Traffic

Hanoi allows cars and motorbikes to enter the Lang Ha - Giang Vo BRT lane

|

Hanoi - From September 15th, Hanoi will allow cars, motorbikes and other vehicles to circulate in the BRT lane on the Lang Ha - Giang Vo axis to serve the construction of Ring Road 1 overpass.

Investing 37 billion VND to build an additional viaduct and reinforce Mimosa Pass - the gateway to Da Lat

|

Lam Dong - The Ministry of Construction invests about 37 billion VND to build an additional Mimosa Pass overpass, to proactively prevent landslides and ensure traffic safety.

2 central roads in Ho Chi Minh City organize one-way traffic for Metro Line 2 underground station construction

|

Ho Chi Minh City organizes one-way traffic on Cach Mang Thang Tam and Nguyen Thi Minh Khai streets to construct Tao Dan station on Metro Line 2 (Ben Thanh - Tham Luong).

Continuous traffic jams at the roundabout in Ho Chi Minh City on the first day of traffic light operation

|

Ho Chi Minh City - On the first day of piloting traffic lights at the roundabout at Nga 6 Nguyen Thi Minh Khai - Nguyen Van Cu - Ly Thai To, traffic was adjusted flexibly.

Ho Chi Minh City adjusts traffic at the Northwest gateway to construct Metro station No. 2

|

Ho Chi Minh City - From September 16, traffic on Truong Chinh, Tan Ky Tan Quy and Huynh Van Gam streets will be adjusted to construct Ba Queo station.

Red River is dry, ferry terminals paralyzed, people go to the middle of the river to pick up boats

|

Phu Tho - Recently, the water level of the Red River has been depleted, and ferry terminals have had to reinforce their terminals in the middle of the river to be able to pick up and move passengers.

Preparing land to start construction of Ninh Binh - Hai Phong expressway

|

Ninh Binh - The province is focusing on directing the acceleration of site clearance progress to start the Ninh Binh - Hai Phong expressway project, the section passing through the province.

Drivers confused when traffic light signal is faulty

|

Ha Tinh - The traffic light signal was faulty, causing drivers to confused in deciding whether to go or stop, causing prolonged traffic congestion.

Traffic-ides expressway temporary rest stop after 1 month of operation

|

Binh Thuan - The temporary rest stop at Km205 of the Vinh Hao - Phan Thiet expressway is operating stably after exactly 1 month of operation.

Accelerating the construction of a hundred-billion-dong road in the mountainous district of Thai Nguyen

|

The hundred-billion-dong road connecting National Highway 3 with Provincial Road 269B with a total investment of 222 billion VND, implemented in Phu Binh district is about to be completed.

More than 1km of highway in Dong Nai is under construction

|

Dong Nai - More than 1km of Bien Hoa - Vung Tau Expressway (Phuoc Tan Ward, Bien Hoa City) is under construction; very few workers and motorbikes are concentrated at the construction site.

Car and ambulance collide on National Highway 1

|

Quang Binh - Car and ambulance collided on National Highway 1, passing through Dong Hoi City. Fortunately, there were no casualties.

Fault traffic light signal causes confusion for drivers

|

Ha Tinh - Some traffic light locations have just had unusual errors, making it difficult for drivers to decide whether to go or stop for safety.

8-lane road in Hanoi escapes congestion after traffic reorganization

|

Hanoi - After adjusting and reorganizing traffic, the congestion on the Tran Huu Duc - Trinh Van Bo road has cooled down, and vehicles are moving smoothly.

signal lights have been turned off, an intersection in Hanoi has been closed to reduce congestion

|

On the morning of February 24, Hanoi began a pilot of turning off traffic lights and closing the Tran Huu Duc - Nguyen Van Giap intersection (Nam Tu Liem district) to reduce congestion.

Ho Chi Minh City Ring Road 4 creates momentum for development for the entire region's economy

|

After more than a decade of planning, the Ho Chi Minh City Ring Road 4 project is being accelerated, expected to become a strategic transport route, promoting the development of the Southeast, Mekong Delta and Central Highlands.

Provincial roads have a series of potholes, not completely fixed due to low funding

|

Quang Tri - Heavy trucks carrying sand and hotels are constantly circulating, which is one of the reasons for the serious deterioration of Provincial Road 588A.

Ha Tinh coastal road is peeling and deteriorating

|

Ha Tinh - The coastal road Xuan Hoi - Thach Khe - Vung Ang currently has many peeling, heavily degraded locations, making it unsafe for vehicles to travel.

2 motorbikes face off on National Highway 28, 1 dead, 2 in critical condition

|

Binh Thuan - Two motorbikes collided on National Highway 28, killing 1 young man and causing 2 people to be in critical condition.

Tractor-trailer collision at Vung Tau intersection, 1 woman died

|

Dong Nai - The authorities are verifying the cause of the traffic accident that killed a woman riding an electric bicycle at Vung Tau intersection.