Traffic

Cars congested at the Phan Thiet - Dau Giay expressway exit due to technical errors at the toll station

|

Lam Dong - Technical incident at the Phan Thiet intersection toll station on the Phan Thiet - Dau Giay expressway caused prolonged traffic jams.

Hanoi general sanitation of transport infrastructure, urban embellishment before election day

|

Hanoi generally cleans traffic infrastructure, embellishes green trees, lighting and urban landscape to ensure aesthetics and safety to serve elections.

Technical opening of Hieu Liem bridge across the Dong Nai River on April 30th

|

Dong Nai - Hieu Liem Bridge across the Dong Nai River, the section of Tri An commune, is planned to be technically opened to traffic on April 30th.

Car collides with motorbike on National Highway 3, one person seriously injured

|

Thai Nguyen - An accident occurred between a motorbike and a car on National Highway 3, seriously injuring one person.

Improving people's travel experience

|

Over the past time, Hanoi has promoted the conversion of electric buses in the public passenger transport system. This is considered a "double arrow" when it both contributes to reducing environmental pollution and improving the service quality and travel experience of people.

Crossing the railway, truck hit by train and thrown nearly 100m

|

Hanoi - Train SE3 collided with a truck at a level crossing through Ngoc Hoi commune, causing heavy damage to the locomotive and affecting railway traffic.

Da Nang transportation businesses must change routes to Da Lat

|

Da Nang - The Department of Construction requests hundreds of transport businesses to adjust traffic plans to suit the new traffic organization plan in Da Lat.

Ho Chi Minh City spends 3,563 billion VND to open a 40m wide, 6-lane road at the Northwest gateway

|

Ho Chi Minh City - The Thoi An - Thanh Xuan inter-ward road project is nearly 4.5 km long, 40 m wide with 6 lanes, with a total capital of more than 3,563 billion VND, expected to reduce the load on the Northwest gateway.

8 PM News: Hanoi promotes expressway project worth more than 5,200 billion VND

|

Finalizing the time to complete site clearance for the 120-180m wide road project in Hanoi; The longest canal renovation project in Ho Chi Minh City is deserted of workers, machinery is lying idle...

Pho Hien - Hung Ha road officially decided on investment policy

|

Hung Yen - The Provincial People's Council has approved the adjustment of the Provincial Plan and decided on the investment policy for the Pho Hien - Hung Ha road.

Vietnam Airlines announces temporary suspension of flights near Da Lat from March 2026

|

Vietnam Airlines will temporarily suspend all flights to and from Lien Khuong airport, near Da Lat from March 2026.

Saigon Hot News: 9,000 billion VND project behind schedule, no workers

|

Ho Chi Minh City adjusts Metro Line No. 7 through the new Thu Thiem administrative center; Snakehead fish flock to Binh Dien market in front of the God of Wealth... are Saigon Hot News No. 25. 2.

Road 917, 918 projects in Can Tho are being constructed halfway due to lack of land

|

Can Tho - Many traffic projects in Can Tho are behind schedule due to site clearance, lack of resettlement land and unsynchronized handover of land.

Ho Chi Minh City today: Proposal to invest in a Saigon riverside avenue of more than 78 km, combined with railway

|

Ho Chi Minh City has 9 more VinBus electric bus routes from March 1st; Proposal to build a Saigon riverside avenue more than 78 km long, integrating light rail...

Ho Chi Minh City has 9 more VinBus electric bus routes from March 1st

|

Ho Chi Minh City - From March 1st, Ho Chi Minh City will have 9 more electric bus routes operated by VinBus with 169 vehicles of 30 and 60 seats.

Overtime, shortening progress on expressway projects in Ninh Binh

|

After Binh Ngo Tet 2026, expressway projects in Ninh Binh will increase shifts, mobilize maximum manpower - machinery, accelerate progress, and are determined to shorten completion time.

National Highway 13 in Ho Chi Minh City has the first section expanded from 6 to 8 lanes

|

HCMC - After a period of construction, the first section on National Highway 13 through the gateway to HCMC has been expanded to 8 lanes, contributing to reducing congestion and increasing regional connectivity.

Proposal to build a Saigon riverside avenue more than 78 km long, integrating light rail

|

Ho Chi Minh City - The Saigon riverside avenue, more than 78 km long, 8 - 10 lanes wide, along with a light/ground-based railway line along the river corridor, has just been proposed for investment.

Da Nang rectifies passenger transport after Thac Ba accident

|

Da Nang - Department of Construction requests tightening transport safety after waterway tragedy at Thac Ba Lake.

Hanoi traffic police promptly take critically ill patients to the emergency room

|

Hanoi - While on duty, traffic police promptly used specialized vehicles to bring people to Bach Mai Hospital for safe emergency treatment.