Society

The suffering of people in residential areas is always flooding in the heart of Hai Phong City

|

Hai Phong - For many years, people in Phu Hai 1 and Phu Hai 3 residential groups, Hung Dao ward have lived with flooding every time there is rain.

National Assembly delegate: Abolish compulsory motorbike insurance because it reduces people's trust

|

According to the National Assembly Delegate, the payment of compulsory civil liability insurance compensation for motor vehicle owners (motorbike insurance) should be commensurate with the rights of the people.

Ho Chi Minh City has thunderstorms with thunderstorms in the middle of the night, many places are heavily flooded

|

HCMC - On the evening of November 4, widespread rain in HCMC caused many roads to be flooded.

Hai Phong City Party Secretary directs to complete sidewalk renovation before December 31

|

Hai Phong - The Secretary of the City Party Committee directed to speed up the progress of sidewalk renovation, upgrading, and road improvement projects, to be completed before December 31, 2025.

Dak Lak people are busy reinforcing their houses to cope with storm No. 13

|

Dak Lak - People in the province are urgently setting up roofs, reinforcing their houses with stone, water bags... to prevent damage when storm No. 13 makes landfall.

Location of the North-South high-speed railway station in Quang Binh

|

Quang Binh - News from the provincial Department of Transport on October 19, the locality is proposing 2 locations to be selected as stations for the North-South high-speed railway.

The North is about to welcome cold air causing continuous thunderstorms

|

A representative of the meteorological agency said that from October 19 to 22, the North will receive two cold air waves.

People in drought and salinity areas are happy to have fresh water tanks

|

Kien Giang - 1,500 domestic water tanks were handed over to the poor, near-poor, and disadvantaged people in the drought and salinity areas of An Minh district.

Sand mine with starting price of 1.2 billion, auctioned for 370 billion VND

|

Sand mine in Dien Ban, Quang Nam was auctioned for 370 billion VND, although the starting price was only 1.2 billion.

Sea surface delivery, the foundation for aquaculture reconstruction in Quang Ninh

|

Quang Ninh - After heavy damage from storm Yagi, many localities with maritime strengths have handed over sea areas to people for production reconstruction.

Hoa Binh considers disciplining 5 party organizations and 12 party members

|

Hoa Binh - Party committees at all levels have inspected and concluded that 15 party organizations and 59 party members have violated the law, of which 5 party organizations and 12 party members were considered for discipline.

A district has only 2/5 of its large bridges intact

|

Phu Tho - Tam Nong district has 5 large bridges spanning 3 rivers, but after Phong Chau bridge collapsed, 2 other bridges were damaged, now only 2 bridges remain intact.

Reasons why people stretched ropes and blocked Tuyen Quang - Phu Tho highway

|

Tuyen Quang - The people blocking the highway originated from a petition to build a new sports field in the locality.

Bomb longer than 1 meter found in residential area

|

Quang Tri - The Engineering Force has disposed of a bomb over 1 meter long discovered during the construction of an electric pole system.

People long for embankments to escape landslides

|

People in Quang Tung commune (Quang Trach district, Quang Binh province) are looking forward to an embankment to help prevent landslides.

Truck stuck on overpass in Hanoi fined

|

A truck driving on the Thai Ha - Chua Boc overpass (Hanoi) causing traffic safety problems was fined by the authorities.

Flooded, traditional market deserted

|

Can Tho - High tides caused the road leading to Binh Thuy market to be heavily flooded, making it difficult for people and traders to buy and sell.

Hanoi clears 664 households to build 40m wide, 6-lane road

|

Hanoi - Thanh Xuan District will reclaim land from 664 households and 17 organizations to build Ring Road 2.5, Nguyen Trai - Dam Hong section, with an investment capital of more than 2,500 billion VND.

How is the progress of the 11,900 billion VND expressway in the West?

|

Soc Trang - Component 4 project of Chau Doc - Can Tho - Soc Trang expressway section through Soc Trang province reached 6.6% of contract value.

How many storms are forecast and when will they appear?

|

A representative of the meteorological agency said that the number of storms in the last two months of the year was approximately equal to or higher than the average of many years.