Traffic

Quang Ngai accelerates construction of key transport projects

|

Quang Ngai is accelerating site clearance and construction of key transport projects.

Hanoi Ring Road 2.5 is about to be closed

|

Hanoi - Ring Road 2.5 when closed will reduce congestion for Ring Road 2 and Ring Road 3 routes, contributing to the socio-economic development of the Capital.

Hung Yen inspects roads at high risk of accidents

|

Hung Yen - On September 10, Hung Yen Provincial People's Committee requested units to strengthen inspection, handle violations, and review risks of traffic unsafety.

Grab drivers call for turning off apps, concerned about fees on each trip

|

Many Grab drivers reflect that they are not clear about the fee calculation method and the actual amount received per trip, while on social networks, a call to turn off the app on December 12-13 appeared. 9.

8 PM News: Traffic Police Department will propose speeding down when it rains

|

8 PM News on September 10th: Traffic Police Department will advise on mandatory speed reduction when it rains; Hanoi bans many types of vehicles from crossing Thang Long bridge from September 15th;...

Entangled with site clearance, 600 billion VND road unfinished for 2 years

|

Ha Tinh - Due to site clearance issues, the road project connecting Hung Nghiep Formosa Steel and Iron Complex with National Highway 12C has not been able to connect and put into operation.

Collision of 2 motorbikes, 5-year-old child dies tragically under tractor-trailer wheels

|

Lam Dong - Grandparents carrying their grandchild on a motorbike collided with another motorbike, causing the grandchild to be thrown onto the road and run over by a tractor-trailer and die.

Hanoi exempts bus and metro ticket prices to serve people during Tet 2026

|

Hanoi exempts bus and urban railway tickets for 9 days of the 2026 Lunar New Year, serving people and tourists to travel conveniently.

People flock to the airport near Tet, Noi Bai enters peak season

|

Hanoi - Ahead of the Binh Ngo Lunar New Year 2026, Noi Bai International Airport recorded a sharp increase in domestic and international travel demand.

National Highway 1 section passing through Khanh Hoa is still heavily congested due to traffic continuing to return home

|

Khanh Hoa - From the morning of February 12 to this afternoon, thousands of cars of people from southern provinces returning to their hometowns for Tet through National Highway 1 caused serious congestion.

Traffic police place warning lights along highways, drivers can use them when encountering problems

|

Traffic police forces set up 400 warning points on the Phap Van - Nghi Son expressway, increasing accident prevention, ensuring smooth traffic during Tet.

Fining drivers for violating safety distance on Vinh Hao - Phan Thiet expressway

|

Lam Dong - From the dashcam, the driver was fined for driving a sleeper bus without keeping a safe distance from the car running in front on the highway.

Congestion lasting for hours on the access road to the Ho Chi Minh City - Trung Luong expressway

|

On the morning of February 12th (ie December 25th of the lunar calendar), prolonged traffic jams occurred on the access road to the Ho Chi Minh City - Trung Luong expressway, the western gateway area of the city.

Lam Dong traffic police help people return to their hometowns for Tet

|

Lam Dong - In addition to ensuring traffic safety, traffic police organize support and give gifts to people returning to their hometowns for Tet, spreading the beautiful image of serving the people.

Prolonged traffic jam at Deo Ca tunnel, drivers tiredly waiting to return home for Tet

|

Khanh Hoa - Traffic through Deo Ca tunnel on National Highway 1 is prolonged, causing many drivers returning to their hometowns to wait tiredly.

HCMC traffic police guide a series of routes to avoid traffic jams during Tet

|

Faced with the increasing number of vehicles in the days leading up to Tet, Ho Chi Minh City traffic police have proposed many traffic diversion plans at gateways and traffic hotspots.

Cam Lo - La Son expressway limits speed to 50km/h, driver still overtakes recklessly

|

Quang Tri - Although the Cam Lo - La Son expressway is under construction to expand and reduce speed to 50km/h, many drivers still speed and overtake recklessly at the no-overtaking section.

Train crashes into motorbike crossing railway, 1 person dies

|

Lam Dong - Accident between train and motorbike at railway crossing, killing 1 person.

Saigon Hot News: Tan Son Nhat Airport is expected to welcome more than 160,000 passengers on February 11

|

Saigon Hot News: Tan Son Nhat Airport is expected to welcome more than 160,000 passengers on February 11; Perspective of 2 routes 15. 600 billion VND to save traffic jams in East and West HCMC...

Trailer truck collides with motorbike in Lam Dong, 1 person dies

|

Lam Dong - A tractor-trailer from a dragon fruit granary on a branch road to National Highway 1 collided with a motorbike, killing the motorcyclist on the spot.