Society
Urgently search for 2 fishermen suspected of falling into the sea in Phu Quoc
|
An Giang - Functional forces and surrounding fishing boats are still actively coordinating to participate in the search for 2 fishermen suspected of falling into the sea in Phu Quoc.
Quang Ninh plans to terminate slaughterhouse operations that do not meet conditions
|
Quang Ninh - The Provincial People's Committee has just requested localities to review and complete the plan to terminate the operation of slaughterhouses that do not meet the conditions before October 31.
Voters reflect that the construction of the North-South expressway divides traffic and irrigation
|
The Ministry of Construction has issued a document responding to voters' reflections in Nghe An about the construction of the North-South expressway cutting off traffic and irrigation.
10-day weather forecast from the night of August 3rd to August 13th nationwide
|
The National Center for Hydro-Meteorological Forecasting forecasts the weather for the next 10 days (from the night of August 3 to August 13) in regions across the country.
Heavy rain causes damage of more than 3 billion VND in Lao Cai
|
Lao Cai - Prolonged heavy rain causes flooding and landslides in many areas in Coc San commune and Lao Cai ward, forcing dozens of households to evacuate.
Lao Dong Newspaper displays publications at Lao Cai Spring Press Festival
|
Lao Cai - Lao Dong Newspaper's representative office in the Northwest region participates in displaying publications at the Binh Ngo Spring Press Festival 2026.
Da Nang island commune soldiers on peak combat duty, maintaining peace on islands during Tet
|
Da Nang - Cu Lao Cham soldiers strictly maintain combat readiness duty, strengthen patrols during the Binh Ngo Spring 2026.
Quang Ngai - Hoai Nhon expressway just opened to traffic has temporarily stopped operating
|
Project Management Board 2 temporarily suspended the opening of the Quang Ngai - Hoai Nhon expressway before the Tet opening time due to some technical factors and unsafe operation.
Lien Khuong airport runway continuously peels off, proposal to close for major overhaul
|
Lam Dong - According to the operating unit, for many months, the runway surface of Lien Khuong airport has continuously peeled off and cracked locally, posing a potential safety risk.
Ho Chi Minh City today: Spending 1,100 billion VND to expand the Northwest gateway road 4 times
|
Ho Chi Minh City spends more than 1,100 billion VND to expand the Northwest gateway road 4 times; Staying up all night waiting for the Trade Union flight to take you home for Tet...
Ho Chi Minh City opens a sea-crossing delivery route Can Gio - Vung Tau by UAV
|
Ho Chi Minh City officially operates a sea-crossing delivery route using UAV connecting Can Gio - Vung Tau, shortening the time to 15 minutes/way, 6 times more optimal than roads.
People anxiously waiting to see the horse mascot in Can Tho
|
Can Tho - As horse mascots in other localities gradually reveal themselves, Can Tho people are also anxiously waiting to see the complete horse mascot on the Spring Flower Street.
People flock home, Mien Tay Bus Station in Ho Chi Minh City is crowded with people on the afternoon of the 25th of Tet
|
Ho Chi Minh City - In the afternoon of February 12th (ie, December 25th of the lunar calendar), the number of people flocking to Mien Tay Bus Station increased sharply, when the peak of returning home for Tet began.
Hanoi bus station is still deserted, no need for increased vehicles
|
Hanoi - On the 25th of Tet, bus stations such as Giap Bat, Nuoc Ngam... are not overloaded, the number of passengers has increased slightly, and fares are basically stable.
The reason a 17-year-old girl abandoned her newborn baby in a durian garden
|
Dak Lak - Functional agencies have determined the initial cause of the 17-year-old girl abandoning her newborn child in a durian garden.
Accelerate site clearance for the 4,600 billion VND dry port project in Bac Ninh
|
Bac Ninh - Site clearance for the dry port and logistics service project in Phong Khe is being accelerated.
Fire on the 16th floor of PH apartment building in Khanh Hoa, black smoke rises high
|
Khanh Hoa - Fire on the 16th floor of PH apartment building in Khanh Hoa caused black smoke to rise high, firefighters are urgently extinguishing the fire.
Ho Chi Minh City spends more than 1,100 billion VND to expand the Northwest gateway road 4 times
|
Ho Chi Minh City - Huong Lo 80B (section from Nguyen Anh Thu to Le Van Khuong) was spent more than 1,100 billion VND to expand from 7 - 8 m to 30 m, helping to reduce traffic jams at the Northwest gateway.
Entangled with site clearance, 600 billion VND road unfinished for 2 years
|
Ha Tinh - Due to site clearance issues, the road project connecting Hung Nghiep Formosa Steel and Iron Complex with National Highway 12C has not been able to connect and put into operation.
When Tet is moments of reunion together
|
After more than 1 month, Nestlé Vietnam's 2026 Tet campaign attracted more than 350,000 participants, spreading the message of cherishing the moment of reunion.
