Traffic

Many self-made three-wheeled vehicle drivers labeled "injured soldiers, disabled" are handled

|

Hanoi - Many self-made three-wheeled vehicle drivers, with logos labeled "injured soldiers, disabled" were fined by traffic police forces.

Man dies after motorbike crashes into truck in Lam Dong

|

Lam Dong - A man died after driving a motorbike into the rear of a truck traveling in the same direction through Thuan Hanh commune.

Boat not yet operating, students still cross the Cau River to school by canoe

|

Thai Nguyen - While the ferry terminal is completing procedures to resume operation, students are still moving to school by specialized canoe.

The largest barge stuck at My Chanh bridge has been relocated

|

Quang Tri - The largest barge trapped at My Chanh bridge and the railway bridge has been successfully moved and towed to a safe location by rescue forces.

Rushing to construct a nearly VND 2,970 billion intersection connecting the Ben Luc - Long Thanh expressway

|

Ho Chi Minh City - After more than two months of construction, the Rung Sac road intersection project connecting the Ben Luc - Long Thanh expressway is being urgently constructed.

Multiple traffic collisions in Ho Chi Minh City, 2 people hospitalized for emergency care

|

HCMC - A series of collisions between cars, trucks and motorbikes on Phan Van Hon Street (HCMC), causing two people to be hospitalized and traffic congestion.

Construction density in Hanoi is causing traffic infrastructure to be overloaded

|

Hanoi - In many inner-city areas, the high construction density with a series of dense high-rise buildings has been causing overload on traffic infrastructure.

Hanoi will remove all parking lots under the bridge

|

Hanoi requested to review and relocate all parking lots under the bridge, tightening traffic infrastructure safety.

The first cable-stayed cable car at Phuoc An bridge, connecting Ho Chi Minh City and Dong Nai

|

HCMC - The national key infrastructure project of Phuoc An Bridge has just completed the first cable-stayed stretch, marking an important milestone in the construction process.

Current status of Phuoc An bridge completes the first cable-stayed stretching

|

The Phuoc An bridge project connecting Ho Chi Minh City with Dong Nai has just completed the first cable-stayed stretch, marking an important milestone in the construction process.

The heart is broken by the scene of a passenger bus recklessly overtaking on National Highway 19 in Gia Lai

|

Gia Lai - The authorities are investigating and handling the act of passenger buses recklessly overtaking on National Highway 19, the section passing through An Khe Pass.

Accelerating the upgrading of National Highway 279 after the National Day holiday

|

Lao Cai - After National Day on September 2, construction activities have been simultaneously deployed at the construction site of the National Highway 999 upgrade project.

Da Nang builds a 225 billion VND intersection, connecting DT.601 with La Son - Tuy Loan Expressway

|

Da Nang - The City People's Committee has approved the project of the section connecting DT.601 to Ho Chi Minh Road, La Son - Tuy Loan section (Hai Van ward).

Bringing excavators to clean up landslides and sand that have overflowed onto the Vinh Hao - Phan Thiet Expressway

|

Lam Dong - On September 3, excavators, dump trucks and workers arrived at the landslide site, overflowing onto the Vinh Hao - Phan Thiet expressway to continue clearing the scene.

Construction started but then unfinished, people have been stuck because of the road for nearly a year

|

Vinh Long - The road under construction has been extended for nearly a year, causing people to have no way to go, the People's Committee of the commune invited relevant parties to fix it and speed up the progress.

Close-up of the sandbank caused by the flow of torn water, overflowing onto the Vinh Hao - Phan Thiet Expressway

|

Lam Dong - Sand and soil from above, following the overflow onto the Vinh Hao - Phan Thiet expressway, caused the road to temporarily stop exploitation for about 2 hours for handling.

Scene of a tragic accident that killed a mother and child on the spot in Ho Chi Minh City

|

HCMC - At noon on September 3, the functional forces of Trung My Tay ward coordinated with the HCMC Police to investigate the accident that caused the mother and child to die on the spot.

Ho Chi Minh City Traffic Police handle more than 9,500 cases of traffic violations during the September 2 holiday

|

HCMC - During the 4 days off for National Day on September 2 (September 30-2, 2025), the traffic safety and order situation in the city is basically stable, without any prolonged congestion.

At midnight, many people moved sand and soil onto the Vinh Hao - Phan Thiet Expressway

|

Lam Dong - By 1:00 a.m. on September 3, the scene of the landslide and sand spilling onto the Vinh Hao - Phan Thiet expressway at km215 had just been cleared for cars to pass.

Car and motorbike arrest accident kills one person on Ho Chi Minh Road

|

Phu Tho - A serious traffic accident between a car and a motorbike on Ho Chi Minh Road caused one person to die on the spot.