Traffic

Clarifying the case of a 2-year-old child lying playing at a gas station being run over and killed by a car

|

Ho Chi Minh City - Professional units of Ho Chi Minh City Police are investigating and clarifying the case of a 2-year-old girl lying playing at a gas station being run over and killed by a car.

Temporarily closing many sections of the North-South expressway to install toll collection systems

|

Quang Tri - North - South Expressway Vung Ang - Cam Lo section is temporarily closed in sections from April 22 - 26 to install long mon platforms, serving the monitoring and toll collection system.

Roadmap for starting urban railway construction in Da Nang in 2027

|

Da Nang - Da Nang City focuses on completing procedures and special mechanisms to start construction of urban railways in February 2027.

Overview of the over 170 billion VND avenue construction site in Lao Cai

|

Lao Cai - Overall images of the Tran Hung Dao Avenue construction site in mid-April show the urgent construction pace, many items gradually appearing.

Driving training vehicles entering highways increase the risk of traffic accidents

|

Trainees driving training vehicles at high speeds on highways while their ability to handle situations is still limited has increased the risk of traffic accidents.

Electric passenger buses officially launched in Nha Trang

|

Khanh Hoa - The locality has agreed on the policy of organizing an electric bus route on the streets of Nha Trang without subsidies from the state budget.

Motorbike crashes into lamp post, young man dies

|

Binh Thuan - Camera recorded the scene of a young man riding a motorbike crashing into a lamppost on the side of Highway 1, causing the motorbike to be destroyed and the man to die.

Clarifying the North-South high-speed railway route

|

At the North-South high-speed railway project, there is a proposal to clarify the route according to the principle of "as straight as possible", especially the section passing through Nam Dinh province.

Bridge over river formed then abandoned for many years in Hanoi

|

Hanoi - L3 Bridge of Ring Road 2.5 (Dam Hong - National Highway 1 section) completed many main items and then left abandoned, exposed to the sun and rain for many years.

Bus driver who ran red light in HCMC suspended from operating

|

HCMC - Regarding the case of a bus driver running a red light in District 1 that caused a stir in public opinion, this person has now been suspended from working for a period of 2 years.

Moment car's front end crushed after collision on Ring Road 2 in Hanoi

|

Hanoi - The front of a 4-seater car was severely damaged after colliding with the elevated median strip of the 2nd Ring Road. Police had to cut the door to get the driver out.

Watch Hanoi Traffic Police handle violations from Zalo reports

|

Upon receiving reports from people via the zalo page "Hanoi Traffic Police Department", this force quickly verified and arrived at the reported location.

Metro Line 1 receives good news before official operation

|

HCMC - The two underground stations Ba Son and City Theater (Metro Line 1) have just been handed over to the investor, ready for official operation in December 2024.

Accident between tanker truck and motorbike in HCMC, 1 person died

|

HCMC - A tanker truck traveling on Phan Van Hon Street towards National Highway 1 (District 12) suddenly collided with a motorbike traveling in the same direction, causing one death.

Minister Luong Tam Quang directs handling of racing situation

|

Minister of Public Security - General Luong Tam Quang has just given instructions to Hanoi City Police regarding the situation of teenagers racing and weaving.

Appearance of Ba Son underground station, Metro line 1, just handed over

|

HCMC - Ba Son underground station of Metro line 1 (Ben Thanh - Suoi Tien) has completed acceptance and handover, marking an important step before official operation.

Constant traffic jams force small businesses to give up their premises

|

HCMC - The constant traffic jams on Xo Viet Nghe Tinh Street have made it impossible for many small businesses to stay, forcing them to give up their premises due to poor business.

Thousands of students excitedly learn about traffic safety

|

Dien Bien - Traffic safety propaganda sessions at schools always attract thousands of students to participate in an exciting and enthusiastic atmosphere.

What items are added to the My Thuan - Can Tho expressway?

|

My Thuan - Can Tho Expressway will be supplemented with additional intersections and residential roads.

More good news about the road project connecting Tay Ho with Son Tay town

|

Hanoi is focusing on clearing the ground to complete the second section and is about to invest in building the fourth section of the 33km-long Tay Thang Long axis road, connecting Tay Ho with Son Tay.