Traffic
People self-dismantle works, hand over land for more than 7km of road in Hung Yen
|
Hung Yen - After propaganda and mobilization, some households on DH66C route, Hung Ha commune have proactively dismantled the violating construction and handed over the site.
Many cars collide in a chain reaction on Nhat Tan bridge
|
Hanoi - Many cars collide in a chain reaction on Nhat Tan bridge. Functional forces are investigating the cause.
Motorbike crushed after head-on collision with truck, 1 person died
|
Lam Dong - A motorbike driven by a young man crashed head-on into a truck on National Highway 1. This young man died on the spot.
Traffic police force made records of 746 violations, revoked 166 driver's licenses
|
Khanh Hoa - In 5 months, the traffic police force made records of 746 violations and revoked 166 driver's licenses for violations.
Investing 158 billion VND to build a road connecting Tuyen Quang - Phu Tho expressway
|
Phu Tho will have another traffic route invested in construction to connect the old Thanh Ba district center with the Tuyen Quang - Phu Tho expressway.
A series of super cool license plates will be available in the session on November 25-26
|
License plate auction: Vietnam Joint Stock Auction Company has announced a list of 20,000 license plates expected to be auctioned on November 25-26, 2024.
Adjusting the hundred billion road project in the heart of Son La city
|
Son La - The project to build a road with a total investment of hundreds of billions of VND in Son La city has just been approved for adjustment by the Provincial People's Committee.
Traffic project stuck because natural forest has not been cleared
|
Quang Tri - The natural forest area that the road passes through has not been cleared, causing the road project to be stuck and behind schedule.
The 2,600 billion VND belt project connecting Ho Chi Minh City - Dong Nai is behind schedule
|
Dong Nai - 3 main packages in the component project 3 of Ho Chi Minh City's Ring Road 3 passing through Nhon Trach district are behind schedule, with only 55% of the construction site completed.
Proposal to expand the range of 4-wheel electric vehicles is well received
|
Currently, information about the proposal to expand the scope of operation of 4-wheel electric vehicles by the Hanoi Department of Transport is receiving much attention from the people.
Hanoi's 5th underpass at risk of being "shelved" waiting for connecting road
|
Hanoi - The Ring Road 2.5 underpass is expected to be completed in 2025, but the road connecting to this tunnel has been unfinished for many years, with no completion date set.
Teenager riding unlicensed car dies after collision with truck
|
Son La - Police are investigating a traffic accident on National Highway 279D through Muong La district that left a teenager dead.
Underground metro section Nhon - Hanoi station revealed
|
Hanoi - The progress of the underground metro section Nhon - Hanoi station has reached 50.27%, in which the TBM excavator has drilled more than 600m underground.
Clarifying the 4-car accident that injured 2 people
|
Binh Duong - On the evening of November 16, Thuan An City police are conducting a crime scene investigation, taking statements, and clarifying the 4-vehicle accident on Highway DT743.
Accident scene between 2 taxis and 2 motorbikes in Binh Duong
|
On Highway 743 through Thuan An City, Binh Duong Province, a series of accidents occurred between 2 taxis and 2 motorbikes.
Equipment at Hoa Lien-Tuy Loan Expressway does not meet requirements
|
Da Nang - On November 16, Deputy Minister of Transport Nguyen Danh Huy inspected the construction status of the Hoa Lien - Tuy Loan expressway project.
Hot in Saigon: Building an elevated road connecting District 6, 8, Binh Chanh
|
Hot News Saigon November 16: HCMC builds elevated road connecting District 6, 8, Binh Chanh; HCMC merges wards, changes documents for free for 800,000 people;...
2 bridge and road projects worth 1,170 billion VND in Dong Nai at risk of waste
|
Dong Nai - Huong Lo 2 extension (section 1) and Vam Cai Sut bridge with a total investment of 1,170 billion VND are at risk of being wasted due to lack of connecting roads.
Ho Chi Minh City expands National Highway 22 through District 12 and Hoc Mon to 10 lanes
|
HCMC - National Highway 22 (from An Suong intersection to Ring Road 3) 8.7 km long through District 12 and Hoc Mon district will be expanded to 60m with 10 lanes, with a total capital of VND8,400 billion.
Construction of 1,000 billion VND expressway overpass over National Highway 51 is about to start
|
Dong Nai - Ben Luc - Long Thanh Expressway will be extended to Bien Hoa - Vung Tau Expressway, the section through National Highway 51 will have an overpass investment of 1,000 billion VND.
