Traffic
From June 10-11, AI cameras detected 69 violations at a traffic junction in Hanoi
|
AI cameras of the Traffic Police Department have detected 69 traffic violations at a traffic intersection in Hanoi, mainly acts of not wearing helmets and running red lights.
Reinforcing landslide risk points on Dai Ninh Pass
|
Lam Dong - Faced with the risk of landslides in the rainy season, units are reinforcing locations at risk of landslides on National Highway 28B through Dai Ninh Pass.
Removing problems with the Khanh Hoa - Buon Ma Thuot expressway
|
The Khanh Hoa - Buon Ma Thuot expressway has reached nearly 97% of the volume, but still needs to remove site obstacles to reach the finish line on schedule.
Preventing illegal UAVs at airports, preventing the recurrence of incidents threatening flight safety
|
After the continuous UAV intrusion into the airport area, the Ministry of Construction requested the synchronous deployment of measures to prevent and strictly handle violations.
Traffic accident on Bao Loc bypass, young man dies on the spot
|
Lam Dong - A traffic accident occurred on the southern Bao Loc bypass at dawn, killing a young man driving a motorbike on the spot.
Construction under the Red River, Tran Hung Dao bridge faces many challenges
|
Hanoi - Construction under the Red River with many specific conditions, the Tran Hung Dao bridge project is facing great pressure on weather, materials and progress.
Notes when moving, parking cars for long periods under intense heat
|
The following technical recommendations will help car drivers proactively protect their cars and move safely on hot sunny days.
Behind the million-view videos of Hanoi Traffic Police
|
Hanoi - Few people know that traffic propaganda videos that are attracting millions of views are all conceived and produced by Hanoi traffic police officers and soldiers themselves.
Hot sun heating the road surface, a series of tires burst on the expressway through the Central region
|
Gia Lai - Intense heat caused a series of vehicles to have tires burst and engine failures on the Quang Ngai - Hoai Nhon - Quy Nhon - Chi Thanh - Van Phong expressway.
Hanoi consults on project to extend Cat Linh - Ha Dong metro to Xuan Mai
|
Hanoi is preparing to consult on the project to extend the Cat Linh - Ha Dong metro line to Xuan Mai, about 20km long, with a total estimated investment of more than 1.5 billion USD.
Allocate 90 billion VND to construct and rescue the southern bypass of Bao Loc that is seriously damaged
|
Lam Dong - After more than 5 years of suspension of construction, the southern Bao Loc bypass route is allocated 90 billion VND to overcome landslides and continue to complete the project.
Hanoi Traffic Police innovate traffic propaganda methods
|
Propaganda clips reaching millions of views on social networks in just a few hours of posting, Hanoi traffic police are promoting the effectiveness of propaganda work in cyberspace.
New shape of Xuyen Tam canal after many years of pollution
|
Ho Chi Minh City - After decades of pollution, people are excited to see Xuyen Tam canal being renovated, embankments and infrastructure gradually forming.
Roads at the gateway to Ho Chi Minh City are about to be expanded 4 times
|
Ho Chi Minh City - Living next to Nguyen Duy Trinh street for many years, people have witnessed many accidents, so they hope the expansion project will be implemented soon to ensure travel safety.
National Highway 13 is about to expand to 12 - 14 lanes, Ho Chi Minh City completes clearance before July 31
|
Ho Chi Minh City - National Highway 13 (from Binh Trieu bridge to Vinh Binh bridge) will be expanded to 12 - 14 lanes, the city requires completing the clearance of more than 1,000 households before July 31.
Hanoi restores traffic on Long Bien bridge from May 28
|
Hanoi restored two-way traffic on Long Bien bridge from May 28 after completing the repair of the road section.
3,500 billion VND transportation project in Quang Ngai entangled with site clearance
|
Quang Ngai - The Hoang Sa - Doc Soi road project worth 3,500 billion VND is accelerating construction, but is still facing site clearance issues, affecting progress.
Progress of the nearly 1,000 billion VND road project at the gateway to Hanoi
|
The road project connecting Luong Son town, now Luong Son commune, Phu Tho with Xuan Mai (Hanoi) is being constructed intermittently because many locations have not been handed over land.
Project progress of over VND 1,800 billion to upgrade National Highway 14E
|
The National Highway 14E upgrade project worth more than 1,800 billion VND has reached about 75%, but site clearance is still a "bottleneck" affecting progress.
Long Thanh intersection to connect Bien Hoa - Vung Tau expressway to be fully opened soon
|
Dong Nai - The entire Long Thanh intersection connecting the HCMC - Long Thanh - Dau Giay expressway with the Bien Hoa - Vung Tau expressway will be put into operation at the end of May.