Traffic
Two billion-dollar bridges across major rivers in Hanoi are facing obstacles, and the completion progress must be delayed
|
Hanoi - The completion of the road and railway bridge across the Duong River is delayed to 2026 due to the slow handover of most of the site.
Opening mechanisms, activating resources for the North-South high-speed railway project
|
The North-South high-speed railway project needs to soon complete the legal corridor to mobilize diverse investment resources, instead of only depending on public investment capital.
After the historic flood, the billion-dollar project on National Highway 3 has just been completed and is damaged
|
Thai Nguyen - The historic flood in October that made the project worth more than 31 billion VND on National Highway 3 completed was peeling and eroded, posing a potential risk of insecurity.
DT601 route has many cracks appearing after prolonged heavy rain in Da Nang
|
Da Nang - DT601 road through Hai Van ward has many long subsidence sections, causing danger to traffic participants.
Truck crashed into many vehicles and fled in Hanoi
|
Hanoi - A series of accidents occurred on the evening of November 5 on Hoang Mai Street (Hoang Mai Ward).
Urgently handle the traffic accident that killed 6 people on National Highway 6
|
On February 22, the Director of Son La Provincial Police, along with the authorities, visited and encouraged the family of the victim of the 6-man traffic accident on National Highway 6.
On the way to transport the victim who died in an accident, the ambulance had another accident
|
Nghe An - An ambulance suddenly had an accident while on its way carrying the body of a female student who died in an accident and returned home.
Another serious traffic jam on Khuat Duy Tien Street, Nguyen Xien
|
Hanoi - Although it is a weekend and not rush hour, Nguyen Xien and Khuat Duy Tien streets are still seriously congested, making it difficult for people to travel.
Ha Giang informs about granting and exchanging driving licenses
|
The work of issuing and exchanging driving licenses (GPLX) in Ha Giang will continue to be carried out by the Department of Transport until there is an official handover document.
Roadmap for the construction of Ngoc Hoi bridge connecting Hanoi with Hung Yen
|
The Ngoc Hoi bridge construction project connecting Hanoi with Hung Yen is divided into 2 component project groups, with implementation period from 2025-2030.
Prosecution of the bus driver in the accident on National Highway 6 that killed 6 people
|
Son La - The police have prosecuted the driver who caused a serious accident on National Highway 6, killing 6 people and injuring many others.
Exams in Can Tho continue to take place normally
|
Can Tho - Although it is in the process of transferring management units, the exam is still taking place normally, without interruption.
Results of alcohol and drug concentration of the driver in the accident that killed 6 people
|
Son La - The authorities have conducted an alcohol and drug test for the two drivers in the traffic accident that killed 6 people on National Highway 6.
Scene of the accident that killed 6 people on National Highway 6
|
Son La - On the night of February 21, on National Highway 6, a traffic accident occurred between a passenger car and a tractor-trailer, causing many casualties.
Determining the cause of the accident that killed 6 people on National Highway 6
|
Son La - The authorities have determined the preliminary cause of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6, which killed 6 people.
Identities of 6 people who died in a passenger bus accident on National Highway 6
|
Son La - The authorities have identified the victim of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6 that killed 6 people.
5 urgent projects to prevent traffic jams in Ho Chi Minh City are only half open to traffic
|
HCMC - The My Thuy and An Phu intersections, the Tran Quoc Hoan - Cong Hoa connecting road, the Duong Quang Ham road expansion, and National Highway 50 are only half open to traffic due to land clearance problems.
8-lane road in Hanoi after traffic light adjustment
|
The Tran Huu Duc - Trinh Van Bo road (Nam Tu Liem district, Hanoi) has had its traffic light signal adjusted after a persistent traffic jam.
Ho Chi Minh City residents look forward to the day of building a 1,000 billion VND pedestrian bridge
|
HCMC - The pedestrian bridge across the Saigon River connecting Bach Dang Wharf Park with the Saigon Riverside Park is about to start construction, expected on March 29.
Overturning a truck, a car was turned across, dragged on the road
|
Long An - The dashcam recorded images of a 5-seat car crossing the front of a truck at close range and the accident occurred.