Traffic

Hanoi traffic police use flycams and AI cameras to handle vehicles parked in violation of regulations

|

Hanoi - In addition to patrolling and controlling, the traffic police force combines the use of AI cameras and flycams to handle vehicles parked in violation of regulations.

Tay Ninh Police verify and handle violators after traffic collision

|

Tay Ninh police handle motorcyclists with violations and lack of self-control after traffic collisions.

Promoting the progress of traffic projects in Hanoi

|

On April 19, Chairman of Hanoi People's Committee Vu Dai Thang requested to complete site clearance for road 70 and National Highway 21B projects in the second quarter of 2026.

Increasing fines to 40 million VND, violations of crossing railway barriers still increase

|

Since the beginning of the year, 65 railway accidents have been recorded, Decree 81 increases fines to 40 million VND, but the situation of crossing barriers is still complicated.

Police major dies in accident on Noi Bai - Lao Cai expressway

|

The victim who died in the traffic accident on the Noi Bai - Lao Cai expressway is a police major working at Lao Cai Provincial Police.

Ho Chi Minh City is about to open 2 key bridges connecting District 7 and Nha Be

|

HCMC - Rach Dia and Phuoc Long bridges connecting District 7 and Nha Be district, with a total investment of 1,260 billion VND, will open to traffic in December, helping to reduce traffic congestion in the South of HCMC.

Driver's licenses of 2 Dai Loc Phat concrete mixer truck drivers suspended

|

After the Lao Dong Newspaper's reflection, 2 Dai Loc Phat concrete mixer truck drivers were fined by District 12 Police (HCMC).

People take a 10km detour because Binh Quoi ferry stops operating

|

HCMC - For nearly 4 months, many people in Binh Thanh District and Thu Duc City have had to travel by a detour, more than 10km away, because the Binh Quoi ferry has temporarily stopped operating.

Underpass under railway in Hanoi under construction in new phase

|

Two years since the groundbreaking ceremony, the Hanoi underground railway tunnel project has reached 50% progress and is entering a new phase of construction.

HCMC gateway road before being expanded 4 times

|

HCMC - Tan Thoi Hiep 21 Street, District 12, which is often congested, will soon be widened from 6-7m to 25m, with an investment of more than 1,300 billion VND.

Important milestone of 57km, 6-lane project through Hanoi

|

Hanoi - Many parallel sections of Ring Road 4 have been paved with asphalt, marking an important milestone in the construction of Component Project 2.1.

Yen Bai spends nearly 20 billion to repair vital road

|

Yen Bai - After a long period of degradation, the vital road connecting IC12 intersection to Van Hoi has just received tens of billions of dong in investment for upgrading.

Metro Line 2 in Ho Chi Minh City faces major obstacles before construction begins

|

HCMC - Metro Line 2 has an investment of nearly 47,900 billion VND, expected to start construction in 2025, but faces many obstacles in capital, consulting, site clearance, and infrastructure relocation.

Hot in Saigon: 10,000 billion project is carrying 2,500 billion in loan interest

|

Hot News in Saigon on November 2: A 10,000 billion VND project in Ho Chi Minh City is carrying 2,500 billion VND in loan interest; The expansion of the main road in the west of Ho Chi Minh City is expected to be completed on November 30;...

Potential accidents from broken manholes and unlit roads

|

Hanoi - A 2km long road in Soc Son has no lights, the manhole covers have been repaired but are not in sync with the road surface, posing many potential dangers.

Revealing the pedestrian bridge connecting Metro Station No. 1, operational at the end of the year

|

HCMC - The bridges spanning Vo Nguyen Giap Avenue - Hanoi Highway connecting to Metro Station No. 1 have been completed for synchronous exploitation when the project is in commercial operation.

Hanoi is about to build a 10-lane road with a capital of nearly 1,300 billion VND

|

Hanoi - Dan Phuong District is completing procedures to prepare for construction of the 5.8km Tay Thang Long road, with a capital of nearly 1,300 billion VND.

National Highway 5 is overloaded, Hai Duong proposes to build an elevated road

|

Hai Duong - The Department of Transport of Hai Duong province has just proposed that the Ministry of Transport consider planning and investing in the elevated National Highway 5.

Survey of North-South high-speed railway at Long Thanh airport

|

Dong Nai - The National Assembly's Economic Committee surveyed the investment location for the construction of a high-speed railway on the North-South axis at the Long Thanh airport project site.

Construction of a 112km-long expressway with a capital of nearly VND56,300 billion will begin in 2025

|

The Ring Road 4 Expressway is over 112km long, with a total investment of nearly VND56,300 billion through Hanoi, Hung Yen and Bac Ninh, and is expected to start construction in the second quarter of 2025.