Deteriorated square in Cao Bang is renovated in appearance

Tân Văn |

Cao Bang - Pac Bo Square is being renovated in appearance after a long period of deterioration.

According to the actual records of PV on May 28, workers are renovating and repairing some items at Pac Bo Square (in the new administrative center area of Cao Bang province).

The previous broken stone surfaces have been peeled off and replaced, the drainage system and lamp posts have also been renovated. The sidewalk around the square has been paved with new stones to replace the previous brick floor.

Mr. Trieu Van Dung (De Tham ward) - shared: "In the past, the square was degraded, the stone walls were broken everywhere, the sidewalks sank and collapsed, but now it has been renovated and more beautiful".

Khu vuc ghe ngoi cung nhu cac vi tri trang tri dang duoc op lai, thay the da moi. Anh: Tan Van
The seating area as well as the decorative positions are being re-oped, replacing with new stones. Photo: Tan Van

It is known that the repair of the square this time is part of the project to Upgrade and renovate sidewalks and infrastructure in the provincial administrative center and renovate a number of streets in Cao Bang City.

The sidewalk renovation starts from the Km5 roundabout to Na Cap bridge with a route length of about 3,950m, passing through three wards: Ngoc Xuan, Song Hien and De Tham. The total investment capital for the project is more than 56 billion VND, implemented within 100 days (approved the contractor selection results on October 28, 2024).

Via he da lat mat da moi hoan chinh, he thong cot den dang duoc xay dung lai. Anh: Tan Van
The sidewalk has been completely paved with new stone, the light pole system is being rebuilt. Photo: Tan Van

Mr. Hoang Xuan Thao - Head of the Urban Management Department of Cao Bang City - said: "The square is being renovated and repaired for some items, this is part of the sidewalk renovation project for some streets in the area, expected to be completed in 2025".

The project is expected to contribute to maintaining the sustainability of a civilized urban street, improving technical infrastructure, and making the urban face more and more spacious.

This will promote economic, trade, service and tourism development, serve people's lives, while creating an ideal living environment, ensuring social security.

Quang truong Pac Bo dang duoc chinh trang toan dien. Anh: Tan Van
Pac Bo Square is being comprehensively renovated. Photo: Tan Van

Previously, Lao Dong Newspaper had an article reflecting "The square is in the center of degradation, dangers lurking to the people".

Recorded at the time of July 2023, at this time, Pac Bo Square has deteriorated in many items after 5 years of use. A series of seating areas have been covered with broken iron mounds, anchor screws like "traps" for people playing here.

Mot so hinh anh xuong cap tai Quang truong Pac Bo, ghi nhan vao thang 7.2023. Anh: Tan Van
Some images of deterioration at Pac Bo Square, recorded in July 2023. Photo: Tan Van

At this time, many parents who let their children play here are always worried that their children will be injured due to a collision with rusty iron ends.

Dien mao quang truong khi chua duoc cai tao. Anh: Tan Van
The appearance of the square when it has not been renovated. Photo: Tan Van

Up to now, the square has been repaired, and after completion, it will create a clean landscape to create a space to serve the entertainment needs of the people.

Tân Văn
TIN LIÊN QUAN

Cao Bang plans to respond when there are more than 300 landslide risk points

|

Cao Bang - The locality currently has more than 300 points at high risk of landslides and flash floods.

6 kiosks burned down in the Dong Khe market fire in Cao Bang

|

Cao Bang - A major fire on the evening of May 25 burned down 6 kiosks at Dong Khe market.

Risk of a stone curb collapse, Bac Kan changes plan to save people from death

|

Bac Kan - The death hole on National Highway 3B (Na Ri) continues to be complicated, the authorities have been forced to temporarily stop draining water to avoid the risk of landslides.

Food trafficking network and evasion of authorities

|

Bringing great benefits, dirty foods and smuggled animal organs are "banned goods" on the market and are still circulating through an underground, sophisticated network.

In 2026, Hanoi will complete the road started more than 10 years ago

|

Hanoi - It is expected that in the first quarter of 2026, the Ring Road 2.5 project, Dam Hong - National Highway 1A section, with an investment capital of more than 1,300 billion VND, will be completed after more than 10 years from the groundbreaking date.

Elon Musk withdraws from President Trump's administration

|

Billionaire Elon Musk withdrew from the Trump administration after a shocking statement about the big and beautiful law: I think it cant be big and beautiful at the same time.

Forecast of the possibility of a low pressure near the coast of Vietnam strengthening into a storm

|

The risk of the low pressure near the coast of Vietnam strengthening into a storm in the next 24 hours is forecast to be low but will cause heavy rain.

Coach Kim Sang-sik hopes Man United will keep an eye on Hai Long

|

Coach Kim Sang-sik gave many compliments to the players of the ASEAN All Stars team after the victory over Man United.

Cao Bang plans to respond when there are more than 300 landslide risk points

Tân Văn |

Cao Bang - The locality currently has more than 300 points at high risk of landslides and flash floods.

6 kiosks burned down in the Dong Khe market fire in Cao Bang

Tân Văn |

Cao Bang - A major fire on the evening of May 25 burned down 6 kiosks at Dong Khe market.

Quảng trường ngay trung tâm xuống cấp, hiểm nguy rình rập người dân

An Trịnh |

Cao Bằng - Sau một thời gian sử dụng, các hạng mục trong công trình quảng trường Pác Bó đã bắt đầu xuống cấp, hư hỏng.