Traffic

Heavy rain combined with high tides, many roads in Ho Chi Minh City submerged in water

|

HCMC - On the evening of November 5, due to the impact of heavy rain combined with high tides, a series of roads in HCMC were submerged in water.

HCMC seeks investors for 4 projects worth over VND57,000 billion to rescue traffic jams at gateways

|

HCMC - 4 projects to upgrade and expand National Highways 1, 13, 22 and the North - South axis road have begun to find investors to start construction in 2026 and complete in 2028.

The gateway road of Ho Chi Minh City is about to become a 12-lane highway, building a series of overpasses and underpasses

|

Ho Chi Minh City - National Highway 1 (from Kinh Duong Vuong Street to Long An border) will be expanded to 10 - 12 lanes, starting construction at the end of 2026 and completed at the end of 2028.

People are tired of waiting for the opening of the traffic jam hot spot at the Northwest gateway of Ho Chi Minh City

|

HCMC - The Truong Chinh and Tan Ky Tan Quy road expansion project has been included by HCMC in the priority investment portfolio, expected to relieve traffic congestion in the Northwest region.

Scene of a crane falling from a tractor-trailer, one person injured in Ho Chi Minh City

|

HCMC - When the vehicle was about to reverse into the construction site, the chain linking the crane on the trailer suddenly broke.

Do not carry a driver's license may be fined 10 million

|

Article 18 of Decree 168 stipulates the penalty when the driver does not carry the driver's license.

The provincial road is damaged in Thai Nguyen with a new appearance after the overhaul

|

Provincial Road 262 through Thai Nguyen City was full of potholes, after the great home helped the means of convenient circulation, reducing the risk of accidents, ensuring safety for people.

The type of vehicle is banned from going to the old town and Ho Guom from 1.3

|

From 1.3, Hanoi piloted for banning cars on 16 seats during rush hour in the old town and Ho Guom area to reduce congestion and environmental pollution.

Nghe An Traffic Police spoke out the car without giving way to the ambulance

|

Nghe An - The information that the car stops the red light does not give way to the ambulance behind, causing a stir in the public opinion.

While visiting the grave, a person was hit and killed by a car

|

Quang Nam - On the way to the grave, a person was unfortunately hit and killed by a car.

22 cases of deduction of driving license points in Hanoi

|

Hanoi - On February 10, the authorities imposed administrative penalties, temporarily detained 94 vehicles, revoked 4 driving licenses, and deducted 22 driving license points.

Ho Chi Minh City expand Highway 13 to 60m, build 4 lanes

|

Ho Chi Minh City is expected to expand Highway 13, the section from Binh Trieu Bridge to Vinh Binh Bridge to 60m and build 4 -lane elevated roads 3.2km long, total capital of 21,700 billion dong.

Secretary, President of Soc Trang went to Cat Nhi mine to urge the supply

|

Soc Trang - leaders of Soc Trang province directly checked and urged sand mines to enhance exploitation, ensuring supply for the highway project.

The number of vehicles receiving traffic fines in Hanoi drops sharply

|

The number of cars sticky with cold penalties in January 2025 in Hanoi decreased by 402 cases compared to the previous month.

The man died after a traffic accident

|

Quang Binh - After the accident, Mr. L was impacted by one person and fell down the road. After being taken to the hospital by the people, Mr. L died.

The road for bicycles along To Lich River in Hanoi is "sluggish"

|

The only road for bicycles in Hanoi along the deserted To Lich River, sometimes a few people walking.

The appearance of an important route in Hanoi after 2 years of construction

|

Hanoi - After 2 years of construction, Le Quang Dao Street has reached 90% of the progress and is on the "sprint" to complete the entire route in May.

23h still seriously congested in Khuat Duy Tien intersection

|

Hanoi - The situation of congestion at Nguyen Trai - Khuat Duy Tien node has no signs of cooling down. At 23:00, people still suffer when moving through this area.

Traffic in Bac Lieu, bottlenecks need to be removed

|

Bac Lieu - No railway, highway, airways, seaports, transportation systems in Bac Lieu have not been completed as a bottleneck that attracts investment.

Not yet identified the license plate will be difficult to test motorbike emissions

|

Although the regulation on emissions inspection with motorbikes has been effective from 1,1,2025, so far this regulation has not been able to implement because there are many problems.