Traffic

20h News: Traffic lights in Hanoi upgraded with AI, temporarily stopped counting seconds

|

Reasons why traffic lights at many intersections in Hanoi are left behind for a few seconds; Reservoirs broken on mountains in Lam Dong are not built without permission, have not been technically assessed...

Hot Saigon: hotline for the start of construction of a 6.6 km elevated road in the South of Ho Chi Minh City

|

Hot Saigon on November 8: Determined the start date of the 6.6 km long elevated road in the South of Ho Chi Minh City; Forecast of the time when the rain will decrease, the tide will decrease rapidly in the South...

unsafe to clear landslides across coastal roads

|

After 5 days of landslides causing congestion on the Ha Tinh coastal road through Ky Xuan commune, the cleanup to open the route has not yet been implemented.

Progress of the billion-dollar expressway in Tuyen Quang before the opening date

|

Tuyen Quang - Contractors are implementing 3 shifts and 4 teams, aiming to complete the Tuyen Quang - Ha Giang expressway project on schedule.

Hanoi expands bus network to Hong Son and Hoa Phu communes

|

Hanoi - From November 10, Hanoi Passenger Transport Joint Stock Company will operate a bus route connecting to Hong Son commune, Hoa Phu and neighboring areas.

Trucks collided on Highway 1 through Khanh Hoa

|

A series of accidents involving three trucks occurred on National Highway 1 through Cam Lam district (Khanh Hoa), leaving three people seriously injured and many properties damaged.

Han Market in Da Nang is airy, welcoming an increasing number of visitors

|

Restoring traffic order around Han Market, Da Nang has created a comfortable shopping space, contributing to increasing the number of visitors to this market.

People queue for kilometers to take Metro after more than 10 years of waiting

|

HCMC - A large number of people from districts of HCMC flocked to Metro Station No. 1 to experience the subway after more than a decade of waiting.

Just go through the ward in Bac Ninh and pay the fee like going to Hanoi

|

Voters in Bac Ninh expressed that even if they only go through the ward (5 km), they still have to pay the highway fee to Hanoi.

How do people move around during the construction of the overpass in Van Khe?

|

Hanoi - Hanoi Department of Transport (GTVT) banned vehicles from circulating on Van Khe Street to construct a pedestrian overpass.

Removing obstacles in forest conversion at highway tunnels worth over 1,000 billion VND

|

Ha Tinh - The road tunnel of the North-South expressway, Eastern phase 2021 - 2025 in Ha Tinh has now had its natural forest conversion procedures cleared.

Metro Line 1 officially operates, fulfilling a 17-year dream

|

HCMC - On the morning of December 22, Metro Line No. 1 (Ben Thanh - Suoi Tien) officially operated, marking a historical milestone after 17 years from the date of approval and 12 years of construction.

A provincial road in An Giang may become a national highway

|

The Ministry of Transport said that a provincial road in An Giang could become a national highway in the near future.

Khanh Le Pass reopens after many days of isolation due to landslides

|

Khanh Le Pass on National Highway 27C connecting Nha Trang and Da Lat has been reopened to traffic after many days of being temporarily closed due to landslides.

Metro Line 1 officially went into commercial operation this morning, December 22

|

HCMC - Metro Line No. 1 (Ben Thanh - Suoi Tien) began commercial operation today (December 22).

The road to Pham The Hien Catholic hamlet is currently congested

|

HCMC - On the evening of December 21, the road leading to Pham The Hien Catholic hamlet (District 8) was experiencing prolonged traffic congestion.

Record the driver who dropped sand and rocks on Highway 51

|

Ba Ria - Vung Tau - The driver who dropped sand and rocks on National Highway 51, affecting traffic, was quickly tracked down by the police and a violation report was made.

11 elevated stations of Metro Line 1 before welcoming passengers

|

HCMC - Currently, 11 elevated stations of Metro Line 1 (Ben Thanh - Suoi Tien) have been completed and are waiting for commercial operation tomorrow, December 22.

More than 1,300 billion VND to build a 4.4km long belt road in Dong Nai

|

Dong Nai - On December 21, Long Khanh City People's Committee started construction of Ring Road 1 - Long Khanh City, with a total investment of more than 1,300 billion VND.

In 2025, Hanoi will reclaim land from nearly 700 households to open a 6-lane road

|

Hanoi - In 2025, Thanh Xuan district will focus on clearing land for nearly 700 households to build a 1.5km long road with an investment capital of more than 2,500 billion VND.