Traffic

Lam Dong provincial leaders directly inspect and direct relief for people in flooded areas

|

Lam Dong - Provincial leaders directly inspected, directed the recovery of flood consequences and visited and encouraged people isolated by floods.

Following the direction of the Chairman of Ho Chi Minh City, the dead end in the center is about to be expanded and connected

|

Ho Chi Minh City is preparing to allocate about 1,073 billion VND to widen Tran Binh Trong Street (from Ly Thai To Street to Hung Vuong) from 5 m to 17 m.

Hung Yen starts construction of a road worth over VND4,900 billion connecting Thai Binh - Pho Hien

|

Hung Yen - On the morning of October 31, Hung Yen province started construction of the road connecting Thai Binh ward with Pho Hien ward, a project worth more than VND4,900 billion, nearly 25 km long.

Railway through Hue opens after damage due to floods

|

HUE - Reopening the railway line through Hue City after historic floods.

National Highway 1 through Quang Tri is deeply flooded in many locations, making traffic difficult

|

Quang Tri - Heavy rain caused National Highway 1 through Quang Trach commune to be deeply flooded, the traffic police force had to divert traffic and warn of danger to people and vehicles.

Applying for a license to relocate and cut nearly 100 trees to open the center of Hanoi wide 50m

|

Hanoi - Functional branches are applying for compassion and moving nearly 100 trees to implement the project of Ring Road 1 section of Hoang Cau - Voi Phuc.

Details of the parade and parade routes will pass on April 30

|

Ho Chi Minh City - Below is the expected roadmap for the parade and parade delegations that will move through on April 30, so that people can take the initiative in moving and monitoring.

Ho Chi Minh City announced a new traffic plan around Tan Son Nhat station

|

Ho Chi Minh City has officially announced the plan to organize the traffic organization connecting Tran Quoc Hoan - Cong Hoa, serving to connect to T3 station of Tan Son Nhat Airport.

On the occasion of 30.4-1.5, Hanoi increased more than 600 vehicles to serve passengers

|

Hanoi - Hanoi Bus Station Joint Stock Company plans to increase more than 600 vehicles to serve the travel needs of people during the holiday on April 30 - 1.5.

North - South highway in Ha Tinh basically completed, about to connect routes

|

Ha Tinh - representative of the investor of 2 projects of the North - South highway through Ha Tinh affirmed that it would be constructed to ensure the progress to clear the main route on April 28.

The 1.4km road causes hardship for people and workers

|

Vinh Long - The project to upgrade 1.4km of roads in Long Ho construction for many months is still unfinished, making people and workers face many difficulties.

Ensure absolute safety of the General Secretary, President of China

|

Hanoi - City Police has completed the task of ensuring absolute safety of the General Secretary, Chinese President Xi Jinping visits Vietnam.

The accident between 2 motorbikes in Kon Tum caused 3 casualties

|

Kon Tum - Two motorbikes running at high speed occurred the accident, causing 2 people to be hospitalized and 1 victim died.

Hanoi adjusts the traffic organization Nguyen Ngoc Vu, paying attention to avoid being penalized

|

Hanoi - Hanoi Department of Construction adjusted the traffic organization on Nguyen Ngoc Vu street from the bridge to 53 Nguyen Ngoc Vu into the double road.

Speeding up the transport project of more than 920 billion dong in Hai Phong

|

Hai Phong - The project of investing in construction of provincial road 354 through Kien Thuy industrial park to coastal road has reached 70% of progress.

The route is nearly 2km long after 15 years of use has not been completed

|

Ninh Binh - the route connecting NH1A to the cement factory, has been seriously degraded but due to the complete settlement, it has not been able to overcome and repair.

The progress of site clearance construction of Tu Lien Bridge

|

Hanoi - Tay Ho District and Dong Anh District are conducting a review of the total land area to be recovered to serve the implementation of the Tu Lien Bridge project.

The child carrying the mother on a motorbike suffered an accident in Binh Thuan

|

Binh Thuan - the son came home from work, took his mother to the death anniversary of his relatives, on the road colliding with motorbikes in the opposite direction, causing his mother and daughter to casualties.

The alternative roadmap when Le Duan Street in Ho Chi Minh City is limited from tonight

|

HCMC - Le Duan Street (from Pham Ngoc Thach to Nam Ky Khoi Nghia) will be restricted to traffic from 9:00 p.m. on April 14.

There is about to have 880 billion overpasses, 4 lanes wide in Ha Dong

|

Hanoi - Overpass of Le Trong Tan, Ha Dong and Highway 6 has a total estimated investment of nearly VND 880 billion, implementing the period of 2026-2028.