Traffic

Spending nearly 24 billion VND to repair more than 5 km of road connecting Lang Son - Quang Ninh

|

Lang Son - More than 5 km of National Highway 4B through Loc Binh commune will have its foundation and road surface repaired, and additional drainage and traffic safety systems added.

Lam Dong signs traffic safety commitment with 108 tractor truck owners

|

Lam Dong - The Traffic Police force has just organized propaganda, reflective stickers and mobilized 108 tractor truck owners to sign commitments to ensure traffic safety.

Road congestion leading to the bridge in Da Nang, people face difficulties when traveling

|

Da Nang - Technical opening to traffic from the end of March 2025, but Quang Da bridge has not yet been able to operate due to congestion on the access road. Local people are worried about traffic unsafety.

Hanoi adjusts traffic at Lang Ha - Giang Vo intersection from June 12

|

Hanoi - From 10 PM on June 12, traffic organization at Lang Ha - Giang Vo - La Thanh intersection will be adjusted to serve the construction of the overpass under the Ring Road 1 project.

From June 10-11, AI cameras detected 69 violations at a traffic junction in Hanoi

|

AI cameras of the Traffic Police Department have detected 69 traffic violations at a traffic intersection in Hanoi, mainly acts of not wearing helmets and running red lights.

Investing 114 billion VND for 2 projects serving industrial clusters in Phu Tho

|

Phu Tho - Phong Chau Ward is implementing 2 projects on transportation and resettlement serving Phu Ho industrial cluster, with a total investment of nearly 114 billion VND for 2 projects.

Busy before the rainy season at the Noi Bai - Lao Cai expressway expansion site

|

Lao Cai - Thousands of engineers and workers are busy constructing the Noi Bai - Lao Cai expressway expansion project.

Early morning accident in Da Nang, 1 dead, 3 injured

|

Da Nang - 1 dead, 3 injured after a traffic accident between a truck and a car, two vehicles heavily damaged.

Lam Dong Police conduct a general review of nearly 1,300 trucks and dump trucks

|

Lam Dong - The Provincial Police force is coordinating to review nearly 1,300 trucks and dump trucks to rectify and handle related violations.

Temporarily detaining and fining more than 100 million VND for a tractor-trailer violating regulations on the expressway

|

Lam Dong - A tractor-trailer without 3 types of papers and carrying goods exceeding height on the expressway was recorded and the vehicle was temporarily seized.

Dong Nai sets date for compensation payment for Ring Road 4 HCMC project

|

Dong Nai promulgates a 100-day and night compensation and site clearance plan for the Ring Road 4 project in Ho Chi Minh City in 9 communes.

Car crossing railway hit by cargo train, 3 people injured

|

Lam Dong - A car carrying 4 people crossing the railway at a self-opened level crossing collided with a cargo train, injuring 3 people.

Accelerate the construction of the final intersection on the 34 trillion VND expressway

|

Despite the lack of materials, construction units are still making efforts to accelerate the progress of the Tri Binh - Dung Quat intersection, the last intersection on the Da Nang - Quang Ngai expressway.

Collision with a crane-mounted car at a crossroads, a man dies on the spot

|

Gia Lai - Collision with a crane-mounted car while traveling through an intersection on coastal road DT639, Cat Tien - De Gi section, a man riding a motorbike died on the spot.

Investigating the case of a man dying on the street in Ho Chi Minh City

|

Ho Chi Minh City - April 5, units under the Ho Chi Minh City Police are investigating and clarifying the case of a man dying on the street in Di An ward.

Heart-stopping scene of motorbike driver escaping danger right in front of a train

|

Camera records the scene of a motorbike crossing the railway, escaping danger by a hair's breadth in front of a train.

AI cameras "don't sleep", quietly contributing to changing Hanoi street order

|

Hanoi - AI camera system operating 24/24, comprehensive monitoring, remote violation detection, remote fine support, contributing to tightening urban traffic discipline.

Nearly 5,000 billion VND coastal road in Nghe An is about to be thông tuyến (opened), with a "knot" of 100m

|

Nghe An - The 67.5km long coastal road of Nghe An is basically completed, only 100m of Nghi Tan bridgehead is waiting for weak foundation treatment before reaching the finish line in May 2026.

AI cameras in Hanoi put parking violations under 24/24h control

|

Hanoi - AI camera system continuously records 24/24h violations of parking and stopping. Automatically collects and extracts license plates to serve remote fine verification.

Vietnam's highest vertical cable-stayed bridge accelerates to wait for assembly after nearly 11 years

|

Ho Chi Minh City - Phuoc Khanh bridge (belonging to Ben Luc - Long Thanh expressway) has reached about 96% of the volume, and is focusing all efforts on construction waiting for completion in May 2026.