Society

Storm No. 13 Kalmaegi is extremely dangerous, very strong when it makes landfall on the night of November 6

|

Storm No. 13 Kalmaegi can cause dangerous combinations such as strong winds, big waves, heavy rain; risk of flash floods, landslides and flooding in the Central region.

Forecast of very heavy rain in the provinces due to storm No. 13 Kalmaegi and peak rain

|

Storm No. 13 Kalmaegi is assessed as particularly dangerous. With a wide circulation, the storm will cause heavy rain in many provinces and cities of our country.

Asia towards green growth through smart water governance

|

On November 5, the 23rd Asia Water Council (AWC) Conference and the AWC 2025 Technical Conference officially opened.

Prices and productivity have all decreased, Quang Ngai farmers are still busy harvesting cassava to avoid the storm

|

Quang Ngai - Farmers are massively harvesting noodles to avoid storm No. 13, although the price of fresh noodles is only from 1.2 - 1.3 million VND/ton, down 700,000 - 850,000 VND/ton compared to the same period in 2024.

Gia Lai Chairman inspects flood-prone areas, people wrap to evacuate to avoid storm

|

Gia Lai - On the afternoon of November 5, Chairman of the Provincial People's Committee Pham Anh Tuan directly inspected the flood-prone areas, where thousands of households were evacuating to storm No. 13 shelters.

Merging the Department of Construction of Tuyen Quang and Ha Giang

|

On June 2, the Departments of Construction of Tuyen Quang and Ha Giang held a meeting to discuss and agree on a plan to merge the two departments, preparing for the merger of the two provinces.

The Ministry of Home Affairs responds to the payment of allowances to the Chairman of the Commune-level Association

|

The Ministry of Home Affairs has just responded and provided information on regulations on paying allowances to Chairmen of the Veterans Association at the commune and ward levels.

Mr. Tran Manh Toan becomes Director of Social Insurance Region XXVI

|

Dak Lak - Mr. Tran Manh Toan was transferred and appointed to the position of Director of the Social Insurance of the XXVI region from June 1.

C.P Company said that the image of sick pigs was taken at a slaughterhouse in Hau Giang

|

Hau Giang - Management of the slaughterhouse, CP Company in Hau Giang said that this is an image taken at the Dung - Nga slaughterhouse, to save the report to the Veterinary Department.

Dozens of households in Quang Binh are worried about rolling rocks from high hills

|

Quang Binh - Many households in Khe Ngang village are worried because they are afraid of large rocks rolling down from high hills, the authorities are checking and finding a solution.

Image of controlling a large fire at HKB - Hoa Lu Paper Company, Ninh Binh

|

Ninh Binh - The authorities controlled the fire at HKB - Hoa Lu Paper Company, causing no human casualties.

Eliminate the problem of "smoothing" administrative procedures in Thai Nguyen

|

Thai Nguyen - In order to improve the investment environment, the province requires strict handling of violations, not allowing additional costs beyond regulations when completing administrative procedures.

Sand shortage threatens the progress of Ho Chi Minh City Ring Road 3

|

The Ho Chi Minh City Ring Road 3 project - a national key transport infrastructure project - is facing the risk of being behind schedule due to a shortage of sand for embankment, especially in the western packages passing through Cu Chi, Hoc Mon and Binh Chanh districts.

Expected number of positions and leadership positions of newly established departments and offices of the People's Committee of the commune

|

The expected number of positions and leadership positions of departments and offices of the newly established Commune People's Committee are stated in Official Dispatch 09/CV-BCD.

La Lay Border Gate Overloaded Due to Lack of Connecting Infrastructure

|

La Lay International Border Gate (Quang Tri) is an important connection point between Central Vietnam and Southern Laos and Northeast Thailand. However, after 10 years of upgrading, this border gate has not met expectations as the essential infrastructure is still unfinished and the connecting road is seriously degraded.

Cyclo driver in Nha Trang apologizes for offensive behavior on the road

|

Khanh Hoa - The cyclo driver who committed offensive acts in Nha Trang was aware of the incorrect behavior and apologized to the tourists.

Starting the peak of general control of ships on rivers in Hanoi

|

Hanoi - The waterway police general inspection and control of vessels and boats equipped with pumping, suction and transportation of sand, gravel and stone on rivers.

The burning heat of over 40 degrees Celsius in the North is about to end

|

According to the meteorological agency, today, June 2, the North will have places with severe heat above 40 degrees Celsius; from May 3, the heat will stop.

Another trillion-dong hydropower project on the Gam River

|

Tuyen Quang - The Yen Son Hydropower Project on the Gam River with a total investment of VND3,918 billion is expected to be commercially operational by the end of 2025.

Hau Giang inspects the pig slaughter facility for processing pigs for CP Company

|

Hau Giang - The authorities are inspecting the pig slaughter facility for processing pigs for Joint Stock Company.