Traffic
Truck overturns and crushes 7-seater car on Phu Son Pass in Lam Dong, 1 woman dies, baby boy injured
|
Lam Dong - A truck carrying pigs had a tire burst, overturned when going down Phu Son Pass, crushed a 7-seater car, killing a woman and injuring a boy.
Construction of flood prevention works on National Highway 55 through Lam Dong
|
Lam Dong - The flood control project of National Highway 55 through Bao Lam 3 commune is being implemented with a budget of 1.2 billion VND, to overcome the prolonged flooding situation.
Increase train trips, tighten safety on Sa Ky - Ly Son route during National Day 2/9
|
Quang Ngai - National Day September 2nd, Sa Ky - Ly Son route is expected to welcome 1,000 - 1,500 passengers per day. Forces strengthen ships and control safety.
Cao Lanh - An Huu expressway phase 1 to be completed in 2026
|
Dong Thap - Cao Lanh - An Huu expressway project, phase 1, over 27km long, will be completed in 2026.
Review of compensation for the extended Ly Thai To road project
|
Lang Son - The province requests to review land records at the Ly Thai To extended road project, to prevent overlapping compensation or omission of people's rights.
Can Tho Secretary inspects progress of nearly 10 trillion VND expressway
|
Can Tho - On October 25, Secretary of the Can Tho City Party Committee Nguyen Van Hieu inspected the construction progress of the Chau Doc - Can Tho - Soc Trang expressway, the section passing through the city.
A series of beautiful number plates in Hanoi have huge prices in the session of October 25
|
License plate auction: On October 25, Vietnam Joint Stock Auction Company organized an auction of 8,000 license plates in 5 time frames.
Central district of Ho Chi Minh City expands sidewalk rental on 52 streets
|
HCMC - District 1 expands the sidewalk rental pilot program on 52 streets, using management technology to create favorable conditions for people.
Running red lights as if no one was there, a series of drivers received fines
|
Hanoi - A series of vehicles, including trucks, cars, motorbikes carrying bulky goods... were fined by authorities for running red lights.
Hanoi connects roads worth over 6,000 billion VND after many years of difficulties
|
Hanoi - The Southern axis road project through Hong Minh commune (Phu Xuyen district) is being connected after many years of land clearance problems.
Worried about slow progress, Quang Tri urges more than 14,000 billion VND dynamic project
|
The My Thuy Port Project (Quang Tri Province) with a total investment of VND 14,234 billion, after 3 years of being idle, was put into operation in March 2024. However, because this important project is at risk of being behind schedule, the locality has continuously urged and set up inspection teams.
Close-up of the bypass road costing over 80 billion VND/km in Tuyen Quang
|
Tuyen Quang - The Son Duong town bypass road is over 4km long, with a total investment of over 329 billion VND and is about to be completed.
Hundred billion bridge to relieve traffic jams in the West area speeds up progress
|
HCMC - After a period of restart, Tan Ky - Tan Quy Bridge (Binh Tan District, HCMC) is speeding up to meet the schedule of opening to traffic by the end of December this year.
The most congested route in Ho Chi Minh City is 140% overloaded
|
Nguyen Tat Thanh Street, connecting Districts 7, 4 and 1, is currently the most seriously congested spot in Ho Chi Minh City, with traffic volume exceeding capacity by 140%.
Proposal to straighten roads and preserve century-old villas in Dong Nai
|
Dong Nai - The provincial Department of Culture, Sports and Tourism agreed to propose preserving the century-old villa according to the plan to straighten the riverside road.
Rocks and dirt litter the first bicycle lane in Hanoi
|
Hanoi - For many days now, the road for bicycles and pedestrians along the To Lich River (Hanoi) has been littered with construction materials, causing unsafety for residents.
Details of the 6,500 billion VND highway expansion project have just been approved
|
The Government has just approved the investment policy for the project to expand the North-South expressway in the East, Cam Lo - La Son section, with a length of about 98.35km.
The most beautiful 6-lane road in Thanh Oai, Hanoi is about to be completed
|
Hanoi - The 6.5km, 6-lane road considered the most beautiful in Thanh Oai district is entering the "final stage", expected to be completed and technically opened to traffic by the end of 2024.
Close-up of 200m muddy road in the center of Can Tho
|
Can Tho - The residential roads along both sides of Hung Loi bridge (Ninh Kieu district) are muddy and full of potholes, causing many difficulties for people every time they travel.
6-lane road to relieve traffic jam in Thu Duc "froze" for 4 years
|
HCMC - The 6-lane road of Ring Road 2 through Thu Duc City has been "frozen" for more than 4 years. Although the project was extended to 2026 for completion, it has not yet restarted.
