heavy rain caused Mimosa Pass to sink nearly 30m deep, a section of road about 100m long was completely broken, paralyzing the gateway to Da Lat.
Lam Dong immediately deploys solutions to overcome the landslide of Mimosa Pass
|
Lam Dong mobilizes maximum forces and means to deploy solutions to overcome landslides on Mimosa Pass to soon reopen the route.
Mimosa Pass to Da Lat is broken and completely cut off at night
|
Lam Dong - Mimosa Pass in Xuan Huong - Da Lat Ward has just experienced a serious subsidence, the entire road surface has been broken and completely cut off.
Mimosa Pass in Lam Dong is congested again due to continued landslides
|
Lam Dong - Prolonged heavy rain caused rocks and forest trees on the positive slope to collapse onto the road surface of Mimosa Pass, fortunately many people discovered and avoided it.