Traffic
An Phu intersection, the largest in Ho Chi Minh City, postpones completion time
|
Ho Chi Minh City - An Phu intersection worth more than 3,400 billion VND at the eastern gateway of Ho Chi Minh City has officially extended the completion time to the second quarter of 2026, instead of the end of 2025.
Collision with truck, motorcyclist dies on the spot
|
Ha Tinh - A traffic collision occurred on provincial road 547, passing through Co Dam commune, killing a man riding a motorbike.
Ho Chi Minh City today: Underpass construction, a section of National Highway 13 is narrowed
|
Ho Chi Minh City has 159 flooded points, needing nearly 348,000 billion VND to handle; Traffic is reorganized to construct underpasses through National Highway 13...
Deploying hammocks in Can Tho, many people are still confused
|
Can Tho has deployed hammock traps at many intersections, but people are still confused when traveling.
Ward Party Secretary and Chairman go to the scene 2 days/time to accelerate the progress of Ring Road 2.5
|
Hanoi - The Party Secretary and Chairman of Khuong Dinh ward go to the scene every 2 days to inspect and urge the progress of site clearance for the Ring Road 2.5 project.
Risk of unsafety when people take shortcuts through the Dai Ngai 2 bridge construction site
|
Can Tho - Many people do not follow the prescribed route but go straight into the construction site of the Dai Ngai 2 bridge access road under construction, posing a potential safety risk.
Trucks speeding towards the highway, Da Nang residents are insecure
|
Da Nang - The situation of trucks carrying soil speeding, encroaching on vehicles, and even not having license plates makes people extremely upset.
Landslide cuts off the road to Bach Ma peak: Finding solutions to overcome
|
HUE - Heavy rain caused serious landslides on the patrol road to Bach Ma peak, breaking the roadbed and affecting forest management and protection.
Van Phong - Nha Trang expressway has to be repaired and patched many sections before exploitation
|
Khanh Hoa - Although not yet put into operation, the first 13km of the Van Phong - Nha Trang expressway has appeared many damaged locations, requiring asphalt resurfacing.
Patchwork on Van Phong - Nha Trang expressway before operation day
|
Although not officially exploited, the beginning of the Van Phong - Nha Trang expressway, 13km long, recorded damage to the road surface, forcing the contractor to repave it.
Expressway is about to reach the finish line, National Highway 91C is at risk of overload
|
An Giang - Vehicle volume will increase sharply when expressways and international border gates are formed, placing National Highway 91C and Provincial Road 957 at risk of overload.
Expressways and ring roads race to connect Long Thanh airport
|
Dong Nai - Component 1 project of Bien Hoa - Vung Tau expressway connecting Long Thanh airport strives to technically open to traffic before the Lunar New Year 2026.
Suffering because of dirt roads in Da Nang
|
Da Nang - Dozens of households in An Hai ward are living in a "dusty, muddy" situation for many years due to a suspended traffic road project.
5 accidents on the same day injured and killed 6 people in Hai Phong
|
Hai Phong - The Traffic Safety Board has just announced the causes of 5 accidents that occurred on the same day.
Enforced land recovery for cases of not allocating land for Ring Road 4 construction
|
Hanoi - For cases of delay and non-compliance with site allocation for Ring Road 4 project, the government has issued a decision to enforce land recovery.
Mik Group withdraws from Ho Chi Minh City Ring Road 4 project
|
Dong Nai - The Provincial People's Committee assigned the Provincial Construction Investment Project Management Board to implement the Ring Road 4 project in Ho Chi Minh City after Mik Group requested to withdraw.
AI cameras intervene, series of cars covering license plates handled in Hanoi on weekend
|
Hanoi - AI cameras support traffic police to detect and strictly handle license plate-covered vehicles and many violations, contributing to ensuring traffic safety.
Deadline for completion of 2 large bridges across the Red River belonging to Ring Road 4
|
Hanoi - Hong Ha and Me So bridges across the Red River belong to the Ring Road 4 project in the Capital region, expected to be completed in 2028, after 30 months of construction.
VinSpeed surveys in Bac Ninh for a 5.3 billion USD high-speed railway project
|
Bac Ninh - The Provincial People's Committee has just issued an official dispatch on coordinating and supporting the survey and design of the Hanoi - Quang Ninh high-speed railway project of VinSpeed Company.
5 roads through Phu Tho Racecourse in Ho Chi Minh City have formed a connecting axis
|
Ho Chi Minh City - 5 roads in Phu Tho Racecourse area have formed connecting axes, accelerated construction, and prepared asphalt paving.