Traffic

Heavy rain caused landslides at 5 points on Gia Bac Pass, National Highway 28 through Lam Dong completely paralyzed

|

Lam Dong - Heavy rain lasting for many hours caused Gia Bac Pass on National Highway 28 to have 5 landslides, completely paralyzing traffic in both directions.

Dong Nai approves investor's proposal to build a bridge and road longer than 11km connecting to Ho Chi Minh City

|

Dong Nai - The Long Hung Bridge construction project (Dong Nai 2 Bridge) has an starting point intersecting with Ho Chi Minh City Ring Road 3 and an ending point intersecting with National Highway 51.

"death hole" swallows 2 cars in Da Nang, major road continues to crack

|

Da Nang - The area near the "death hole" in the Nguyen Cong Tru street area - from Ngo Quyen street to Tran Hung Dao street continues to have many new cracks.

Construction in 3 shifts to open the billion-dollar expressway in Tuyen Quang on December 19

|

Tuyen Quang - Contractors are speeding up construction, striving to open the Tuyen Quang - Ha Giang expressway to traffic on December 19.

Ho Chi Minh City today: Expanding the eastern road of Ho Chi Minh City to 60 m, welcoming the Cat Lai bridge project

|

Ho Chi Minh City is preparing to widen the eastern road to 60 m, 10 - 12 lanes connecting Cat Lai bridge; Proposal to transfer 1,800 tons of garbage to the Northwest of Ho Chi Minh City for treatment...

Good news about the project to open a 46-56m wide arterial road in Hanoi

|

Hanoi - It is expected that in 2024, Thanh Tri district will complete site clearance for the expansion of National Highway 1A after many years of delay.

Tay Ho: Road subsidence creates deep holes causing traffic safety problems

|

Hanoi - For many years, To Ngoc Van Street (Tay Ho) has had subsidence and deep holes, causing serious traffic insecurity.

Investing 230 billion VND to build a rest stop on Van Phong - Nha Trang highway

|

Khanh Hoa - The investor is bidding to find an investor to implement the rest stop project on the Van Phong - Nha Trang highway with a total investment of more than 230 billion VND.

Preparing to demolish the remaining section of Phong Chau bridge

|

Phu Tho - The remaining section of Phong Chau bridge at risk of collapse, mainly in Phung Nguyen commune, Lam Thao district, is being prepared to be demolished and cleared.

A woman in Thai Binh died on the spot after colliding with a car

|

Thai Binh - After a strong collision with a car coming from the opposite direction, a woman in Nam Cuong commune, Tien Hai district died on the spot.

Revealing the five-digit license plates worth billions in the auction on November 18

|

License plate auction: On November 18, Vietnam Joint Stock Auction Company will auction 10,000 license plates in 6 time frames.

Two new 30-40m wide roads to be built in Hoang Mai, Hanoi

|

Hanoi - Hoang Mai District will build two 30-40m wide roads to help synchronize traffic infrastructure, contributing to the socio-economic development of the southern gateway of the city.

A series of super cool license plates will be available in the session on November 25-26

|

License plate auction: Vietnam Joint Stock Auction Company has announced a list of 20,000 license plates expected to be auctioned on November 25-26, 2024.

Adjusting the hundred billion road project in the heart of Son La city

|

Son La - The project to build a road with a total investment of hundreds of billions of VND in Son La city has just been approved for adjustment by the Provincial People's Committee.

Traffic project stuck because natural forest has not been cleared

|

Quang Tri - The natural forest area that the road passes through has not been cleared, causing the road project to be stuck and behind schedule.

The 2,600 billion VND belt project connecting Ho Chi Minh City - Dong Nai is behind schedule

|

Dong Nai - 3 main packages in the component project 3 of Ho Chi Minh City's Ring Road 3 passing through Nhon Trach district are behind schedule, with only 55% of the construction site completed.

Proposal to expand the range of 4-wheel electric vehicles is well received

|

Currently, information about the proposal to expand the scope of operation of 4-wheel electric vehicles by the Hanoi Department of Transport is receiving much attention from the people.

Hanoi's 5th underpass at risk of being "shelved" waiting for connecting road

|

Hanoi - The Ring Road 2.5 underpass is expected to be completed in 2025, but the road connecting to this tunnel has been unfinished for many years, with no completion date set.

Teenager riding unlicensed car dies after collision with truck

|

Son La - Police are investigating a traffic accident on National Highway 279D through Muong La district that left a teenager dead.

Underground metro section Nhon - Hanoi station revealed

|

Hanoi - The progress of the underground metro section Nhon - Hanoi station has reached 50.27%, in which the TBM excavator has drilled more than 600m underground.