Traffic

The 20-year-old bottleneck at the Northwest gateway of Ho Chi Minh City waiting to widen the road and build an underpass

|

HCMC - For 20 years, the Truong Chinh - Tan Ky Tan Quy intersection has been a bottleneck that has caused traffic congestion at the Northwest gateway, but projects to expand roads and build underpasses have been delayed.

HCMC on November 1: Body of girl found in trunk of a car parked on the side of the road

|

HCMC - Metro No. 1 passengers are about to take an elevator to 7 elevated stations; Police investigate the decomposed body of a girl in the trunk of a car parked on the side of the road...

Hanoi promotes green transformation of public transport

|

Hanoi - Pioneering in controlling emissions and converting to green public transport for "Clean Air for Green Sky".

National Highway 1 in Lam Dong has been opened to traffic after 24 hours of being deeply flooded

|

Lam Dong - National Highway 1, Ben Loi Bridge section, has been reopened to traffic after a day of being deeply flooded, making it impossible for vehicles to pass.

slopes on the La Son - Tuy Loan Expressway are threatened by landslides

|

HUE - Many mountains on both sides of the La Son - Tuy Loan Expressway have landslides after heavy rain, thousands of cubic meters of rock and soil have spilled onto the road, and the slopes are under threat.

Dong Thap Police work with female driver driving a car in the wrong direction on National Highway N2B

|

Dong Thap - Traffic police have drawn up a record of handling the female driver driving a car in the wrong direction, and may be fined up to 20 million VND.

Hanoi is about to have a new 6.5km long, 8-lane road

|

Hanoi - The newly built route is about 6.5km long, starting at the planned route 70, ending at the intersection with Ring Road 4.

Driver fined for not wearing a seat belt

|

HCMC - Many drivers were fined by the traffic police on August 5 for not wearing seat belts.

Construction of Ba Bau overpass, National Highway 1 is narrowed with 1 traffic lane on each side

|

Lam Dong - At Ba Bau intersection, the gateway to the expressway is being fenced off to construct an overpass. Because there is only 1 lane on each side, drivers need to pay attention when traveling.

Workers " sunlight" to the peak, racing to progress the Ring Road 4 project in the Capital region

|

Hanoi - Under the harsh heat, workers are still actively constructing the Ring Road 4 parallel road project, completing the project as soon as possible, ensuring quality.

The bridge connecting the two old districts in Ho Chi Minh City has been expanded, people are excited because it escapes congestion

|

HCMC - The Phu Dinh Bridge connecting the old District 6 and District 8 in HCMC has been expanded, and a new traffic diversion is needed to help people escape traffic jams during rush hour.

Lam Dong establishes Land Fund Development Center, accelerates site clearance

|

Lam Dong - The Provincial Land Fund Development Center and 2 affiliated branches have just been established, contributing to accelerating site clearance for projects.

Passenger car driver drove into the emergency lane, crossing the car over Phan Thiet - Dau Giay Expressway

|

Lam Dong - The clip recorded a sleeper bus running into the emergency lane and then crossing the car to change lane on the Phan Thiet - Dau Giay Expressway.

HCMC temporarily stops collecting road and sidewalk fees, people hope to soon have new regulations

|

Ho Chi Minh City temporarily stops collecting fees for using sidewalks and roads for business, many traders hope to soon have new regulations to stabilize business.

After only 3 days of temporary traffic, Dai Ngai 2 bridge temporarily stopped for traffic

|

Can Tho - The temporary storage of vehicles across Dai Ngai 2 Bridge will be temporarily suspended until the completion of traffic opening procedures according to regulations.

Hanoi Railway No. 2 is ready to start construction in October 2025

|

The Nam Thang Long - Tran Hung Dao urban railway line 2 is expected to start construction in October 2025. The units are urgently completing documents, site clearance and preparing design, with the goal of completing the entire route by 2030.

Construction of 2 direct overpasses on Hanoi Ring Road 1

|

Hanoi - The two direct overpasses at the Nguyen Chi Thanh and Lang Ha intersections are important items of the Ring Road 1 project, Hoang Cau - Voi Phuc section.

Chau Doc - Can Tho - Soc Trang Expressway still lacks nearly 7 million m3 of sand

|

Can Tho - The Chau Doc - Can Tho - Soc Trang expressway project, the section through Can Tho city, has reached more than 41.5% of the volume but is still behind schedule due to a shortage of nearly 7 million m3 of sand.

Hot Saigon: Binh Chuan intersection of Ho Chi Minh City Ring Road 3 project after 2 years of construction

|

Hot Saigon 3.8: Binh Chuan intersection of Ho Chi Minh City Ring Road 3 project after 2 years of construction; Scene of a factory of nearly 12,000 m2 burned down in a fire in Tay Ninh;...

The East-West axis road will be completed after 4 years, connecting throughout the East of Ho Chi Minh City

|

HCMC The East-West main road has been completed and is expected to open to traffic in August, connecting National Highway 1K with Hanoi Highway.