North-South Railway
Ghenh bridge repaired, North-South railway line resumes operation
|
Dong Nai - After a period of urgently overcoming the barge collision incident, Ghenh bridge has been repaired and the North-South railway line has been restored to operation since the morning of March 11.
Ferry collision with Ghenh bridge in Dong Nai: Proposal for consideration and prosecution
|
Dong Nai - In the barge collision with Ghenh bridge, the Vietnam Railways Department has a document proposing consideration and prosecution if violating regulations on waterway transport.
The barge hit the 2nd span, causing serious damage to the structure of Ghenh bridge
|
Dong Nai - A barge hit the 2nd span of the bridge, causing severe damage to the structure of Ghenh bridge, posing a serious risk to the safety of the project and train operations.
Barge crashes into Ghenh bridge: North-South railway paralyzed, urgently transfer passengers by car
|
Dong Nai - A barge collides with a railway and road bridge (Ghenh bridge), causing the North-South railway line to be interrupted, and a car transfer plan must be considered.
3 resettlement areas in Dong Nai serve the North-South high-speed railway project
|
Dong Nai - Provincial People's Committee builds and arranges resettlement areas for people whose land is recovered when implementing the North-South high-speed railway project.
Prime Minister sets deadline for reporting on high-speed railway technology and investment forms
|
Prime Minister Pham Minh Chinh requested to urgently propose technology selection and investment forms for the North-South high-speed railway.
Hundreds of workers worked day and night to overcome landslides on the North-South railway after storms
|
Dak Lak - Storm No. 13 caused damage when the North-South railway section through Xuan Lanh commune was eroded, completely paralyzing the train operations in this area.
Landslide damages North-South railway through Quang Tri
|
Quang Tri - A landslide occurred at km 458+200 near Lac Son station (Tuyen Hoa commune), causing the North-South railway section to be skewed and temporarily blocked.
Lighting up the Vung Ro railway tunnels
|
Khanh Hoa - 4 tunnels of the Hanoi-Ho Chi Minh City railway line in the Deo Ca area have now been lit up thanks to the solar power system.
HCMC will relocate 61 households to build the North-South high-speed railway
|
Ho Chi Minh City plans to relocate 61 households to implement the North-South high-speed railway construction project, stretching 13.64 km through the city.
Voters hope the North-South railway will extend to Ca Mau
|
Ca Mau - That is the desire of many voters in this area because the complete road transportation system creates a great opportunity for Ca Mau to develop.
Anti-corruption mechanism for North-South high-speed railway
|
When selecting a contractor for the North-South high-speed railway project, there must be representatives from the Ministry of National Defense, the Ministry of Public Security, the Inspectorate, and the Auditor.
Avoid capital increase when implementing North-South high-speed railway
|
The Government Standing Committee requested to limit the total investment exceeding due to subjective factors and avoid capital increase when implementing the North-South high-speed railway.
Prime Minister chairs meeting on North-South high-speed railway
|
The Prime Minister emphasized that the North-South high-speed railway and railway projects connecting with China are of great significance to the development of our country.
Proposal to build railway lines connecting China
|
The Government has submitted to competent authorities the policy of building a North-South high-speed railway and railway lines connecting with China.