Traffic
Ho Chi Minh City is about to start expanding 5 major roads connecting Tay Ninh
|
Ho Chi Minh City expands National Highway 1, National Highway 22, Nguyen Van Bua street, Ho Chi Minh City - Trung Luong expressway access road and Le Van Luong street to increase connectivity with Tay Ninh province.
Cars congested at the Phan Thiet - Dau Giay expressway exit due to technical errors at the toll station
|
Lam Dong - Technical incident at the Phan Thiet intersection toll station on the Phan Thiet - Dau Giay expressway caused prolonged traffic jams.
Hanoi general sanitation of transport infrastructure, urban embellishment before election day
|
Hanoi generally cleans traffic infrastructure, embellishes green trees, lighting and urban landscape to ensure aesthetics and safety to serve elections.
Technical opening of Hieu Liem bridge across the Dong Nai River on April 30th
|
Dong Nai - Hieu Liem Bridge across the Dong Nai River, the section of Tri An commune, is planned to be technically opened to traffic on April 30th.
Car collides with motorbike on National Highway 3, one person seriously injured
|
Thai Nguyen - An accident occurred between a motorbike and a car on National Highway 3, seriously injuring one person.
Residential road swept away by floodwaters in Lam Dong will be urgently repaired
|
Lam Dong - A residential road about 20m long in Ham Thang ward that was swept away by flood will be surveyed and repaired for people to travel safely.
HCMC today: Preparing to build overpasses and 4 large bridges, with a total investment of 175,000 billion VND
|
HCMC builds 5 bridges larger than VND175,000 billion, ending ferry disaster; Number of people registering to receive unemployment benefits in HCMC decreased by 14.12%...
Expanding 13 km of road and building bridge in Dong Nai connecting the Central Highlands provinces to the airport
|
Dong Nai - Project to upgrade and expand DT 753 and build Ma Da bridge connecting to Long Thanh airport and Cai Mep - Thi Vai port.
Deploying many construction teams of a project worth over VND7,200 billion in Can Tho
|
Can Tho - Despite many difficulties, the project to Upgrade and Expand National Highway 91 (Km0-Km7) worth more than VND 7,200 billion is still being urgently implemented by units.
Collision with a tractor-trailer carrying sand, woman riding an electric motorbike died
|
Lao Cai - A tractor-trailer carrying sand when reaching the intersection of Co Phuc bridge, Tran Yen commune, suddenly collided with an electric vehicle traveling in the same direction, causing one person to die on the spot.
Hanoi tightens management of technology drivers and requires businesses to establish separate regulations
|
Hanoi - The city recommends that departments, branches and localities implement solutions to reduce congestion, ensure traffic order, and tighten the responsibility of businesses in managing drivers.
Hanoi develops a green bus network to increase urban connectivity
|
To improve service quality and reduce emissions, Hanoi prioritizes the development of a green bus system in the public transport network.
A series of drivers without seat belts were recorded by surveillance cameras
|
Through the traffic surveillance camera system, Hanoi City Police have detected many cases of car drivers not wearing seat belts when participating in traffic.
Hot Saigon: The main road in Dong Nai will be expanded to 10 lanes
|
Hot Saigon on December 6: The main road in Dong Nai will be expanded to 10 lanes; Investigation into the cause of the house fire in the alley that killed one person;...
Lawyer guides steps to claim compensation in the case of Da Nang "death hole"
|
Da Nang - Houses cracked, cars were severely damaged after the subsidence incident on Nguyen Cong Tru Street, causing many people to panic.
100% of households agree, Hai Phong promotes Vu Cong Dan project to be completed on time
|
Hai Phong - The household finally agreed to receive compensation and hand over land, helping the Vu Cong Dan road project enter the synchronous construction phase.
Khanh Hoa declares emergency situation to repair traffic damage after floods
|
Khanh Hoa - Khanh Hoa Provincial People's Committee has just announced a natural disaster emergency after a series of national and provincial highways were seriously eroded.
Lam Dong speeds up progress to overcome serious landslides on Gia Bac Pass to open traffic
|
Lam Dong - After many efforts, the volume of soil and rock released on Gia Bac Pass has reached about 65%, the forces are speeding up the progress to soon open to traffic.
HCMC today: More than VND 2,400 billion in compensation for Ring Road 4 site has been disbursed
|
Disburse about VND 2,400 billion to compensate for the construction site of Ho Chi Minh City Ring Road 4 through the old Binh Duong; More than VND 920 million to support people in areas affected by floods.
Solutions to connect Tan Son Nhat and Long Thanh airports by road and rail
|
Ho Chi Minh City is simultaneously implementing belt, high-speed and urban railway projects to enhance the connection between Tan Son Nhat airport and Long Thanh airport.