Society
Happiness, bravery and aspiration to rise up of Vietnam
|
In the context of a volatile world, Vietnam is emerging as a bright spot for stability and development. The assessments and perceptions of ambassadors, heads of international organizations and diplomats during their term of office in Vietnam show a society rich in vital energy, a country that is strongly transforming its development strategy with a unique development model with global reference value.
To make Long Thanh airport ready for takeoff
|
The Long Thanh airport project is expected to be put into commercial operation in the fourth quarter of 2026, connecting traffic routes are being urgently constructed for synchronous operation, bringing the airport to take off.
More than 2,100 people still violate alcohol concentration on the first day of the holiday
|
In addition to recording a decrease in traffic accidents on the April 30 holiday in all 3 criteria, the Traffic Police force handled more than 2,100 people who violated alcohol concentration.
Violating alcohol concentration on the night of April 30, many drivers in Hanoi were fined 19 million VND
|
Hanoi - On the night of April 30, traffic police (CSGT) simultaneously checked alcohol concentration, discovering many violating car and motorbike drivers.
Male body found in river in Lam Dong
|
Lam Dong - A male body of unknown origin was found floating on the Dinh River by people.
Many households in Bao Loc mountain town are deeply submerged in water
|
Lam Dong – Dozens of households in Bao Loc city were submerged in water after prolonged heavy rain.
Hue reviews plans to evacuate people and respond to heavy rain
|
HUE - Hue reviews plans for evacuation of people, plans for natural disaster response, and slope areas at risk of landslides during heavy rains, flash floods, and inundation due to heavy rain.
Hot in Saigon: Many problems delay the progress of Metro Line 2
|
Hot News Saigon November 3: Many issues delay the progress of Metro Line 2; A district in Binh Duong will open 6 industrial parks covering 4,170 hectares;...
Rain combined with high tide, roads in Ho Chi Minh City flooded deeply
|
HCMC - Heavy rain combined with high tides turned Tran Xuan Soan Street into a river, making it difficult for people to travel.
Ho Chi Minh City sets milestone for opening 13km of 4-lane elevated road in Thu Duc
|
HCMC – The 13km-long, 4-lane elevated road through Thu Duc City (part of Ho Chi Minh City's Ring Road 3) is targeted to open to traffic on January 30, 2026.
Ownerless ship drifts near Ly Son island, Quang Ngai province
|
Quang Ngai - Discovering an abandoned boat drifting into the sea more than 30 nautical miles from Ly Son Island, fishermen towed the boat back to the island and reported it to the police.
Body found stuck in breakwater on Phu Quy island
|
Binh Thuan - A body was found stuck in a breakwater on Phu Quy Island, suspected to be that of a male tourist who went missing while SUPing 9 days ago.
Strong cold front to cause dangerous weather in East Sea
|
The meteorological agency said that strong cold air continues to affect the weather in the Gulf of Tonkin and the North East Sea.
Building a fence for Long Thanh airport with a scope of 5,000 hectares
|
Dong Nai - On November 3, Vietnam Airports Corporation (ACV) announced that it had started construction of the 5,000-hectare fence of Long Thanh airport (package 2.10).
Heavy rain, Bac Lieu city flooded many places
|
Bac Lieu - Bac Lieu city was flooded in many places after a heavy rain that was considered rare.
Watching farmers in the West harvest their crops during the flood season is a delight
|
Mekong Delta - With many years of experience, people in the upstream area have used concentrated fishing gear such as bottom fishing to harvest fish during the flood season.
Ho Chi Minh City is about to open 2 key bridges connecting District 7 and Nha Be
|
HCMC - Rach Dia and Phuoc Long bridges connecting District 7 and Nha Be district, with a total investment of 1,260 billion VND, will open to traffic in December, helping to reduce traffic congestion in the South of HCMC.
Only urban areas with 500,000 people or more have high-speed railway stations
|
Many issues related to the North-South High-Speed Railway Project were answered at a working session in Khanh Hoa.
Money available, 460 billion VND project in Quang Ngai still stagnant
|
The fact that many households have not received compensation has caused the progress of the project to upgrade and expand Tinh Hoa fishing port, Quang Ngai city to stagnate.
People learn a trade to preserve culture and improve the economy
|
Dak Nong - Many people in Dak Glong district have been wanting to learn brocade weaving to preserve ethnic culture and improve their family economy.