Traffic
Traffic Police Department recommends after 2 consecutive accidents on the highway
|
In just two days, August 28-29, two accidents due to not keeping a safe distance on the highway damaged 11 vehicles and caused traffic congestion.
Long Thanh airport construction during holidays 2. 9
|
Dong Nai - Long Thanh airport project is under construction on both holidays and the 2nd of September holiday to ensure progress.
Lien Khuong Airport is expected to serve more than 7,000 passengers per day on National Day
|
Lam Dong - Lien Khuong Airport is expected to operate 36 - 40 flights/day, serving 7,000 - 8,500 passengers/day during the peak National Day 2. 9.
Saigon Hot News: Dong Nai recovers 45,000m2 land to deploy metro project from Ho Chi Minh City to airport
|
Saigon Hot News August 29th: Dong Nai recovers 45,000m2 land to deploy metro project from Ho Chi Minh City to airport; Ho Chi Minh City supermarket launches big promotions on September 2nd holiday;...
Ho Chi Minh City is about to build a 4-lane Vam Thuat bridge connecting An Phu Dong with the center
|
Ho Chi Minh City - Vam Thuat bridge is 370 m long, 4 lanes wide and about 1.8 km of road with a total investment of 6,757 billion VND, helping to increase the connectivity of An Phu Dong with the center.
There are still parents who think that their 16 year old children need to wear helmets
|
Violations of traffic order and safety among school-age children in Hanoi have decreased significantly. However, there are still parents who do not care about wearing helmets for their children.
Road along Truong Dai canal - Saigon river completed in 2025
|
HCMC - The canal-side road from Truong Dai Bridge to Saigon River, part of the Tham Luong - Ben Cat - Rach Nuoc Len Canal Project, strives to be completed before April 30, 2025.
Many black spots causing accidents in Can Tho's inner city have been fixed
|
Can Tho - After installing a new traffic light system on Hoa Binh Avenue, traffic disorder and safety have significantly decreased.
Tan An market traders hope to have a new route before Tet
|
Can Tho - The road leading to Tan An market (Ninh Kieu district) is being upgraded and repaired. Many traders are excited and hope to complete it before Tet.
Ignoring the prohibition sign, motorbikes snake their way up to the second floor of Thang Long bridge
|
At the beginning of Thang Long Bridge (Hanoi), there is a sign prohibiting vehicles such as motorbikes, small vehicles... from going up to the second floor of the bridge. However, there are still many people who violate this.
Spending 6,488 billion to expand Cam Lo - La Son highway to 4 lanes
|
The total investment for the expansion of the Cam Lo - La Son expressway project is about 6,488 billion VND, increasing from 2 lanes to 4 lanes.
Binh Dinh voters propose spending 1,500 billion to expand the airport
|
Binh Dinh voters have just proposed a budget of 1,500 billion to support airport expansion.
Traffic chaos in Ha Long due to traffic light problem
|
Quang Ninh - In Ha Long City, many traffic light systems are not working, causing chaos at important intersections, potentially causing traffic accidents.
Motorcycle crash kills 2 in Gia Lai
|
Gia Lai - Two motorbikes going in opposite directions crashed into each other, killing two victims.
Proposed 3 routes for Cat Lai bridge project connecting Ho Chi Minh City and Dong Nai
|
Dong Nai - 3 route options for the Cat Lai bridge construction project connecting Nhon Trach district (Dong Nai) and Thu Duc city (HCMC) have been proposed for study by the consulting unit.
1,300 billion VND road in Hanoi stalls before the finish line
|
Hanoi - The Ring Road 2.5 project, Dam Hong - National Highway 1A section, has stopped construction since 2020 when it reached over 90% of the volume and there is no date yet for resumption of construction.
Finalize the time to start construction of the 2,000 billion VND coastal road in Khanh Hoa
|
Khanh Hoa - The locality requested the investor to start the coastal road project from Van Luong commune, Van Ninh district to Ninh Hoa town at the end of November 2024.
Consider proposal to build Nha Trang - Da Lat expressway before 2030
|
The Government assigned ministries and branches to consider proposals on investing in the Nha Trang - Da Lat expressway before 2030 under the PPP method.
Construction of 3,960 billion VND riverside road in Dong Nai is in disarray
|
Dong Nai - The project to build a road along Cai River with an investment of 3,960 billion VND is stuck in site clearance, has no access road, and must go through a narrow residential road.
Increase penalties for bicycles to reduce "law evasion"
|
According to people, increasing the penalty for alcohol concentration violations will limit the practice of "circumventing the law" by using bicycles and electric bicycles while drinking alcohol.
