Traffic

Hanoi conducts general review of items at risk of unsafety on 2 metro lines

|

Hanoi - After the plaster peeling incident at Van Khe station, the Department of Construction requested to review and inspect items at risk of unsafety on 2 metro lines.

Hanoi Highway 16 years not completed, Ho Chi Minh City sets land handover deadline

|

Ho Chi Minh City - Prolonged for 16 years due to site clearance problems, the Hanoi Highway expansion project has just been set a deadline by Ho Chi Minh City to complete compensation and hand over the remaining land.

Saigon Hot News: Operating time of Long Thanh airport passenger terminal

|

Saigon Hot News on June 17: Operating time of Long Thanh airport passenger terminal; Investigating a group of subjects carrying weapons to people's houses to cause trouble;...

Accelerate construction, determined to put Lien Khuong airport into operation on August 19

|

Lam Dong - Provincial leaders requested ACV and construction units to accelerate the repair project, ensuring Lien Khuong airport resumes operation from August 19.

Phan Thiet airport completes geological drilling, preparing to accelerate construction

|

Lam Dong - Phan Thiet Airport Project - Civil aviation item has completed geological drilling and is preparing to accelerate construction according to schedule.

What is it about Metro Line 1 that attracts so many people to experience it?

|

HCMC - These days, at Metro No. 1 stations, many people come to experience the final test run before commercial operation.

Northwest end of day: Landslide on national highway connecting Cao Bang and Ha Giang

|

Landslide on the main national highway connecting Cao Bang and Ha Giang; Drilling and destroying the road surface on the remaining section of Phong Chau bridge; Bustling in the excavation capital in Yen Bai are some of the prominent news.

Motorcycles banned from Hoan Kiem and Ba Dinh from 2025

|

Hanoi - From 2025, motorbikes that do not meet level 2 emission standards will be banned or restricted from entering low emission zones. So how is this standard regulated?

Banning a series of vehicles on many routes in Dong Da and Hai Ba Trung

|

Hanoi - An Trach Street (Dong Da) and Minh Khai Street (Hai Ba Trung) have been adjusted to reorganize traffic and flow.

Official ban on cars with more than 29 seats from entering Nha Trang center

|

Khanh Hoa - The locality officially banned passenger cars with more than 29 seats from entering Nha Trang city center from December 20.

Kien Giang operates traffic violation camera system

|

Kien Giang - Starting from 0:00 on January 1, 2025, penalties for violations of road traffic safety order will be implemented through the camera surveillance system.

Another fishing boat ran aground and was sunk by waves at La Gi estuary

|

Binh Thuan - A fishing boat ran aground at La Gi port and sank after being hit by a big wave. The three workers on board managed to swim to shore.

Teenager riding a motorcycle without a license plate crashes head-on into a car in Hoa Binh

|

Hoa Binh - Authorities are investigating a traffic accident on National Highway 12B through Lac Son district that injured two people.

Hanoi adjusts traffic organization on An Trach street

|

Hanoi - The Department of Transport has just announced the adjustment of traffic organization on An Trach Street (Dong Da District).

Danger lurks on degraded highway in Binh Dinh

|

Over the past month, after many heavy rains, the main national highways through Binh Dinh province have fallen into a state of serious degradation. The damaged and eroded road surfaces have caused frustration for residents and drivers.

Start drilling and breaking the road surface on the remaining Phong Chau bridge section

|

Phu Tho - Truong Son Construction Corporation is drilling and breaking the road surface on the remaining Phong Chau bridge section in Phung Nguyen commune, Lam Thao district.

191 streets in Hanoi are eligible for vehicle parking

|

Hanoi - The Hanoi People's Committee has just approved 191 roads and streets that are eligible for parking on part of the roadway.

Overloaded driver delayed for more than 2 hours, not cooperating with traffic police

|

Hanoi - Overloaded by more than 30% but the driver refused to cooperate with the Traffic Police, delaying for more than 2 hours.

Current status of the 20-year-old bridge across the Da River after repair

|

After a period of suspension for repairs, Trung Ha bridge connecting Phu Tho province and Hanoi capital has returned to normal operation.

Accelerating construction of strategic roads through 3 northern provinces

|

The parallel project of Beltway 4 in the Capital region is being focused on by localities, striving to complete the route in 2025.