Hanoi
A series of factories and garages have "grow" on agricultural land in Tan Trieu for many years
|
Hanoi - Tens of thousands of square meters of agricultural land and project planning land in the Tan Trieu area were occupied, surrounded by corrugated iron, and used for the wrong purpose.
Hanoi deploys many free utilities at public administrative service points
|
From August 1, people and businesses who come to do procedures at public administrative service points in Hanoi will be able to use many utilities for free.
Hanoi mobilizes 400 free toilets to serve the parade on September 2
|
Hanoi will arrange a total of 1,012 toilets in the inner city area, around the parade site on September 2.
President Ho Chi Minh Mausoleum reopens from August 2, 2025
|
After a period of restoration, from August 2, 2025, the Ho Chi Minh Mausoleum will continue to open to the public and international visitors.
Hanoi air pollution at red alert level
|
Many areas in Hanoi are foggy, air quality is at an alarming level.
piloting virtual tickets on 2 metro lines in Hanoi from August 1, 2025
|
Hanoi - virtual tickets (non-physical tickets) for daily and weekly tickets on the two urban railway lines (metro) are about to be deployed.
Nguyen Canh Di Street, Hanoi can be completed in 2-3 months
|
Hanoi - The investor said that the construction of Nguyen Canh Di Street (Dinh Cong Ward) will be completed within 2-3 months if the site is fully received.
Initial cause of the subsidence that almost swallowed SH motorbike in Hanoi
|
Hanoi - The authorities have made an initial assessment of the unusual deep hole that appeared on Truong Chinh Street on the evening of July 26.
Proposal to establish another commune-level professional department in Hanoi and specific provinces
|
Hanoi - The Department of Home Affairs proposed to allow the city and some localities with large scale and development characteristics to establish an additional professional department at the commune level.
Hanoi is fully exempted from site clearance to build a road worth over VND6,000 billion
|
Hanoi is speeding up the progress of land acquisition and site clearance to complete the Southern Axis Road project, with an investment capital of more than VND6,000 billion.
Bridge on the billion-dollar road in Hanoi re-constructed in September
|
Hanoi - L3 bridge over Lu river - a package of the Ring Road 2.5 project, Dam Hong - National Highway 1A section, will resume construction in September after many years of suspension.
The nostalgia for children and the will of soldiers on the parade sports field
|
Hanoi - To prepare for the 80th Anniversary of the August Revolution and National Day on September 2, thousands of soldiers are practicing hard at the training ground.
Checking 6 passenger cars, Traffic Police discovered 4 drivers violating traffic laws through camera images
|
Hanoi - In 1 hour, checking 6 passenger cars, traffic police discovered 4 drivers violating the use of phones while driving.
Voters recommend Hanoi to speed up site clearance for Ring Road 4
|
Hanoi - Voters of Me Linh district (old) recommended that the city speed up the progress of compensation and site clearance for the construction of Ring Road 4 in the Capital region.
People suffer from traffic, roads in Hanoi have not yet set a date for repair
|
Hanoi - Nguyen Canh Di Street has been degraded, with many "elephant and chicken cages" that have become a nightmare for many years for people and vehicles.