Traffic

Long Thanh Bridge is bustling with construction, accelerating the expansion of the expressway connecting Long Thanh airport

|

After more than two months of construction, the Ho Chi Minh City - Long Thanh expressway expansion project is accelerating construction, in which Long Thanh bridge is considered a key item.

Metro No. 1 passengers are about to take elevators to 7 elevated stations

|

HCMC - 8 elevators are installed at 7 pedestrian overpasses along Metro Line 1, making it easy for passengers to access elevated stations.

Lam Dong provincial leaders directly inspect and direct relief for people in flooded areas

|

Lam Dong - Provincial leaders directly inspected, directed the recovery of flood consequences and visited and encouraged people isolated by floods.

Following the direction of the Chairman of Ho Chi Minh City, the dead end in the center is about to be expanded and connected

|

Ho Chi Minh City is preparing to allocate about 1,073 billion VND to widen Tran Binh Trong Street (from Ly Thai To Street to Hung Vuong) from 5 m to 17 m.

Hung Yen starts construction of a road worth over VND4,900 billion connecting Thai Binh - Pho Hien

|

Hung Yen - On the morning of October 31, Hung Yen province started construction of the road connecting Thai Binh ward with Pho Hien ward, a project worth more than VND4,900 billion, nearly 25 km long.

Infrastructure is upgraded synchronously, Ho Chi Minh City residents are happy to reduce flooding and congestion

|

HCMC - Along with the expansion and upgrading of Phu Dinh Bridge, a number of roads and alleys in the area have also been upgraded, helping to reduce flooding and congestion.

National Highway 279 construction is sluggish, with potential traffic accidents

|

The project to upgrade National Highway 279 connecting Lai Chau with IC16 intersection (Noi Bai - Lao Cai Expressway) has been under construction for many years, posing a potential risk to traffic safety.

Request to completely fix more than 200 technical errors at Nhon - Hanoi Railway Station

|

After nearly a year of operation, the Nhon - Hanoi Railway Station metro line still has 218 technical errors, Hanoi Metro requested to completely fix them in August.

Hanoi - Dong Hoi high-quality railway opens

|

From August 10, the railway industry put into operation the high-quality tourist train on the Hanoi - Dong Hoi route.

Explaining the reason for the delay in the billion-dollar road connecting Lao Cai - Lai Chau

|

Lao Cai - Up to now, the billion-dollar road under the project connecting traffic in the northern mountainous region is still unfinished and not completed.

HCMC proposes to establish a belt to limit gasoline and oil vehicles from the center from 2026

|

Ho Chi Minh City proposes to set up a belt in the center from 2026 to limit the circulation of gasoline and oil vehicles, prioritizing vehicles using clean energy and environmentally friendly.

Current status of overload on Ho Chi Minh City - Long Thanh - Dau Giay Expressway before the start of expansion

|

HCMC - The long traffic jam on the HCMC - Long Thanh - Dau Giay Expressway will soon be resolved when the expansion project officially starts construction on August 19.

HCMC is about to build an elevated road longer than 3km, 4 - 6 lanes wide, connecting directly the center with the South

|

Ho Chi Minh City is preparing to implement the Binh Tien bridge project - an elevated road over 3km long, 4 - 6 lanes wide, directly connecting the central area with the southern part of the city.

Hanoi pilots electric bus route to serve visitors to the central area

|

Hanoi piloted an electric bus route to serve people and tourists visiting tourist attractions in the central area of the capital.

12 billion VND to build a bridge connecting 300 households in Lao Cai border commune

|

Lao Cai - After being swept away by floodwaters twice, Sim San bridge in the border commune of Y Ty will be rebuilt.

Hot Saigon: Binh Goi Bridge project worth nearly 600 billion VND has reached 74.4% of the volume

|

Hot Saigon 7.8: The Binh Goi bridge project worth nearly 600 billion VND has reached 74.4% of the volume; Tomorrow, the results of additional admission to grade 10 in Ho Chi Minh City will be announced;...

A trillion-dong plan to build an elevated road along National Highway 51 to solve traffic congestion in Dong Nai

|

Dong Nai - The elevated road project along National Highway 51 from Vung Tau intersection to Vo Nguyen Giap Street, the 5.5 km long Bien Hoa - Vung Tau Expressway.

Scene of the fatal accident between a truck and a motorbike in Hue

|

HUE - The accident between a motorbike and a truck on National Highway 1 through Chan May - Lang Co commune caused a woman to die on the spot.

Cao Bang province is busy with 2 strategic expressway projects passing through the area

|

Cao Bang - The locality and investors are speeding up the progress of the work, building the expressway on schedule.

Complete and open route 2 connecting Long Thanh airport before September 2

|

Dong Nai - Route No. 2 under package 6.12 for the construction of the traffic system connecting Long Thanh airport is expected to open to traffic before September 2