Society
Morning in the Mekong Delta 22.9: Temporarily detaining subjects stealing materials from APEC construction sites
|
Morning in the Mekong Delta 22.9: Temporarily detaining subjects stealing materials from APEC projects; Maintaining the traditional Mid-Autumn lantern making profession;...
Developing the space along the Red River is inseparable from flood prevention and control
|
Hanoi - According to experts, the process of developing the space along the Red River cannot be separated from the requirement to ensure flood prevention and control safety.
Discovery of a truck carrying 3,060 food products of unknown origin
|
Quang Ninh - Checking a truck on National Highway 18, functional forces discovered 3,060 food products, the driver could not present documents proving the origin.
Hanoi reviews all manhole covers, manhole covers, focusing on areas prone to flooding
|
Hanoi - The City People's Committee requests units to review all manholes and water inlets, especially on roads and areas that are frequently flooded.
Ensuring people have better living conditions after building the Red River Landscape Avenue
|
Hanoi - The city will calculate appropriate plans to ensure that people have better living conditions after implementing the Red River Landscape Avenue project.
Da Nang deploys to remove obstacles for 3 backlog projects
|
Da Nang - Da Nang City People's Committee issued a plan to deploy and remove difficulties and obstacles for backlog and prolonged projects in phase 3.
Rescuing a young man fishing trapped in the middle of a river after hydropower plant discharged floodwater
|
Lam Dong - A person trapped on a sandbar in the middle of a river after Dong Nai 5 hydropower plant discharged floodwaters was promptly rescued by functional forces and brought ashore safely.
Project of 5 intersections in Can Tho at risk of being missed due to site clearance problems
|
Can Tho - The project to renovate and expand 5 key traffic intersections in the city is difficult to complete in 2026 when site clearance is less than 10%.
At the peak of the rainy season, An Giang established another team to take DNA samples of martyrs' remains
|
An Giang - Faced with a large workload and the peak of the rainy season, the Provincial Steering Committee 515 established an additional team to take samples of martyrs' remains.
Ninh Binh invests in repairing the foundation and surface of National Highway 21
|
Ninh Binh approves a project of more than 18.4 billion VND to repair the National Highway 21 section to overcome damage, improve quality and ensure traffic safety.
Warning of heavy rain in 9 provinces, dangerous weather risk in the next 6 hours
|
The meteorological agency warns that the Northern mountainous region and Lam Dong have had moderate to heavy rain; there is a risk of flash floods and landslides in some communes and wards.
Multi-billion VND transportation project is about to be completed, coastal residents of Hue City are excited
|
HUE - The final items of the coastal road and Thuan An estuary overpass project are being urgently completed, coastal people are eagerly waiting for the exploitation day.
Ho Chi Minh City receives land and certification procedures on Saturday morning
|
Ho Chi Minh City - Since implementing the settlement of administrative procedures on Saturday morning, people are satisfied because it saves time and is more convenient when making papers.
Lam Dong urgently overcomes damage after prolonged heavy rain
|
Lam Dong - Prolonged heavy rain causes flooding and landslides in many localities, affecting more than 100 houses and hundreds of hectares of crops, causing damage of about 5 billion VND.
Developing a plan to overcome the subsidence incident of inter-communal roads in Quang Tri
|
Quang Tri - The inter-commune road in Le Thuy commune is seriously subsided, the locality urgently inspects, clarifies the cause and deploys a plan to overcome the incident.
Driving at a speed of 156 km/h, exceeding 76 km/h compared to regulations is disregarding life
|
The female driver drove the car at a speed of 156 km/h on a road section that is only allowed to run at a maximum of 80 km/h on the Noi Bai - Lao Cai expressway.
Dak Lak simultaneously implements peak period against IUU fishing
|
Dak Lak - The province is simultaneously deploying a peak period to implement urgent solutions to remove the European Commission (EC)'s IUU "yellow card" warning.
Heavy rain causes landslides at Ma Phuc Pass, ancient trees fall and block the road
|
Cao Bang - Landslides and large trees have occurred in Tra Linh and Doc Lap communes.
Time when heavy rain in the South gradually decreases at the end of July
|
According to the Southern Hydrometeorological Station, thunderstorms will continue for the next 1-2 days in the area, then gradually decrease.
Lighting up hope in the flood-stricken area of Muong Than
|
Lai Chau - Muong Than people are gradually overcoming losses, igniting hope to rebuild their lives from the joint efforts of the government and the community.
