Society

Wind power project promises to be unstable, muddy roads in Quang Tri are unknown when they will be repaired

|

Quang Tri - After completing two wind power projects, the DH.86 residential road was seriously degraded, but the upgrade plan was delayed due to a broken wind power project.

Cao Bang Stadium may be converted into a park and parking lot

|

Cao Bang - After 2 major floods caused by the circulation of storms No. 10 and 11, Cao Bang City Stadium was severely damaged.

People are worried about landslides digging deep into the Cau River bank after floods

|

Thai Nguyen - The landslides on the Cau River bank in Dong Ang hamlet (Phu Binh) are expanding, causing local people to constantly feel insecure.

Phu Tho changes the purpose of more than 40 hectares of forest land to implement 4 projects

|

Phu Tho - More than 40 hectares of forest land have just been approved by the Provincial People's Council to change the purpose of use to implement 2 projects.

National Highway 12 in Dien Bien is about to open to traffic after recovering from floods

|

Dien Bien - After about a month of vehicles having to take the bypass, National Highway 12 (section through Muong Tung commune) is about to open the main route.

Ca Mau saves 2 crew members whose boat sank at sea

|

Ca Mau - On the afternoon of November 2, information from Khanh Hoi Border Guard Station, Ca Mau said that the unit had just rescued 2 crew members whose boat sank at sea in time.

The second runway at Long Thanh airport must be basically completed before December 19, 2025

|

Dong Nai - Minister of Construction Tran Hong Minh requested ACV to complete the road connecting Long Thanh airport. The second runway will be basically completed before December 19.

Ship carrying 174 thousand tons of ores stranded in Quang Ngai sea will not have oil spills

|

Quang Ngai - Mr. Le Van Luong - Director of the Maritime Port Authority said that the ship carrying 174,000 tons of ore stranded in Dung Quat sea will not have oil spills.

Commune government in Gia Lai speaks out about the case of large trees rising unusually in the middle of the Ayun River bank

|

Gia Lai - Phu Thien commune authorities determined that the large piece of wood that had risen on the banks of the Ayun River had been submerged in water for a long time, with no signs of being newly sawed and the owner unknown.

Forecast of the risk of heavy storm, warning of heavy rain in areas

|

According to the representative of the meteorological agency, storm Kalmaegi is forecast to have strong intensity after entering the East Sea; the Central region continues to be an area at risk of heavy rain.

Forecast of the time when the East Sea will welcome storm No. 13 Kalmaegi and provinces at risk of heavy rain and strong winds

|

It is forecasted that around November 5, the East Sea will welcome storm No. 13 Kalmaegi; there is a risk of strong winds and heavy rain in the Central Central, South Central and Central Highlands provinces.

Cold air intensifies and causes rain, forecast coldest day

|

Due to the strengthening of cold air, the temperature continued to decrease on the night of November 3 and November 4. The mountainous areas of the North will have severe cold, with temperatures dropping below 15 degrees Celsius.

New road to the East of Ho Chi Minh City opens more direction, reducing pressure on Vo Nguyen Giap traffic axis

|

The Vo Nguyen Giap parallel road has just been put into operation, opening a new traffic direction, contributing to reducing pressure on the East of Ho Chi Minh City.

Electric vehicle credit market, economic opportunities and solutions to reduce air pollution in Vietnam

|

carbon credit from electric vehicles helps Vietnam reduce emissions, improve air quality and create green economic momentum towards the Net Zero 2050 target.

Da Nang urgently repairs Duy Phuoc Bridge and Cam Kim Bridge collapsed after floods

|

Da Nang - Vice Chairman of the City People's Committee inspected and directed units to urgently repair collapsed bridges to ensure traffic safety and stabilize people's lives.

Commune police in Da Nang return to landslide areas, supporting people to overcome floods

|

Da Nang - Avuong Commune Police coordinated forces to return to Dang village and Athep village, two areas isolated by landslides to visit and support people after floods.

Banning all cars across the Lo River bridge in Phu Tho

|

Phu Tho - The provincial Department of Construction has just announced the adjustment of traffic flow through the Lo River Bridge, Doan Hung Commune.

The Tax sector focuses on directing the implementation of Vietnam Law Day

|

The Tax Department directs its affiliated units to organize the implementation of Vietnam Law Day to ensure practicality, economy, and efficiency in an appropriate manner.

Urgently relocate assets of 6 households from areas at risk of landslides in Da Nang

|

Da Nang - Ry Station Border Guard coordinated with Hung Son Commune authorities to urgently relocate the assets of 6 households in A Ting village to a safe place.

Da Nang warns of high risk of flash floods and landslides

|

The Central Hydrometeorological Station warns of flash floods and landslides repeating in the mountainous areas of Da Nang due to heavy rain.