Traffic
List of rest stops, temporary North-South expressway stations during holidays
|
The Road Administration has just announced the list of rest stops and temporary stations on the North-South expressway during the April 30th and May 1st holidays.
Cutting the crushed cabin, saving the driver from death after an accident on National Highway 1
|
Lang Son - The accident on National Highway 1 on the night of April 28 caused the truck cabin to be crushed, the male driver was injured and trapped inside.
Hiding license plates to avoid traffic tickets, 7 teenagers handled by Dong Thap traffic police
|
Dong Thap - Traffic police discovered 7 teenagers using tape to cover license plates to evade traffic tickets, and made a record of violations.
Ben Thanh - Thu Thiem Metro opens axis connecting Ho Chi Minh City with Long Thanh airport
|
Ho Chi Minh City - Ben Thanh - Thu Thiem Metro, 6 km long, with a total capital of 46.300 billion VND, will start construction tomorrow morning (April 29), helping to increase connectivity between the center of Ho Chi Minh City and Long Thanh airport.
Fining driver for overtaking barriers to warn of impending train
|
Quang Tri - Driver fined 5 million VND, license revoked for 2 months for crossing a level crossing when the warning signal for a train to arrive.
The project to build a 4,800 billion VND road will accelerate and expand the connection between Tay Ninh - Ho Chi Minh City
|
Tay Ninh - The 823D road construction project, with a total capital of more than VND4,800 billion, is accelerating construction, expected to be completed in 2025, and will connect directly with Ho Chi Minh City.
Arrest of the subject who assaulted an elderly man after a traffic collision in Ho Chi Minh City
|
HCMC - HCMC Police have temporarily detained Nguyen Lam Minh Tuan, a car driver who beat someone in the middle of the road after a traffic collision.
HCMC is about to start construction of 3 key transport projects worth over VND52,500 billion
|
HCMC - Metro No. 2, Nguyen Khoi bridge, Ho Chi Minh City - Long Thanh expressway access road with a total capital of more than VND 52.500 billion will start construction in the last months of 2025.
Close-up of the Nhon - Hanoi Railway Station S10 metro station when welcoming the TBM2 robot
|
Hanoi - TBM tunnel excavator No. 2 named "Daring" has officially entered the S10 underground station of the Nhon - Hanoi Railway Station metro project.
Red sand flood on National Highway 1 causes traffic congestion in Lam Dong
|
Lam Dong - Red sand floodwaters have come down to cover National Highway 1, making it impossible for vehicles in both directions to travel.
Many machines quickly cleared red sand and poured into National Highway 1, causing traffic congestion
|
Lam Dong - On the afternoon of September 15, red sand floodwaters flooded down onto National Highway 1 in Luong Son commune, making it impossible for vehicles in both directions to travel.
Ho Chi Minh City sidewalks are still encroached, the Department of Construction must issue a document for the second time
|
HCMC - The situation of encroachment on sidewalks is still common on many central streets of the city, causing loss of urban beauty and many potential dangers to pedestrians.
Traffic accident on National Highway 26 kills 1 student
|
Dak Lak - After a traffic accident between an electric bicycle and a motorbike, a student died due to severe injuries.
Disguised police record students violating traffic laws, illegal parking lots
|
Hanoi - Traffic police force disguised to record cases of students violating traffic laws and illegal parking lots.
The VND47,607 billion road in Bac Ninh will be completed in 2026
|
Bac Ninh - The locality plans to complete the route connecting Gia Binh airport with Hanoi (through the province) in 2026.
Rescuing a driver trapped in the cabin after a collision on the Vinh Hao - Phan Thiet Expressway
|
Lam Dong - After hitting the rear of a vehicle in the same direction in front on the highway, the driver was injured and trapped in the truck cabin.
Progress of 3 belt routes over 360 km long to relieve traffic jams in the inner city of Ho Chi Minh City
|
HCMC The three Ring Roads 2, 3 and 4 are more than 360 km long, and when completed, the network around the city will be closed, reducing inner-city congestion and strengthening regional connectivity.
Many flooded sections on National Highway 1 will be thoroughly handled in 2026
|
The Ministry of Construction said that in the 2026 plan, the Ministry will handle many flooded sections on National Highway 1.
Truck overturned, sliding on National Highway 55, killing 1 person on the vehicle
|
Lam Dong - A truck traveling on National Highway 55 overturned and slid down the side of the road, killing a woman on the truck.
After nearly 3 years of construction, the 1,500 billion VND project to expand the southern gateway of Ho Chi Minh City is gradually reaching the finish line
|
HCMC - After nearly 3 years of construction, the National Highway 50 expansion project with a total capital of VND1,498 billion has reached 70% of the volume, expected to open to traffic the entire route by the end of this year.