Traffic
Saigon Hot News: Ho Chi Minh City to build 6 metro lines by 2030, inviting 7 ministries and sectors to support
|
Saigon Hot News on March 15: Veterans impressed with quick and streamlined election work thanks to digitization; Ho Chi Minh City builds 6 metro lines by 2030, inviting 7 ministries and sectors to support...
Ho Chi Minh City builds 6 metro lines by 2030, inviting 7 ministries and sectors to support
|
Ho Chi Minh City sets a target to complete 6 metro lines before 2030, and at the same time invites 7 central ministries and sectors to participate in the appraisal team for bidding packages.
Truck crashes into car stopping on Cam Lam - Vinh Hao expressway, 2 people die
|
Khanh Hoa - A serious traffic accident occurred on the Cam Lam - Vinh Hao expressway, killing 2 people and injuring 1 person.
Fining 2 drivers for reckless overtaking on National Highway 20 from people's reflections
|
Lam Dong - From people's reflections, the Traffic Police have verified and fined passenger car and truck drivers for reckless overtaking on National Highway 20.
Ho Chi Minh City accelerates infrastructure investment, creating new growth momentum
|
Ho Chi Minh City is promoting investment in transportation, digital and social infrastructure to remove development bottlenecks, expand urban space and promote economic growth.
2 trucks crushed after strong collision on National Highway 1
|
Ha Tinh - A strong collision on National Highway 1 bypass in Song Tri ward caused severe damage to the front of 2 trucks.
Overview of more than 5,000 personnel and machinery for the heart-shaped construction of the Long Thanh airport project
|
Dong Nai - The Long Thanh airport component project 3 has 14 packages, of which package 5.10 for the construction of the passenger terminal is considered the heart of the project.
Bo Ban Bridge on the national highway has sunk, there is no solution
|
Quang Tri - Bo Ban Bridge is degraded and sunk, causing vehicles to face the risk of insecurity.
fell onto the road after the collision, girl was run over and killed by a car
|
Hanoi After a traffic collision, a girl riding a motorbike fell onto the road and was run over by a passenger car and died on Tran Phu Street, Ha Dong District.
The shape of 2 rest stops on the Vinh Hao - Phan Thiet Expressway is revealed
|
Lam Dong - The items of gas station, parking lot, service house... at the km205 rest stop on the Vinh Hao - Phan Thiet expressway are gradually taking shape.
Over 71 billion VND to fix serious subsidence on National Highway 14
|
Lam Dong - The Provincial People's Committee has approved more than 71 billion VND to fix the subsidence incident on National Highway 14, through Bac Gia Nghia Ward.
Ninh Binh arranges 27 resettlement points for high-speed railway project
|
Ninh Binh - The locality will arrange 27 resettlement points for the high-speed railway project on the North - South axis through the new Ninh Binh province.
Tay Ninh Police inform about the case of buses forcing passengers to get on the side of the road
|
Tay Ninh - The authorities will strengthen inspections and strictly handle buses that speed, overtake recklessly, and force each other to fight for passengers.
HCMC prepares to reclaim land from 389 households to build an elevated road connecting the South and the center
|
Ho Chi Minh City has just allocated 370 billion VND to prepare for land acquisition from 389 households to implement the elevated Binh Tien bridge and road project, connecting the center with the South.
Tay Ninh commits to completing Ho Chi Minh City Ring Road 3 through the province on schedule
|
Tay Ninh - Up to now, the site clearance work for the Ho Chi Minh City Ring Road 3 project has reached 100% of households, completed the resettlement area and arranged plots for people.
Will propose Quang Tri province to repair or rebuild the degraded Cho bridge
|
Quang Tri - Cho Bridge, a vital traffic route in Phu Trach commune, is at risk of being unsafe due to many items being severely degraded after more than 30 years of use.
Despite the danger, many drivers on the Van Ninh - Cam Lo expressway have not completed
|
Quang Tri - Van Ninh - Cam Lo Expressway has not been put into operation, many items are unfinished, but people are driving motorbikes and cars, posing a potential risk of accidents.
4D National Highway landslide causes traffic jam between Lai Chau and Lao Cai
|
Lao Cai - Due to prolonged heavy rain, 2 landslides appeared on National Highway 4D, causing traffic congestion.
HCMC is about to start construction of Metro Line 2, expected to be operational by 2030
|
Ho Chi Minh City is preparing to start construction of Metro Line 2, more than 11 km long, after completing 100% of site clearance work, expected to be operational by the end of 2030.
Reasons why the Dong Ha bypass project is at risk of continuing to be behind schedule
|
Quang Tri - The Dong Ha bypass project is at risk of not reaching the finish line on time despite the extension, due to problems in site clearance.