Traffic

Opening an inter-port road more than 15 km long to take advantage of Long Thanh airport

|

Dong Nai - Nhon Trach inter-port road more than 15 km long connecting the industrial park to the seaport, taking advantage of Long Thanh airport.

Female truck driver fined 33 million VND for carrying goods like "circus

|

Hanoi - A truck carrying goods without binding, license plate obscured when traveling on the road. The driver was fined 33 million VND.

Railway over Hai Van Pass has an incident, passengers must be transferred by car

|

The railway through Hai Van Pass is temporarily interrupted after the freight train derailment incident. The railway industry has to organize passenger transit by car through the pass.

Hanoi launches civilized construction on buses and trains

|

Hanoi launches a civilized public passenger transport movement on buses and trains to attract people to use public transport.

Trillion-VND coastal road through Thanh Hoa is behind schedule

|

The coastal road through Thanh Hoa province is nearly 100km long, with a total investment of trillions of VND, and has been implemented for many years. However, many sections have not been completed, or even constructed, greatly affecting people's travel and lives.

Ho Chi Minh City today: Building a new administrative center in Thu Thiem

|

Ho Chi Minh City builds a new administrative center for 7,000 officials in Thu Thiem; Gardeners in Ho Chi Minh City are busy taking care of flowers to prepare for Tet 2026...

Dong Nai upgrades more than 9km of road connecting Ho Chi Minh City with Long Thanh airport

|

Dong Nai is upgrading more than 9km of 25B road from the center of Nhon Trach commune to National Highway 51 connecting traffic from Long Thanh airport to Ho Chi Minh City.

Traffic police do not check driver's health certificate

|

The Traffic Police Department affirmed that the task force did not check the health certificate of the vehicle driver.

It's a bit of a bit of a bit of a bit of a bit of a bit.

Two overpasses across 3 roads in Ho Chi Minh City have taken shape

|

Ho Chi Minh City - On January 7, the overpass across National Highway 13 and Nguyen Thi Minh Khai street has completed beam installation, and the overpass has entered the completion phase.

Hai Phong starts construction of National Highway 5 - National Highway 10 connecting road in the second quarter

|

Hai Phong - On January 7, Secretary of the City Party Committee Le Tien Chau and the delegation surveyed the reality of key traffic points, where congestion often occurs.

It's a bit of a bit of a bit of a bit of a bit of a bit.

People easily pay remote fines via iHanoi

|

Hanoi - With iHanoi, traffic violators can look up, confirm and pay remote fines completely online, without going to the police agency.

Hanoi to build another 655m long, 6-lane underpass in the inner city

|

Hanoi will build a direct underpass in the direction of Me Tri - Duong Dinh Nghe with a length of 655m, a scale of 6 lanes belonging to Tu Liem, Cau Giay and Yen Hoa wards.

Serious landslide on National Highway 2, still messy after 3 months

|

The location of serious landslides on National Highway 2 due to the impact of storm No. 10 is still messy, while this is a vital traffic route of Tuyen Quang province.

When will the bottleneck on provincial road 624 Quang Ngai be removed

|

Quang Ngai - More than 350m of "bottleneck" on provincial road 624 causes traffic through Nghia Hanh to be congested every day, Ben Da bridge is narrow, degraded, and poses a risk of accidents.

Opening a road through 2 communes in Dong Nai province to connect Long Thanh airport

|

Dong Nai - The project to open road 25C from National Highway 51 to Huong Lo 19 connecting Long Thanh airport through Phuoc An and Long Phuoc communes is 2.65 km long.

There will be a notice on the roadmap for prohibiting and sanctioning vehicles entering low-emission zones in Hanoi

|

Hanoi - Before the pilot low-emission area on July 1, 2026, there will be a specific announcement to avoid cases where people do not grasp the information.

Ho Chi Minh City prepares to build a large-scale 4-story intersection in the East area

|

Ho Chi Minh City is examining the architecture of Go Cong intersection on a scale of 4 floors on Ring Road 3 in Ho Chi Minh City, to choose the optimal option.

Ferry wharf stops operating, Long Khanh islanders face many difficulties

|

An Giang - Ferry terminal No. 2 stopped operating from the beginning of 2026, causing great difficulties for people in Long Khanh islet.

Long Thanh airport has 8 connecting transportation projects in Dong Nai being implemented

|

Dong Nai - Long Thanh Airport through the province has 8 projects being implemented.

Ho Chi Minh City bans car lanes on Le Loi street for 1 week

|

Ho Chi Minh City - Le Loi street (Saigon ward) will be banned from traffic for many days to serve the Technology Exhibition and music program.